X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-46145"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-121-46145
 
| Well ID: 37-121-46145
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.385264, -79.772714 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.385264, -79.772714 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 17: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name: DEEP HOLLOW LOT 82 3494
+
| Farm/Lease Name: DEEP HOLLOW LOT 82
 
|-
 
|-
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/12/2017
+
| Spud Date: 2017-07-12
 
|-
 
|-
| Permit Date: 3/9/2017
+
| Permit Date: 2017-03-09
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.385264
 
| Latitude: 41.385264
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2017-03-09
 +
| New Permit Application
 +
|-
 +
| 2017-07-12
 +
| Performed Spud Operation
 +
|-
 +
| 2017-07-13
 +
| Drilling Completion
 +
|-
 +
| 2017-07-26
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2017-07-26
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2017-07-26
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2017-07-26
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2017-07-26
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2017-07-26
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2017-07-26
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2017-07-26
 +
| Performed Stage 8 of Stimulation
 +
|-
 +
| 2019-05-30
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2017-07-26
 +
| style="text-align: right;" | 1
 +
| Sand
 +
| style="text-align: right;" | 32,340
 +
| style="text-align: right;" | 1,700
 +
| style="text-align: right;" | 2,200
 +
|-
 +
| 2017-07-26
 +
| style="text-align: right;" | 2
 +
| Sand
 +
| style="text-align: right;" | 32,340
 +
| style="text-align: right;" | 1,700
 +
| style="text-align: right;" | 2,400
 +
|-
 +
| 2017-07-26
 +
| style="text-align: right;" | 3
 +
| Sand
 +
| style="text-align: right;" | 32,340
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017-07-26
 +
| style="text-align: right;" | 4
 +
| Sand
 +
| style="text-align: right;" | 32,340
 +
| style="text-align: right;" | 2,200
 +
| style="text-align: right;" | 2,380
 +
|-
 +
| 2017-07-26
 +
| style="text-align: right;" | 5
 +
| Sand
 +
| style="text-align: right;" | 32,340
 +
| style="text-align: right;" | 2,300
 +
| style="text-align: right;" | 2,800
 +
|-
 +
| 2017-07-26
 +
| style="text-align: right;" | 6
 +
| Sand
 +
| style="text-align: right;" | 32,340
 +
| style="text-align: right;" | 1,850
 +
| style="text-align: right;" | 3,580
 +
|-
 +
| 2017-07-26
 +
| style="text-align: right;" | 7
 +
| Sand
 +
| style="text-align: right;" | 32,340
 +
| style="text-align: right;" | 2,600
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2017-07-26
 +
| style="text-align: right;" | 8
 +
| Sand
 +
| style="text-align: right;" | 32,340
 +
| style="text-align: right;" | 2,800
 +
| style="text-align: right;" | 3,500
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 211:
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 451.24
 
| style="text-align: right;" | 451.24
 
| style="text-align: right;" | 150
 
| style="text-align: right;" | 150
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 42.52
 
| style="text-align: right;" | 42.52
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 259.71
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 88: Line 245:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 93: Line 251:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 1,768.95 Bbl
+
| Produced Fluid
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| style="text-align: right;" | 31.43 Bbl
| PA0101508
+
| ROAD SPREADING
 +
|  
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 9.29 Bbl
 
| style="text-align: right;" | 9.29 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D215BWAR
 
| PAS2D215BWAR
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 140.00 Bbl
 +
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 +
|
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,768.95 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 274.29 Bbl
 
| style="text-align: right;" | 274.29 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0023213
 
| PA0023213
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 140.00 Bbl
+
| Produced Fluid
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 
|
 
|-
 
| 2017-0
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 52.86 Bbl
 
| style="text-align: right;" | 52.86 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 31.43 Bbl
+
| Produced Fluid
| ROAD SPREADING
+
| style="text-align: right;" | 523.57 Bbl
|  
+
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 167.86 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1,017.38 Bbl
 
| style="text-align: right;" | 1,017.38 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 523.57 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 15.71 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-24079
+
| PAS2D215BWAR
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 15.71 Bbl
 
| style="text-align: right;" | 15.71 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 62.86 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,102.86 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 358.57 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| PAS2D215BWAR
+
| 34-155-24079
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 31.43 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| BT-008
 
|-
 
|-
| 2018-0
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 167.86 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 198.57 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0023213
 
| PA0023213
 
|-
 
|-
| 2018-0
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 15.71 Bbl
+
| Produced Fluid
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 94.29 Bbl
| WMGR123NW005
+
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| 001-A
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 125.71 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 
|-
 
|-
 
|}
 
|}
Line 297: Line 515:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 13:13, 15 May 2020

Well Details

Well ID: 37-121-46145
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: DEEP HOLLOW LOT 82
License Status: Active
Spud Date: 2017-07-12
Permit Date: 2017-03-09
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.385264
Longitude: -79.772714

For data sources see[1][2][3]

Well History

Date Event
2017-03-09 New Permit Application
2017-07-12 Performed Spud Operation
2017-07-13 Drilling Completion
2017-07-26 Performed Stage 1 of Stimulation
2017-07-26 Performed Stage 2 of Stimulation
2017-07-26 Performed Stage 3 of Stimulation
2017-07-26 Performed Stage 4 of Stimulation
2017-07-26 Performed Stage 5 of Stimulation
2017-07-26 Performed Stage 6 of Stimulation
2017-07-26 Performed Stage 7 of Stimulation
2017-07-26 Performed Stage 8 of Stimulation
2019-05-30 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2017-07-26 1 Sand 32,340 1,700 2,200
2017-07-26 2 Sand 32,340 1,700 2,400
2017-07-26 3 Sand 32,340 0 0
2017-07-26 4 Sand 32,340 2,200 2,380
2017-07-26 5 Sand 32,340 2,300 2,800
2017-07-26 6 Sand 32,340 1,850 3,580
2017-07-26 7 Sand 32,340 2,600 3,500
2017-07-26 8 Sand 32,340 2,800 3,500

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CATALYST ENERGY INC 0.00 0 451.24 150 0.00 0
2018 CATALYST ENERGY INC 0.00 0 42.52 365 0.00 0
2019 CATALYST ENERGY INC 0.00 0 259.71 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CATALYST ENERGY INC Produced Fluid 31.43 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 9.29 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2017 CATALYST ENERGY INC Produced Fluid 140.00 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid 1,768.95 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2017 CATALYST ENERGY INC Produced Fluid 274.29 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017 CATALYST ENERGY INC Produced Fluid 52.86 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CATALYST ENERGY INC Produced Fluid 523.57 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 CATALYST ENERGY INC Produced Fluid 167.86 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 1,017.38 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 15.71 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 15.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 62.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 1,102.86 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 358.57 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 31.43 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE BT-008
2019 CATALYST ENERGY INC Produced Fluid 198.57 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 CATALYST ENERGY INC Produced Fluid 94.29 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A
2019 CATALYST ENERGY INC Produced Fluid 125.71 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2577953 Primary Facility 2017-03-30 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The E&S plan for the lease was reviewed and is adequate. According to the site plans there will be slopes on roadways greater than 10%. These areas will need monitored to prevent accelerated erosion from occurring during the life of the well.
2597001 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The site has been graded and is awaiting stone. The site has not been temporarily stabilized. Temporary stabilization should take place previous to any precipitation.
2603571 Primary Facility 2017-06-12 Routine/Partial Inspection No Violations Noted
2615553 Primary Facility 2017-07-13 Drilling/Alteration No Violations Noted
2616663 Primary Facility 2017-07-13 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is drilled, pit is lined with greater than two feet of freeboard. The site is stable there are no E&S issues.
2618930 Primary Facility 2017-07-25 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. Currently setting up for the stimulation of the well. The pit is lined with greater than two feet of freeboard. The site has been mulched, there are no E&S issues.
2619409 Primary Facility 2017-07-26 Drilling/Alteration No Violations Noted
2627703 Primary Facility 2017-08-22 Administrative/File Review No Violations Noted
2638694 Primary Facility 2017-09-13 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site does not have greater than 70% vegetative cover, but is temporarily stabilized. There are no E&S issues.
2677979 Primary Facility 2018-01-03 Routine/Partial Inspection No Violations Noted Inspection shows well active and currently shut down due to the cold weather. Well equipped with rods, tubing, and pump jack with an electric motor. Label attached to the well head with annulus vented to the atmosphere.
2692495 Primary Facility 2018-02-07 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is frozen and snow covered. There are no E&S issues.
2709686 Primary Facility 2018-03-22 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Site is stable, there are no E&S issues. The tank battery for the lease is adjacent to the well pad. Dike appears to be in good shape housing three 210 bbl. stock tanks, two 140 bbl. tanks. Located outside the dike is a 500 bbl. wheelie tank and a 50 bbl. poly tank.
2756980 Primary Facility 2018-07-27 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues.

For data sources see[8]

References