If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 302: | Line 302: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 307: | Line 308: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 1996 | + | | 1996 |
+ | | [[BELDEN & BLAKE CORP]] | ||
| Brine | | Brine | ||
| style="text-align: right;" | 80.00 Bbl | | style="text-align: right;" | 80.00 Bbl | ||
Line 313: | Line 315: | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 1997 | + | | 1997 |
+ | | [[BELDEN & BLAKE CORP]] | ||
| Brine | | Brine | ||
| style="text-align: right;" | 72.00 Bbl | | style="text-align: right;" | 72.00 Bbl | ||
Line 319: | Line 322: | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2001 | + | | 2001 |
+ | | [[BELDEN & BLAKE CORP]] | ||
| Brine | | Brine | ||
| style="text-align: right;" | 1.00 Bbl | | style="text-align: right;" | 1.00 Bbl | ||
Line 325: | Line 329: | ||
| | | | ||
|- | |- | ||
− | | 2003 | + | | 2003 |
+ | | [[BELDEN & BLAKE CORP]] | ||
| Brine | | Brine | ||
| style="text-align: right;" | 21.00 Bbl | | style="text-align: right;" | 21.00 Bbl | ||
Line 331: | Line 336: | ||
| | | | ||
|- | |- | ||
− | | 2004 | + | | 2004 |
+ | | [[BELDEN & BLAKE CORP]] | ||
| Brine | | Brine | ||
| style="text-align: right;" | 3.00 Bbl | | style="text-align: right;" | 3.00 Bbl |
Well ID: 37-121-43182 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.567973,"lon":-79.710643,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cherrytree Township | |
Operator Name: ENERVEST OPR LLC | |
Well Pad ID: | |
Farm/Lease Name: KINLEY RESINGER 1 | |
License Status: Active | |
Spud Date: 1994-06-12 | |
Permit Date: 1994-05-05 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.567973 | |
Longitude: -79.710643 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1996 | BELDEN & BLAKE CORP | 13,448.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | BELDEN & BLAKE CORP | 10,043.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1998 | BELDEN & BLAKE CORP | 8,419.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1999 | BELDEN & BLAKE CORP | 6,991.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2000 | BELDEN & BLAKE CORP | 6,063.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2001 | BELDEN & BLAKE CORP | 5,386.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2002 | BELDEN & BLAKE CORP | 4,344.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | BELDEN & BLAKE CORP | 4,176.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | BELDEN & BLAKE CORP | 3,564.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2005 | BELDEN & BLAKE CORP | 3,405.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | BELDEN & BLAKE CORP | 3,053.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | BELDEN & BLAKE CORP | 2,713.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | BELDEN & BLAKE CORP | 2,893.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2009 | BELDEN & BLAKE CORP | 2,532.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | BELDEN & BLAKE CORP | 2,238.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | BELDEN & BLAKE CORP | 2,735.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | ENERVEST OPR LLC | 2,246.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | ENERVEST OPR LLC | 1,927.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | ENERVEST OPR LLC | 1,846.06 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | ENERVEST OPR LLC | 1,838.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | ENERVEST OPR LLC | 1,791.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ENERVEST OPR LLC | 1,829.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ENERVEST OPR LLC | 1,801.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
1996 | BELDEN & BLAKE CORP | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
1997 | BELDEN & BLAKE CORP | Brine | 72.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2001 | BELDEN & BLAKE CORP | Brine | 1.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2003 | BELDEN & BLAKE CORP | Brine | 21.00 Bbl | Road Spreading | |
2004 | BELDEN & BLAKE CORP | Brine | 3.00 Bbl | Road Spreading |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2576850 | Primary Facility | 2017-03-29 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The dike appears to be in good shape housing a separator and a 140 bbl. fiberglass tank. The site has greater than 70% vegetative cover. There are no E&S issues. |
2655537 | Primary Facility | 2017-11-01 | Routine/Partial Inspection | No Violations Noted | Inspection shows well active with production being recorded on a 96day chart. Production is being produced of the 4-1/2 with a jet star. Annulus is vented to the atmosphere at the well head. GPU and 210fiber glass tank inside diked containment area. |
2835386 | Primary Facility | 2019-01-30 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The dike appears to be in good shape housing a production unit and 100 bbl. fiberglass tank. The site is frozen and snow covered. |
764548 | Primary Facility | 1994-04-27 | Drilling/Alteration | No Violations Noted | |
764716 | Primary Facility | 1994-05-24 | Routine/Complete Inspection | No Violations Noted | |
764891 | Primary Facility | 1994-06-14 | Drilling/Alteration | No Violations Noted | |
764951 | Primary Facility | 1994-06-09 | Routine/Complete Inspection | No Violations Noted | |
764957 | Primary Facility | 1994-06-20 | Routine/Complete Inspection | No Violations Noted |
For data sources see[6]