X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-21782"

m
m
Line 140: Line 140:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 145: Line 146:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2014-S02
+
| 2014
 +
| [[CHIEF OIL & GAS LLC]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 516.72 Tons
 
| style="text-align: right;" | 516.72 Tons
Line 151: Line 153:
 
| 100933
 
| 100933
 
|-
 
|-
| 2014-S02
+
| 2014
 +
| [[CHIEF OIL & GAS LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 1,262.36 Bbl
 
| style="text-align: right;" | 1,262.36 Bbl
Line 157: Line 160:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2015-S01
+
| 2015
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 110.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC018
 +
|-
 +
| 2015
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 1,097.90 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 +
|-
 +
| 2015
 +
| [[CHIEF OIL & GAS LLC]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
| style="text-align: right;" | 533.97 Tons
+
| style="text-align: right;" | 51.87 Tons
 
| LANDFILL
 
| LANDFILL
| 100933
+
| 301358
 
|-
 
|-
| 2015-S01
+
| 2015
 +
| [[CHIEF OIL & GAS LLC]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
| style="text-align: right;" | 51.87 Tons
+
| style="text-align: right;" | 533.97 Tons
 
| LANDFILL
 
| LANDFILL
| 301358
+
| 100933
 
|-
 
|-
| 2015-S01
+
| 2015
 +
| [[CHIEF OIL & GAS LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 275.00 Bbl
 
| style="text-align: right;" | 275.00 Bbl
Line 175: Line 195:
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2015-S01
+
| 2016
| Drilling Fluid Waste (in Barrels)
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 1,097.90 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123
 
|-
 
| 2015-S01
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 110.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC018
 
|-
 
| 2016-S02
 
 
| Fracturing Fluid Waste (in Barrels) RWC 805
 
| Fracturing Fluid Waste (in Barrels) RWC 805
 
| style="text-align: right;" | 180.00 Bbl
 
| style="text-align: right;" | 180.00 Bbl
Line 193: Line 202:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2017-M03
+
| 2017
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 +
| style="text-align: right;" | 12.14 Tons
 +
| LANDFILL
 +
| 100933
 +
|-
 +
| 2017
 +
| [[CHIEF OIL & GAS LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 180.00 Bbl
 
| style="text-align: right;" | 180.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
| WMGR123
|-
 
| 2017-M05
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 12.14 Tons
 
| LANDFILL
 
| 100933
 
 
|-
 
|-
 
|}
 
|}

Revision as of 15:27, 20 August 2019

Well Details

Well ID: 37-115-21782
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 151256
Farm/Lease Name: CLARK UNIT 2H
License Status: Regulatory Inactive Status
Spud Date: 2014-11-05
Permit Date: 2014-05-09
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.671439
Longitude: -75.952261

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) 516.72 Tons LANDFILL 100933
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 1,262.36 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 1,097.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) 51.87 Tons LANDFILL 301358
2015 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) 533.97 Tons LANDFILL 100933
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 275.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste (in Barrels) RWC 805 180.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 CHIEF OIL & GAS LLC Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 12.14 Tons LANDFILL 100933
2017 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 180.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2294306 Primary Facility 2014-07-18 Routine/Partial Inspection No Violations Noted
2341249 Primary Facility 2015-02-04 Routine/Complete Inspection No Violations Noted
2487433 Primary Facility 2016-05-23 Routine/Complete Inspection No Violations Noted
2491953 Primary Facility 2016-06-02 Routine/Complete Inspection No Violations Noted I conducted an inspection of the site accompanied by Scott Kuchta, DEP O&G WQS. Flowback operations were in progress as we arrived at 12:15 PM. Oil States Energy Services is the Chief subcontractor conducting the flowback. Shortly after our arrival, we met with Mason Hope, well tester, of Oil States. Mr. Hope stated the following information. "Flowback of the Clark unit 1H well started on 5/30/16. The well is making water and gas, with the gas being sent directly to sales. Thus far 3,000 barrels of fluid have been recovered at a rate of 40 barrels/hour. The fluid is sent to frac tanks on-site in a tank battery. Water from the sand trap is sent to the gas buster tank. A line heater and separate is used in the flowback process. The frac tanks were -site before the flowback started. The 3H well is in production. The 2H well has not been stimulated and is shut in."

I recorded 3.7 milliSiemens/cm³ conductivity in water in the frac tank battery containment in the Northeast section of the pad. There were

2500462 Primary Facility 2016-06-28 Routine/Complete Inspection No Violations Noted
2507691 Primary Facility 2016-08-02 Follow-up Inspection No Violations Noted
2508894 Primary Facility 2016-08-03 Incident- Response to Accident or Event No Violations Noted

For data sources see[6]

References