X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-22507"

m
m
Line 104: Line 104:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 109: Line 110:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-M08
+
| 2018
 +
| [[CABOT OIL & GAS CORP]]
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
| style="text-align: right;" | 4.01 Tons
+
| style="text-align: right;" | 5.23 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101247
 
| 101247
 
|-
 
|-
| 2018-M09
+
| 2018
 +
| [[CABOT OIL & GAS CORP]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 364.57 Tons
 
| style="text-align: right;" | 364.57 Tons
Line 121: Line 124:
 
| 101247
 
| 101247
 
|-
 
|-
| 2018-M09
+
| 2019
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 0.88 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2018-M10
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 0.34 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2019-M01
 
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 0.34 Tons
 
| style="text-align: right;" | 0.34 Tons
Line 139: Line 131:
 
| 101247
 
| 101247
 
|-
 
|-
| 2019-M03
+
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 1,427.99 Tons
 
| style="text-align: right;" | 1,427.99 Tons

Revision as of 16:46, 20 August 2019

Well Details

Well ID: 37-115-22507
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 149723
Farm/Lease Name: PAYNE D 10
License Status: Active
Spud Date: 2018-08-06
Permit Date: 2018-04-27
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.771964
Longitude: -75.675989

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials (in Tons) RWC 806 5.23 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings (in Tons) RWC 810 364.57 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Synthetic Liner Materials (in Tons) RWC 806 0.34 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Drill Cuttings (in Tons) RWC 810 1,427.99 Tons LANDFILL 101247

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2762412 Primary Facility 2018-08-10 Drilling/Alteration No Violations Noted At time of inspection.

On site for a new spud inspection. Met with company man David Dewberry. United Drilling was on site to drill and set the conductor pipe on the 1H, 4H, 5H, 6H, 7H, 9H, 10H, 12H and 14H wells. All the conductor pipes were set at 92' and Halliburton was on site and cementing them in. The 4H and 5H were cemented and they were on the 6H when I arrived on site. They plan to cement all the wells today. There was a new sign with the permit numbers put at the entrance, the new permit numbers were correct. There are three existing wells on site, the 2H, 3H and 8H. The permit number for the 2H was correct, the 3H was incorrect and there was no permit number for the 8H. The permit numbers were on the entrance sign and correct during prier inspections. David updated the sign before I left the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted

2779908 Primary Facility 2018-09-26 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Shane Brown. PD 181 was on site to drill and set the surface and intermediate casings. There are three existing wells on site that are temporarily plugged and there are nine new wells on site to be drilled. They are on the sixth of the nine wells. They were rigged up on the 1H and drilling the hole for the surface casing with WBM at a depth of 533'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[6]

References