X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-22507"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-115-22507
 
| Well ID: 37-115-22507
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.771964, -75.675989 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.771964, -75.675989 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: PAYNE D 10
 
| Farm/Lease Name: PAYNE D 10
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2018-08-06
+
| Spud Date: 2018-08-07
 
|-
 
|-
 
| Permit Date: 2018-04-27
 
| Permit Date: 2018-04-27
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.771964
 
| Latitude: 41.771964
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
|
 +
| Deviated
 +
|-
 +
| 2018-04-27
 +
| New Permit Application
 +
|-
 +
| 2018-08-06
 +
| Performed Spud Operation
 +
|-
 +
| 2019-03-10
 +
| Drilling Completion
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 98:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 125:
 
| 2019
 
| 2019
 
| [[CABOT OIL & GAS CORP]]
 
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 3,110,008.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 168
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 112: Line 150:
 
| 2018
 
| 2018
 
| [[CABOT OIL & GAS CORP]]
 
| [[CABOT OIL & GAS CORP]]
| Synthetic Liner Materials (in Tons) RWC 806
+
| Synthetic Liner Materials
 
| style="text-align: right;" | 5.23 Tons
 
| style="text-align: right;" | 5.23 Tons
 
| LANDFILL
 
| LANDFILL
Line 119: Line 157:
 
| 2018
 
| 2018
 
| [[CABOT OIL & GAS CORP]]
 
| [[CABOT OIL & GAS CORP]]
| Drill Cuttings (in Tons) RWC 810
+
| Drill Cuttings
 
| style="text-align: right;" | 364.57 Tons
 
| style="text-align: right;" | 364.57 Tons
 
| LANDFILL
 
| LANDFILL
Line 126: Line 164:
 
| 2019
 
| 2019
 
| [[CABOT OIL & GAS CORP]]
 
| [[CABOT OIL & GAS CORP]]
| Synthetic Liner Materials (in Tons) RWC 806
+
| Waste Water Treatment Sludge
| style="text-align: right;" | 0.34 Tons
+
| style="text-align: right;" | 49.56 Tons
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,427.99 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 18.62 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101247
 
| 101247
Line 133: Line 185:
 
| 2019
 
| 2019
 
| [[CABOT OIL & GAS CORP]]
 
| [[CABOT OIL & GAS CORP]]
| Drill Cuttings (in Tons) RWC 810
+
| Produced Fluid
| style="text-align: right;" | 1,427.99 Tons
+
| style="text-align: right;" | 11,992.91 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE004
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Unused Fracturing Fluid Waste
 +
| style="text-align: right;" | 4.74 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101247
 
| 101247
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 5,295.19 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 0.21 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 301333
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 0.67 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101714
 
|-
 
|-
 
|}
 
|}

Latest revision as of 00:20, 16 May 2020

Well Details

Well ID: 37-115-22507
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 149723
Farm/Lease Name: PAYNE D 10
License Status:
Spud Date: 2018-08-07
Permit Date: 2018-04-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.771964
Longitude: -75.675989

For data sources see[1][2][3]

Well History

Date Event
Deviated
2018-04-27 New Permit Application
2018-08-06 Performed Spud Operation
2019-03-10 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 3,110,008.00 168 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 5.23 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 364.57 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 49.56 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Drill Cuttings 1,427.99 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 18.62 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 11,992.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 4.74 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 5,295.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.21 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.67 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2762412 Primary Facility 2018-08-10 Drilling/Alteration No Violations Noted At time of inspection.

On site for a new spud inspection. Met with company man David Dewberry. United Drilling was on site to drill and set the conductor pipe on the 1H, 4H, 5H, 6H, 7H, 9H, 10H, 12H and 14H wells. All the conductor pipes were set at 92' and Halliburton was on site and cementing them in. The 4H and 5H were cemented and they were on the 6H when I arrived on site. They plan to cement all the wells today. There was a new sign with the permit numbers put at the entrance, the new permit numbers were correct. There are three existing wells on site, the 2H, 3H and 8H. The permit number for the 2H was correct, the 3H was incorrect and there was no permit number for the 8H. The permit numbers were on the entrance sign and correct during prier inspections. David updated the sign before I left the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted

2779908 Primary Facility 2018-09-26 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Shane Brown. PD 181 was on site to drill and set the surface and intermediate casings. There are three existing wells on site that are temporarily plugged and there are nine new wells on site to be drilled. They are on the sixth of the nine wells. They were rigged up on the 1H and drilling the hole for the surface casing with WBM at a depth of 533'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[7]

References