If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-46668 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.892217,"lon":-79.3337,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Brokenstraw Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: PITT LEASE 2927 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-02-21 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.892217 | |
Longitude: -79.3337 |
Date | Event |
---|---|
2012-02-21 | New Permit Application |
2012-11-01 | Performed Spud Operation |
2012-12-04 | Drilling Completion |
2012-12-04 | Perforation |
2013-06-03 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CATALYST ENERGY INC | 100.00 | 100 | 153.40 | 100 | 234 | 100 |
2014 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CATALYST ENERGY INC | 0.00 | 0 | 50.19 | 152 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 118.1 | 244 | 136.53 | 244 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 179.50 | 365 | 197.88 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 41.90 | 365 | 77.26 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CATALYST ENERGY INC | Fracing Fluid Waste | 36.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | CATALYST ENERGY INC | Produced Fluid | 234.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 77.53 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 8.35 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2016 | CATALYST ENERGY INC | Produced Fluid | 7.80 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 5.48 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 38.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | CATALYST ENERGY INC | Produced Fluid | 266.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2017 | CATALYST ENERGY INC | Produced Fluid | 91.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 141.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 7.14 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 10.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 49.33 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2112106 | Primary Facility | 2012-11-01 | Routine/Complete Inspection | No Violations Noted | |
2117411 | Primary Facility | 2012-11-14 | Routine/Complete Inspection | No Violations Noted | |
2121080 | Primary Facility | 2012-12-06 | Routine/Complete Inspection | No Violations Noted | |
2123455 | Primary Facility | 2012-12-13 | Routine/Complete Inspection | No Violations Noted | |
2190476 | Primary Facility | 2013-08-08 | Administrative/File Review | No Violations Noted | |
2247180 | Primary Facility | 2014-02-20 | Routine/Complete Inspection | No Violations Noted | Conventional oil well on a 3" packer string completed and operational. The location is frozen and snow covered. No leaks or spills. No violations noted at this time |
2688823 | Primary Facility | 2018-01-31 | Routine/Complete Inspection | No Violations Noted | Producing combination well with an electric powered pumpjack attached. Valves appear to be opened. No spills or leaks are noted. The well is tagged and and the site ID sign is on site. This site is stable; snow covered at the time of this inspection. |
For data sources see[7]