If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-43588 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.551786,"lon":-79.635749,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Oilcreek Township | |
Operator Name: ENERVEST OPR LLC | |
Well Pad ID: | |
Farm/Lease Name: DEETER 2 | |
License Status: Active | |
Spud Date: 05/08/2001 | |
Permit Date: 2/14/2001 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.551786 | |
Longitude: -79.635749 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2001 | BELDEN & BLAKE CORP | 12,746.00 | 365 | 0.00 | 0.00 | ||
2002 | BELDEN & BLAKE CORP | 9,863.00 | 365 | 0.00 | 0.00 | ||
2003 | BELDEN & BLAKE CORP | 3,489.00 | 365 | 0.00 | 0.00 | ||
2004 | BELDEN & BLAKE CORP | 3,117.00 | 366 | 0.00 | 0.00 | ||
2005 | BELDEN & BLAKE CORP | 2,061.00 | 365 | 0.00 | 0.00 | ||
2006 | BELDEN & BLAKE CORP | 1,357.00 | 365 | 0.00 | 0.00 | ||
2007 | BELDEN & BLAKE CORP | 1,028.00 | 365 | 0.00 | 0.00 | ||
2008 | BELDEN & BLAKE CORP | 1,135.00 | 366 | 0.00 | 0.00 | ||
2009 | BELDEN & BLAKE CORP | 882.00 | 365 | 0.00 | 0.00 | ||
2010 | BELDEN & BLAKE CORP | 974.00 | 365 | 0.00 | 0.00 | ||
2011 | BELDEN & BLAKE CORP | 1,034.00 | 365 | 0.00 | 0.00 | ||
2012 | ENERVEST OPR LLC | 1,066.00 | 365 | 0.00 | 0.00 | ||
2013 | ENERVEST OPR LLC | 983.00 | 365 | 0.00 | 0.00 | ||
2014 | ENERVEST OPR LLC | 875.41 | 365 | 0.00 | 0.00 | ||
2015 | ENERVEST OPR LLC | 985.00 | 365 | 0.00 | 0.00 | ||
2016 | ENERVEST OPR LLC | 986.00 | 366 | 0.00 | 0.00 | ||
2017 | ENERVEST OPR LLC | 956.00 | 365 | 0.00 | 0.00 | ||
2018 | ENERVEST OPR LLC | 963.00 | 365 | 0.00 | 0.00 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2001-A00 | Brine | 35.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2003-A00 | Brine | 123.00 Bbl | Road Spreading | |
2004-A00 | Brine | 20.00 Bbl | Road Spreading | |
2005-A00 | Brine | 38.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2008-A00 | Brine | 55.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2009-A00 | Produced Fluid (in Barrels) | 86.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1028807 | Primary Facility | 05/09/2001 | Drilling/Alteration | No Violations Noted | |
1028810 | Primary Facility | 05/10/2001 | Drilling/Alteration | No Violations Noted | |
1030170 | Primary Facility | 05/14/2001 | Drilling/Alteration | No Violations Noted | |
1032476 | Primary Facility | 05/23/2001 | Drilling/Alteration | No Violations Noted | |
1201876 | Primary Facility | 01/21/2003 | Routine/Complete Inspection | No Violations Noted | |
2839711 | Primary Facility | 2019-02-13 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Dike appears to be in good shape housing a production unit and 100 bbl. poly tank. The site is frozen and snow covered. |
For data sources see[6]