Well ID: 37-115-22006 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.769083,"lon":-75.608203,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Gibson Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 152558 | |
Farm/Lease Name: BOLCATO G 10 | |
License Status: Active | |
Spud Date: 07/02/2015 | |
Permit Date: 5/14/2015 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.769083 | |
Longitude: -75.608203 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 692,008.03 | 57 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 2,685,438.41 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 1,663,869.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 340,425.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2015-2 | Drill Cuttings (in Tons) | 1,730.99 Tons | LANDFILL | 101247 |
2015-2 | Drilling Fluid Waste (in Barrels) | 22.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2015-2 | Drilling Fluid Waste (in Barrels) | 676.19 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016-2 | Fracturing Fluid Waste (in Barrels) RWC 805 | 11,393.21 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE004 |
2016-2 | Fracturing Fluid Waste (in Barrels) RWC 805 | 9,545.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016-2 | Fracturing Fluid Waste (in Barrels) RWC 805 | 19.02 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-2 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 59.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016-2 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 408.80 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-2 | Other Oil & Gas Wastes (in Tons) RWC 899 | 0.10 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2016-2 | Produced Fluid (in Barrels) RWC 802 | 2,126.97 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE004 |
2016-2 | Produced Fluid (in Barrels) RWC 802 | 2,426.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016-2 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 15.17 Tons | LANDFILL | THR029 |
2016-2 | Synthetic Liner Materials (in Tons) RWC 806 | 17.08 Tons | LANDFILL | 101247 |
2017-01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 2.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017-01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 31.80 Bbl | REUSE (AT WELL PAD) | |
2017-01 | Produced Fluid (in Barrels) RWC 802 | 867.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-01 | Produced Fluid (in Barrels) RWC 802 | 2,477.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017-01 | Synthetic Liner Materials (in Tons) RWC 806 | 2.46 Tons | LANDFILL | 101247 |
2017-01 | Waste Water Treatment Sludge (in Tons) RWC 804 | 32.36 Tons | LANDFILL | 100933 |
2017-02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 9.20 Bbl | REUSE (AT WELL PAD) | |
2017-02 | Produced Fluid (in Barrels) RWC 802 | 414.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-02 | Produced Fluid (in Barrels) RWC 802 | 1,590.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017-02 | Waste Water Treatment Sludge (in Tons) RWC 804 | 44.53 Tons | LANDFILL | THR029 |
2017-03 | Produced Fluid (in Barrels) RWC 802 | 298.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-03 | Produced Fluid (in Barrels) RWC 802 | 1,230.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017-04 | Produced Fluid (in Barrels) RWC 802 | 85.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-04 | Produced Fluid (in Barrels) RWC 802 | 1,045.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017-05 | Produced Fluid (in Barrels) RWC 802 | 964.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017-05 | Waste Water Treatment Sludge (in Tons) RWC 804 | 2.36 Tons | REUSE (AT WELL PAD) | |
2017-06 | Produced Fluid (in Barrels) RWC 802 | 75.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-06 | Produced Fluid (in Barrels) RWC 802 | 689.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017-07 | Produced Fluid (in Barrels) RWC 802 | 18.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-07 | Produced Fluid (in Barrels) RWC 802 | 719.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017-08 | Produced Fluid (in Barrels) RWC 802 | 547.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-08 | Produced Fluid (in Barrels) RWC 802 | 76.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017-09 | Produced Fluid (in Barrels) RWC 802 | 503.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-10 | Produced Fluid (in Barrels) RWC 802 | 429.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-10 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2017-11 | Produced Fluid (in Barrels) RWC 802 | 421.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-12 | Produced Fluid (in Barrels) RWC 802 | 421.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-01 | Produced Fluid (in Barrels) RWC 802 | 212.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-01 | Produced Fluid (in Barrels) RWC 802 | 88.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-01 | Produced Fluid (in Barrels) RWC 802 | 110.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018-02 | Produced Fluid (in Barrels) RWC 802 | 337.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-02 | Produced Fluid (in Barrels) RWC 802 | 12.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018-03 | Produced Fluid (in Barrels) RWC 802 | 62.78 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-03 | Produced Fluid (in Barrels) RWC 802 | 228.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-03 | Produced Fluid (in Barrels) RWC 802 | 55.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018-04 | Produced Fluid (in Barrels) RWC 802 | 75.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-04 | Produced Fluid (in Barrels) RWC 802 | 165.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-04 | Produced Fluid (in Barrels) RWC 802 | 118.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018-05 | Produced Fluid (in Barrels) RWC 802 | 254.97 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-05 | Produced Fluid (in Barrels) RWC 802 | 50.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-05 | Produced Fluid (in Barrels) RWC 802 | 12.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018-06 | Produced Fluid (in Barrels) RWC 802 | 195.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-06 | Produced Fluid (in Barrels) RWC 802 | 137.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-07 | Produced Fluid (in Barrels) RWC 802 | 148.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-07 | Produced Fluid (in Barrels) RWC 802 | 166.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-08 | Produced Fluid (in Barrels) RWC 802 | 260.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-09 | Produced Fluid (in Barrels) RWC 802 | 281.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-10 | Produced Fluid (in Barrels) RWC 802 | 287.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-11 | Produced Fluid (in Barrels) RWC 802 | 217.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-11 | Produced Fluid (in Barrels) RWC 802 | 28.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018-12 | Produced Fluid (in Barrels) RWC 802 | 229.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-12 | Produced Fluid (in Barrels) RWC 802 | 49.36 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019-01 | Produced Fluid (in Barrels) RWC 802 | 253.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019-02 | Produced Fluid (in Barrels) RWC 802 | 222.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019-03 | Produced Fluid (in Barrels) RWC 802 | 64.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019-03 | Produced Fluid (in Barrels) RWC 802 | 157.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2389963 | Primary Facility | 07/01/2015 | Preoperation Inspection | No Violations Noted | On 7/1/15, the Department conducted a Preoperational inspection of the Cabot Bolcato G Pad located in Gibson Township, Susquehanna County. The well pad is approximately 95% complete with all E&S BMP’s installed per plan. No construction has been done on the tank pad. The tank pad is not going to be built. The plan for water delivery to this location is to pipe water from the nearby Aldrich Pad. All filter sock controls have been installed for the tank pad. Crews actively repairing minor damage that recent heavy rains have caused. No violations noted. The well permits that have been issued for the pad are: Bolcato G. 3H(115-22015), 5H(115-22016), 6H(115-22004), 8H(115-22005), and the 10H(115-22006). |
2390870 | Primary Facility | 07/20/2015 | Drilling/Alteration | No Violations Noted | |
2403186 | Primary Facility | 08/31/2015 | Routine/Complete Inspection | No Violations Noted | |
2404902 | Primary Facility | 09/04/2015 | Routine/Complete Inspection | No Violations Noted | |
2480577 | Primary Facility | 2016-05-03 | Routine/Complete Inspection | No Violations Noted | |
2518350 | Primary Facility | 2016-09-12 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:15p.m., Baker Hughes was the frack company on site to frack the wells. I met with company man Mike Vollmer. They just completed stage 13 and were running the plug and perforations on the 10H. I took a walk around the location and everything looked OK.
They have completed 0 out of 27 stages on the 2H, 13 out of 38 stages on the 5H, 13 out of 46 stages on the 6H, 12 out of 43 stages on the 8H, and 13 out of 39 stages on the 10H. All the water was being hauled in and pumped into tanks near the site entrance and then pumped through a poly line to a larger set of tanks on the other side of the site. All the tanks were on containment and the containment was in good condition. I left the site at 14:10p.m. |
2538777 | Primary Facility | 2016-10-18 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 11 AM. I initially met with Paul Hovan, Environmental Consultant of Tioga Environmental Consulting LLC. Williams was in preparation to install natural gas pipeline from this pad to the nearby Gibson pipeline according to Mr. Hovan. After talking to Mr. Hovan, I met with Heath Benton, site company completions consultant of Cabot, Mark Miller, consultant of Cabot and Johnny Crawford, Workover Superintendent of Cabot in the company man trailer. Mr. Denton stated the following. "There are (2) Cudd Energy services coil tubing units in the process of drilling out frac plugs on the 2H and 10H wells. They started last Thursday. The frac job was done on Friday. There will be (26) plugs drilled out on the 2H and (26) on the 10H well. Freshwater, recycled water left over from the frac, gel and friction reducer is used in the wells to drill the plugs out. Fluid flows out of the wells, goes through plug catchers, and then to gas buster tanks and then settles in frac tanks. The frac plugs |
2539229 | Primary Facility | 2016-11-16 | Incident- Response to Accident or Event | Violation(s) Noted | The Department, Briana Cunningham, DEP O&G WQS and I arrived at the site at 11:30 AM to conduct an investigation of the spill incident.
The Department, Briana Cunningham, DEP O&G WQS and I arrived at the site at 11:30 AM to conduct an investigation of the spill incident. We initially met with Kevin Hagadorn, lead flow hand of Erick Flowback Services Incorporated, the Cabot subcontractor in the process of conducting flowback operations on the Bolcato wells. Mr. Hagadorn stated that flowback of the wells is nearly complete and we are cleaning out sand from the wells. Natural gas is sent directly to sales according to Mr. Hagadorn and there is another crew on-site setting the wells up for production. The Department informed Mr. Hagadorn that they had mobilized to the site in order to investigate the spill incident. Mr. Hagadorn contacted Mr. Watson to inform him that the Department was at the site in preparation to assess the spill incident. Upon completion of our conversation with Mr. Hagadorn, the Depar |
2552317 | Primary Facility | 2017-01-11 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:55p.m., the well was recently completed and is in production. The well tag was on the well and correct. The cellar had ice at the bottom, the (20x13) vent pipe was open and venting into a small plastic tank, the (13x9) vent pipe was open and venting into a small plastic tank, the (9x5) vent pipe was open and venting into a small plastic tank. There was 691psi on the production casing. The well was producing through a separator and the production fluid was going into a 500bbl flow back tank that was on containment and the containment appeared to be in good condition. There were three 500bbl tanks at the far corner of the site on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 13:35p.m. |
2639537 | Primary Facility | 2017-09-25 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. It was producing through a sand separator. All the annulus vent lines were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2657165 | Primary Facility | 2017-11-02 | Routine/Complete Inspection | No Violations Noted | This inspection was conducted as a routine complete inspection. Well site is stable. Any silt sock still present appears as if it could be removed. No violations noted. |
2745600 | Primary Facility | 2018-06-26 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was a crew on the site putting down stone and rolling the pad. There was also remedial work done on the slopes. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2844239 | Primary Facility | 2019-02-25 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of water and ice and there was no bubbling noticed. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 2/5/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2539229 | 772814 | 2016-11-16 | 2016-11-16 | CSL 402(b) | Environmental Health & Safety | Potential for pollutional substances to enter the waters of the commonwealth. |
2539229 | 772815 | 2016-11-16 | 2016-11-16 | 78.56(a) | Environmental Health & Safety | Failure to contain a pollutional substance in a properly lined pit or tank. |
2539229 | 772816 | 2016-11-16 | 2016-11-16 | SWMA 301 | Environmental Health & Safety | Failure to properly store, transport, process or dispose of a residual waste. |
2539229 | 772817 | 2016-11-16 | 2016-11-16 | OGA3218.2(A) | Environmental Health & Safety | Containment for Unconventional wells. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
772814 | 348928 | NOV - Notice of Violation | 2017-04-03 | ||||
772815 | 348928 | NOV - Notice of Violation | 2017-04-03 | ||||
772816 | 348928 | NOV - Notice of Violation | 2017-04-03 | ||||
772817 | 348928 | NOV - Notice of Violation | 2017-04-03 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/31/2016 | 10/10/2016 | 7102 | 16,414,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand, White, 100 mesh | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients are listed below the green line. | Listed Below | 0 | 0.512518 | 803606 |
Scaletrol 720, 330 gl tote | Baker Hughes | Scale Inhibitor | MSDS and Non-MSDS Ingredients are listed below the green line. | Listed Below | 0 | 0.0115422 | 18097.7 | |
Other Chemical(s) | Baker Hughes | See Trade Name(s) List | Water | 7732-18-5 | 85 | 0.255707 | 401004 | |
Ferrotrol 300L (Totes) | Baker Hughes | Iron Control | MSDS and Non-MSDS Ingredients are listed below the green line. | Listed Below | 0 | 0.001608 | 2521.35 | |
Scaletrol 5279 | Baker Hughes | Scale Inhibitor | MSDS and Non-MSDS Ingredients are listed below the green line. | Listed Below | 0 | 0.0039539 | 6199.57 | |
HCl, 10.1 - 15% | Baker Hughes | Acidizing | MSDS and Non-MSDS Ingredients are listed below the green line. | Listed Below | 0 | 0.233935 | 366800 | |
Alpha 1427, 55 gl drum | Baker Hughes | Biocide | MSDS and Non-MSDS Ingredients are listed below the green line. | Listed Below | 0 | 0.0223276 | 35008.8 | |
CI-14 | Baker Hughes | Corrosion Inhibitor | MSDS and Non-MSDS Ingredients are listed below the green line. | Listed Below | 0 | 0.0003699 | 580 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 87.2694 | 136,858,000.0 | |
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt | 71050-62-9 | 20 | 0.0023081 | 3619.54 | ||||
Methanol | 67-56-1 | 100 | 0.0003698 | 580 | ||||
Oleamide DEA | 93-83-4 | 2 | 0.0017592 | 2758.79 | ||||
Crystalline Silica (Quartz) | 14808-60-7 | 100 | 12.3522 | 19,371,000.0 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0263878 | 41381.8 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.0045529 | 7139.94 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00001850 | 29 | ||||
Calcium Chloride | 10043-52-4 | 5 | 0.000577 | 904.885 | ||||
Poly (acrylamide-co-acrylic acid) partial sodium salt | 62649-23-4 | 30 | 0.0263878 | 41381.8 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0017592 | 2758.79 | ||||
Modified carboxylic acid salt | Trade Secret | 17 | 0.0006721 | 1053.93 | ||||
Ethanol | 64-17-5 | 5 | 0.0011162 | 1750.44 | ||||
Fatty Acids | 61790-12-3 | 10 | 0.00003700 | 58 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.0066972 | 10502.6 | ||||
Sorbitan Monooleate | 1338-43-8 | 0.5 | 0.0004398 | 689.697 | ||||
Phosphonate Salt | Trade Secret | 2 | 0.00007910 | 123.991 | ||||
Sodium Bisulfite | 7631-90-5 | 1 | 0.00003950 | 61.9957 | ||||
Olefin | 64743-02-8 | 5 | 0.00001850 | 29 | ||||
Modified Thiourea Polymer | 68527-49-1 | 7 | 0.00002590 | 40.6 | ||||
Polyoxythylene Sorbitan Monooleate | 9005-65-6 | 0.5 | 0.0004398 | 689.697 | ||||
Ethylene Glycol | 107-21-1 | 45 | 0.0067744 | 10623.8 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0350881 | 55025.8 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000370 | 5.8 | ||||
Citric Acid | 77-92-9 | 60 | 0.0009647 | 1512.81 | ||||
Ammonium Chloride | 12125-02-9 | 3 | 0.0026388 | 4138.18 | ||||
Potassium Chloride | 7447-40-7 | 1 | 0.0001154 | 180.977 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.0022324 | 3500.88 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.0011162 | 1750.44 | ||||
Polyoxyalkylenes | 68951-67-7 | 30 | 0.000111 | 174 | ||||
Sand, White, 40/70 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients are listed below the green line. | Listed Below | 0 | 11.8417 | 18,567,400.0 | |
FRW-18 | Baker Hughes | Friction Reducer | MSDS and Non-MSDS Ingredients are listed below the green line. | Listed Below | 0 | 0.087973 | 137939 |
For data sources see[7]