If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-22051 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.818033,"lon":-77.367411,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Delmar Township | |
Operator Name: SENECA RESOURCES CO LLC | |
Well Pad ID: 155615 | |
Farm/Lease Name: DCNR 007 128HU 52693 | |
License Status: | |
Spud Date: | |
Permit Date: 2019-04-03 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.818033 | |
Longitude: -77.367411 |
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2850772 | Primary Facility | 2019-03-08 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection attended a preconstruction meeting for the Seneca Resources DCNR Tract 007 Pad D located along Baldwin Run Rd in Delmar Twp, Tioga Co. on 3/8/2019 @9030 hours. The weather was 22 degrees, sunny, 3-6" snow on the ground, winds SSW@8mph, 40% humidity. Kirk Gregory, Seneca Resources was present onsite.
Seneca plans to install the Rock Construction Entrance (RCE) and timber the site. Mr. Gregory stated Seneca does not plan to fully construct the well pad at this time. No violations are noted at this time. I departed the site at 1030 hours. |
For data sources see[4]