If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-46145 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.385264,"lon":-79.772714,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLLOW LOT 82 | |
License Status: Active | |
Spud Date: 2017-07-12 | |
Permit Date: 2017-03-09 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.385264 | |
Longitude: -79.772714 |
Date | Event |
---|---|
2017-03-09 | New Permit Application |
2017-07-12 | Performed Spud Operation |
2017-07-13 | Drilling Completion |
2017-07-26 | Performed Stage 1 of Stimulation |
2017-07-26 | Performed Stage 2 of Stimulation |
2017-07-26 | Performed Stage 3 of Stimulation |
2017-07-26 | Performed Stage 4 of Stimulation |
2017-07-26 | Performed Stage 5 of Stimulation |
2017-07-26 | Performed Stage 6 of Stimulation |
2017-07-26 | Performed Stage 7 of Stimulation |
2017-07-26 | Performed Stage 8 of Stimulation |
2019-05-30 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-07-26 | 1 | Sand | 32,340 | 1,700 | 2,200 |
2017-07-26 | 2 | Sand | 32,340 | 1,700 | 2,400 |
2017-07-26 | 3 | Sand | 32,340 | 0 | 0 |
2017-07-26 | 4 | Sand | 32,340 | 2,200 | 2,380 |
2017-07-26 | 5 | Sand | 32,340 | 2,300 | 2,800 |
2017-07-26 | 6 | Sand | 32,340 | 1,850 | 3,580 |
2017-07-26 | 7 | Sand | 32,340 | 2,600 | 3,500 |
2017-07-26 | 8 | Sand | 32,340 | 2,800 | 3,500 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CATALYST ENERGY INC | 0.00 | 0 | 451.24 | 150 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 42.52 | 365 | 0.00 | 0 |
2019 | CATALYST ENERGY INC | 0.00 | 0 | 259.71 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CATALYST ENERGY INC | Produced Fluid | 31.43 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 9.29 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2017 | CATALYST ENERGY INC | Produced Fluid | 140.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 1,768.95 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 274.29 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 52.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CATALYST ENERGY INC | Produced Fluid | 523.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | CATALYST ENERGY INC | Produced Fluid | 167.86 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 1,017.38 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 15.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 62.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 1,102.86 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 358.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 31.43 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2019 | CATALYST ENERGY INC | Produced Fluid | 198.57 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 94.29 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
2019 | CATALYST ENERGY INC | Produced Fluid | 125.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2577953 | Primary Facility | 2017-03-30 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The E&S plan for the lease was reviewed and is adequate. According to the site plans there will be slopes on roadways greater than 10%. These areas will need monitored to prevent accelerated erosion from occurring during the life of the well. |
2597001 | Primary Facility | 2017-05-17 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The site has been graded and is awaiting stone. The site has not been temporarily stabilized. Temporary stabilization should take place previous to any precipitation. |
2603571 | Primary Facility | 2017-06-12 | Routine/Partial Inspection | No Violations Noted | |
2615553 | Primary Facility | 2017-07-13 | Drilling/Alteration | No Violations Noted | |
2616663 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is drilled, pit is lined with greater than two feet of freeboard. The site is stable there are no E&S issues. |
2618930 | Primary Facility | 2017-07-25 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. Currently setting up for the stimulation of the well. The pit is lined with greater than two feet of freeboard. The site has been mulched, there are no E&S issues. |
2619409 | Primary Facility | 2017-07-26 | Drilling/Alteration | No Violations Noted | |
2627703 | Primary Facility | 2017-08-22 | Administrative/File Review | No Violations Noted | |
2638694 | Primary Facility | 2017-09-13 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site does not have greater than 70% vegetative cover, but is temporarily stabilized. There are no E&S issues. |
2677979 | Primary Facility | 2018-01-03 | Routine/Partial Inspection | No Violations Noted | Inspection shows well active and currently shut down due to the cold weather. Well equipped with rods, tubing, and pump jack with an electric motor. Label attached to the well head with annulus vented to the atmosphere. |
2692495 | Primary Facility | 2018-02-07 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is frozen and snow covered. There are no E&S issues. |
2709686 | Primary Facility | 2018-03-22 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Site is stable, there are no E&S issues. The tank battery for the lease is adjacent to the well pad. Dike appears to be in good shape housing three 210 bbl. stock tanks, two 140 bbl. tanks. Located outside the dike is a 500 bbl. wheelie tank and a 50 bbl. poly tank. |
2756980 | Primary Facility | 2018-07-27 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues. |
For data sources see[8]