X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22491

Well Details

Well ID: 37-115-22491
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 147696
Farm/Lease Name: ADAMS J 001
License Status:
Spud Date: 2018-07-02
Permit Date: 2018-03-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.771450
Longitude: -75.699997

For data sources see[1][2][3]

Well History

Date Event
Deviated
2018-03-22 New Permit Application
2018-07-02 Performed Spud Operation
2018-11-25 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-12-22 2019-01-13 7,354 16,425,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 15.1717 24,647,000.0
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.0236082 38352.4
Hydrochloric Acid 7647-01-0 15 0.0472164 76704.9
Other Chemical(s) Listed Above See Trade Name(s) List alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00111863 1817.26
Glutaral 111-30-8 26.7 0.00232866 3783.01
ethanal 64-17-5 2.8 0.000244204 396.72
Ethoxylated alcohol 68131-39-5 10 0.000103045 167.401
Ammonium Chloride 12125-02-9 1.5 0.00167795 2725.89
Methanol 67-56-1 20 0.00330093 5362.5
Water 7732-18-5 7.5 0.0236082 38352.4
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0223726 36345.2
organic phosphonic salts 15827-60-8 15 0.0024757 4021.87
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000463116 752.35
didecyldimethylammonium chloride 7173-51-5 8 0.00069511 1129.23
oleic acid diethanolamide 93-83-4 1.5 0.00167795 2725.89
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00020609 334.801
formic acid 64-18-6 10 0.000103045 167.401
Citric acid 77-92-9 30 0.00086977 1412.97
Cinnamaldehyde 104-55-2 10 0.000103045 167.401
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.000103045 167.401
isoproyl alcohol 67-63-0 5 0.00005152 83.7
Biocide, MBC-516 Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000463116 752.35
didecyldimethylammonium chloride 7173-51-5 8 0.00069511 1129.23
Glutaral 111-30-8 26.7 0.00232866 3783.01
Water 7732-18-5 56.7 0.00494688 8036.41
ethanal 64-17-5 2.8 0.000244204 396.72
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 84.3725 137,066,000.0
Scale Inhibitor, KSI-19 Keane Scale Inhibitor Water 7732-18-5 65 0.010728 17428.1
Methanol 67-56-1 20 0.00330093 5362.5
organic phosphonic salts 15827-60-8 15 0.0024757 4021.87
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Ethylene glycol 107-21-1 40 0.00041218 669.603
isoproyl alcohol 67-63-0 5 0.00005152 83.7
formic acid 64-18-6 10 0.000103045 167.401
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00020609 334.801
Ethoxylated alcohol 68131-39-5 10 0.000103045 167.401
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.000103045 167.401
Cinnamaldehyde 104-55-2 10 0.000103045 167.401
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000144962 235.496
Citric acid 77-92-9 30 0.00086977 1412.97
Friction Reducer, KFR-16FW Keane Friction Reducer Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0223726 36345.2
oleic acid diethanolamide 93-83-4 1.5 0.00167795 2725.89
Ammonium Chloride 12125-02-9 1.5 0.00167795 2725.89
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00111863 1817.26
Water 7732-18-5 60 0.0671179 109036

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 6,643,993.00 298 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 12.13 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 58.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Drill Cuttings 1,677.45 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 90.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 97.09 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 22.46 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 17,232.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 2.83 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 8,237.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.12 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.06 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2748416 Primary Facility 2018-07-03 Drilling/Alteration No Violations Noted At time of inspection.

On site for a new spud inspection. Met with company man David Dewberry. United Drilling was on site to drill and run the conductor pipe for the 1H, 2H,3H, 5H, 7H, 8H and 10H wells. There was one auger rig and two air rigs running when I arrived on site. There was an air rig on the 1H at a depth of 7.5'. The 2H was drilled to a depth of 105' and the auger rig was going in to clean out to bottom and run the conductor pipe. The 3H was completed and the conductor pipe was in the hole at a depth of 105'. The 5H was at a depth of 8'. The 7H was at a depth of 6.5'. The second air rig was rigging up on the 8H which was at a depth of 8.5'. The 10H was drilled to a depth of 105'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2750986 Primary Facility 2018-07-09 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as part of an investigation into a nearby water supply complaint in which the water well was impacted by a heavy sediment load on 7/3/18. As Photo #2 shows, new wells have recently been spud on this pad. A review of the most recent Department Drilling Inspection, Inspection Record No. 2748434 found that conductor pipe was installed on 7/3/18 for 7 wells, the 1H, 2H, 3H, 5H, 7H, 8H, and the 10H. The conductors were all drilled to a depth of approximately 105'. During the 7/3/18 inspection, the inspector noted that 3 Rigs were being operated, one auger rig and two air rigs. No E&S issues were identified. No violations noted.
2763305 Primary Facility 2018-08-14 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Will Dean. PD 181 was on site to drill and set the surface and intermediate casings. There are two existing wells on site that are temporarily plugged and there are seven new wells on site to be drilled. They are on the sixth of the seven wells. They were drilling the hole for the surface casing with WBM on the 7H when I arrived on site. I took a walk around the location and there were no obvious concerns noticed. The holes in the containment that were noticed in the last inspection were repaired. There were no violations noted.

2830122 Primary Facility 2019-01-22 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company man Andy Rodriguez. Keane was on site to frac the 1H, 2H, 3H, 5H, 7H, 8H and 10H wells. They were stimulating stage 10 out of 50 stages on the 10H and running a plug and perf in the 2H when I arrived on site. The 1H was completed with 51 stages. There were 20 stages completed out of 58 on the 2H. There were 49 stages completed out of 50 on the 3H. There were 49 stages completed out of 51 on the 5H. There were 21 stages completed out of 23 on the 7H. The 8H wasn't started but will have 30 stages. The water was being trucked to the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2850442 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Present during the inspection was Cabot Site Supervisor Steve Gillman. Stimulation activities have been completed and site is currently being demobilized. Production equipment installation is also occurring. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted.

For data sources see[8]

References