X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-21617"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-115-21617
 
| Well ID: 37-115-21617
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.653369, -75.867589 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.653369, -75.867589 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: LOPATOFSKY J 6
 
| Farm/Lease Name: LOPATOFSKY J 6
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 12/19/2013
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 12/18/2013
+
| Permit Date: 2013-12-18
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.653369
 
| Latitude: 41.653369
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Production Data ==
+
== Well History ==
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Operator Name
 
!scope="col" | Gas Quantity (mcf)
 
!scope="col" | Gas Production Days
 
!scope="col" | Oil Quantity (bbl)
 
!scope="col" | Oil Production Days
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
|-
 
| 2013
 
| [[CABOT OIL & GAS CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2014
 
| [[CABOT OIL & GAS CORP]]
 
| style="text-align: right;" | 4,320,330.17
 
| style="text-align: right;" | 162
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2015
 
| [[CABOT OIL & GAS CORP]]
 
| style="text-align: right;" | 4,681,285.95
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2016
 
| [[CABOT OIL & GAS CORP]]
 
| style="text-align: right;" | 2,634,535.34
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2017
 
| [[CABOT OIL & GAS CORP]]
 
| style="text-align: right;" | 1,719,520.52
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2018
 
| [[CABOT OIL & GAS CORP]]
 
| style="text-align: right;" | 1,099,499.00
 
| style="text-align: right;" | 348
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2019
 
| [[CABOT OIL & GAS CORP]]
 
| style="text-align: right;" | 272,486.00
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Production Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Period
+
!scope="col" | Date
!scope="col" | Waste Type
+
!scope="col" | Event
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
|-
 
| 2014-1
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 1,558.02 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2014-1
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 22.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC018
 
|-
 
| 2014-1
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 730.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE001
 
|-
 
| 2014-1
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 350.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE002
 
|-
 
| 2014-2
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 6,302.03 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE001
 
|-
 
| 2014-2
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 13,084.57 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE002
 
|-
 
| 2014-2
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 3,858.38 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE002
 
|-
 
| 2015-1
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 965.45 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE002
 
|-
 
| 2015-2
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 8.93 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE001
 
|-
 
| 2015-2
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 755.56 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE002
 
|-
 
| 2016-1
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 638.08 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE002
 
|-
 
| 2016-2
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 484.34 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2017-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 72.85 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2017-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 84.83 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2017-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 81.65 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2017-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 97.75 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2017-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 74.73 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 85.71 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2017-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 51.83 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2017-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 72.26 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2017-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 79.63 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2017-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 46.85 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 81.41 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 29.77 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2018-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 43.74 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2018-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 21.65 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 51.46 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 56.77 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 51.30 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2018-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 24.65 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2018-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 24.65 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.18 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.18 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 22.99 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 61.83 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-08
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 0.51 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 34.94 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.75 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
 
|-
 
|-
| 2018-11
+
| 2013-12-18
| Produced Fluid (in Barrels) RWC 802
+
| New Permit Application
| style="text-align: right;" | 38.06 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
 
|-
 
|-
| 2018-12
+
| 2013-12-19
| Produced Fluid (in Barrels) RWC 802
+
| Performed Spud Operation
| style="text-align: right;" | 61.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
 
|-
 
|-
| 2019-01
+
| 2014-03-04
| Produced Fluid (in Barrels) RWC 802
+
| Drilling Completion
| style="text-align: right;" | 48.84 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
 
|-
 
|-
| 2019-02
+
| 2014-05-19
| Produced Fluid (in Barrels) RWC 802
+
| Perforation
| style="text-align: right;" | 61.16 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
 
|-
 
|-
| 2019-03
+
| 2014-06-10
| Produced Fluid (in Barrels) RWC 802
+
| Performed Stimulation 
| style="text-align: right;" | 39.62 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
 
|-
 
|-
|}
+
| 2015-01-12
For data sources see<ref>{{cite web
+
| DEVIATED
| title =Oil and Gas Waste Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
|-
 
| 2240740
 
| Primary Facility
 
| 01/30/2014
 
| Routine/Complete Inspection
 
| No Violations Noted
 
|
 
|-
 
| 2282185
 
| Primary Facility
 
| 06/23/2014
 
| Incident- Response to Accident or Event
 
| No Violations Noted
 
| Arrived at the site at 13:05 in response to a (7) gallon spill of a hydrochloric acid.  Cabot contacted the Department at 5:30 PM on 6-18-14 to report they lost (7) gallons of hydrochloric acid on the Pad and it has been neutralized and cleaned up.  Hydraulic fracturing operations were in progress during the inspection.  Halliburton is the subcontractor at the location conducting the operations.  A Halliburton truck containing hydrochloric acid, which is used during well stimulation procedures, lost acid out of a hatch on top of the truck while en route to move the truck from near the access road of the Pad to the truck storage area.  Apparently, as the truck stopped, acid sloshed back and forth in the truck, eventually escaping either an open, loose or not completely closed hatch on the top of the truck.  The acid flowed down the side of the truck to the ground the surface of the Well Pad.
 
|-
 
| 2530969
 
| Primary Facility
 
| 2016-10-20
 
| Site Restoration
 
| No Violations Noted
 
| Inspection of the Lopatofski J P1 in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit. EPS, Jon Sassi, was also present on this inspection.
 
 
 
The site has been stabilized and vegetation was found to be greater than 70% uniform perennial growth. Temporary E&S BMPs have been removed from the site.  No E&S problems were observed at the time of the inspection.  Post Construction Stormwater Management BMPs appear to be installed properly according to the site restoration plans.  The well pad is less than or equal to the size indicated on the site restoration plans.
 
 
 
Based on the site inspection, I recommend this notice of termination be APPROVED.
 
 
 
Jon and I also conducted a general inspection of the pad. Signs and labeling appeared to be correct. The mailbox contained the required items. There were no apparent issues with containment. Conductivity readings of water on the pad were of no concern.
 
|-
 
| 2585602
 
| Primary Facility
 
| 2017-04-04
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| The Department was on site to conduct a Routine Complete Inspection of the well site.  The E&S Inspection Log showed that Paul Hoven conducted the final E&S Inspection on 2/14/17, it was a post rain event inspection.  The site appears to be stable.  Being that the ESCGP for this site has been terminated, please remove the E&S Controls.
 
 
|-
 
|-
 
|}
 
|}
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Violation ID
 
!scope="col" | Violation Date
 
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
|-
 
|}-->
 
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Penalty ID
 
!scope="col" | Penalty Code
 
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
|-
 
|}-->
 
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title =Oil and Gas Compliance Report
+
  | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
|publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2020-02-27
| date = 2019-05-20
 
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 488: Line 93:
 
|-
 
|-
 
| 1
 
| 1
| 06/09/2014
+
| 2014-06-09
| 06/30/2014
+
| 2014-06-30
| style="text-align: right;" | 7486
+
| style="text-align: right;" | 7,486
| style="text-align: right;" | 10,988,300.0
+
| style="text-align: right;" | 10,988,300
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 620: Line 225:
 
| style="text-align: right;" | 5672
 
| style="text-align: right;" | 5672
 
|-
 
|-
| Reaction product of acetophenone, formaldehyde, thiourea and oleic acid in dimethyl formamide
+
| Reaction product of acetophenone,<br/> formaldehyde, thiourea<br/> and oleic acid in dimethyl formamide
 
| 68527-49-1
 
| 68527-49-1
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 694: Line 299:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2014-06-10
 +
| style="text-align: right;" |
 +
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2013
 +
| [[CABOT OIL & GAS CORP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CABOT OIL & GAS CORP]]
 +
| style="text-align: right;" | 4,320,330.17
 +
| style="text-align: right;" | 162
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CABOT OIL & GAS CORP]]
 +
| style="text-align: right;" | 4,681,285.95
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[CABOT OIL & GAS CORP]]
 +
| style="text-align: right;" | 2,634,535.34
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[CABOT OIL & GAS CORP]]
 +
| style="text-align: right;" | 1,719,520.52
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[CABOT OIL & GAS CORP]]
 +
| style="text-align: right;" | 1,099,499.00
 +
| style="text-align: right;" | 348
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| style="text-align: right;" | 1,028,875.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2014
 +
| [[CABOT OIL & GAS CORP]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 7,032.03 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE001
 +
|-
 +
| 2014
 +
| [[CABOT OIL & GAS CORP]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 13,434.57 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE002
 +
|-
 +
| 2014
 +
| [[CABOT OIL & GAS CORP]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 22.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC018
 +
|-
 +
| 2014
 +
| [[CABOT OIL & GAS CORP]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,558.02 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2014
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,858.38 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE002
 +
|-
 +
| 2015
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,721.01 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE002
 +
|-
 +
| 2015
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8.93 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE001
 +
|-
 +
| 2016
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 638.08 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE002
 +
|-
 +
| 2016
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 484.34 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2017
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 549.35 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2017
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 309.92 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018
 +
| [[CABOT OIL & GAS CORP]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 0.51 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2018
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 201.64 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 362.84 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 556.60 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2240740
 +
| Primary Facility
 +
| 2014-01-30
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2282185
 +
| Primary Facility
 +
| 2014-06-23
 +
| Incident- Response to Accident or Event
 +
| No Violations Noted
 +
| Arrived at the site at 13:05 in response to a (7) gallon spill of a hydrochloric acid.  Cabot contacted the Department at 5:30 PM on 6-18-14 to report they lost (7) gallons of hydrochloric acid on the Pad and it has been neutralized and cleaned up.  Hydraulic fracturing operations were in progress during the inspection.  Halliburton is the subcontractor at the location conducting the operations.  A Halliburton truck containing hydrochloric acid, which is used during well stimulation procedures, lost acid out of a hatch on top of the truck while en route to move the truck from near the access road of the Pad to the truck storage area.  Apparently, as the truck stopped, acid sloshed back and forth in the truck, eventually escaping either an open, loose or not completely closed hatch on the top of the truck.  The acid flowed down the side of the truck to the ground the surface of the Well Pad.
 +
|-
 +
| 2530969
 +
| Primary Facility
 +
| 2016-10-20
 +
| Site Restoration
 +
| No Violations Noted
 +
| Inspection of the Lopatofski J P1 in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit. EPS, Jon Sassi, was also present on this inspection.
 +
 +
The site has been stabilized and vegetation was found to be greater than 70% uniform perennial growth. Temporary E&S BMPs have been removed from the site.  No E&S problems were observed at the time of the inspection.  Post Construction Stormwater Management BMPs appear to be installed properly according to the site restoration plans.  The well pad is less than or equal to the size indicated on the site restoration plans.
 +
 +
Based on the site inspection, I recommend this notice of termination be APPROVED.
 +
 +
Jon and I also conducted a general inspection of the pad. Signs and labeling appeared to be correct. The mailbox contained the required items. There were no apparent issues with containment. Conductivity readings of water on the pad were of no concern.
 +
|-
 +
| 2585602
 +
| Primary Facility
 +
| 2017-04-04
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| The Department was on site to conduct a Routine Complete Inspection of the well site.  The E&S Inspection Log showed that Paul Hoven conducted the final E&S Inspection on 2/14/17, it was a post rain event inspection.  The site appears to be stable.  Being that the ESCGP for this site has been terminated, please remove the E&S Controls.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Latest revision as of 22:43, 15 May 2020

Well Details

Well ID: 37-115-21617
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 150750
Farm/Lease Name: LOPATOFSKY J 6
License Status:
Spud Date:
Permit Date: 2013-12-18
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.653369
Longitude: -75.867589

For data sources see[1][2][3]

Well History

Date Event
2013-12-18 New Permit Application
2013-12-19 Performed Spud Operation
2014-03-04 Drilling Completion
2014-05-19 Perforation
2014-06-10 Performed Stimulation
2015-01-12 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-09 2014-06-30 7,486 10,988,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND - PREMIUM WHITE Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 10.1432 10,475,300.0
LP-65 Halliburton Scale Inhibitor Ammonium chloride 12125-02-9 10 0.00152905 1580
BE-9 Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00427196 4412
Other Ingredient(s) Sorbitan, mono-9-octadecenoate, (Z) 1338-43-8 0 0.00109842 1135
Polyacrylamide copolymer Confidential 0 0.0329527 34032
Alcohols, C12-16, ethoxylated 68551-12-2 0 0.00549211 5672
Organic phosphonate Confidential 0 0.00917433 9475
Olefins Confidential 0 0.00002081 22
Sorbitan monooleate polyoxyethylene derivative 9005-65-6 0 0.00109842 1135
Ammonium chloride 12125-02-9 0 0.00549211 5672
Olefins Confidential 0 0.00000416 5
Water 7732-18-5 0 0.620439 640755
Sodium chloride 7647-14-5 0 0.00549211 5672
Formaldehyde 50-00-0 0 0.000152905 158
Fatty acids, tall oil Confidential 0 0.000124846 129
Fatty acid tall oil amide Confidential 0 0.00549211 5672
Reaction product of acetophenone,
formaldehyde, thiourea
and oleic acid in dimethyl formamide
68527-49-1 0 0.000124846 129
Alcohols, C14-C15, ethoxylated 68951-67-7 0 0.000124846 129
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30 0.0329527 34032
HYDROCHLORIC ACID 10-30% Halliburton Solvent Hydrochloric acid 7647-01-0 30 0.150792 155730
SSA-2 Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 0.555899 574102
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Propargyl alcohol 107-19-7 10 0.00004162 43
Methanol 67-56-1 60 0.000249692 258
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 88.63 91,532,200.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-06-10 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 4,320,330.17 162 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 4,681,285.95 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 2,634,535.34 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 1,719,520.52 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 1,099,499.00 348 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,028,875.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 7,032.03 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 13,434.57 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 22.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2014 CABOT OIL & GAS CORP Drill Cuttings 1,558.02 Tons LANDFILL 101247
2014 CABOT OIL & GAS CORP Produced Fluid 3,858.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 1,721.01 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 8.93 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 638.08 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 484.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 549.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 309.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 0.51 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 201.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 362.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 556.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2240740 Primary Facility 2014-01-30 Routine/Complete Inspection No Violations Noted
2282185 Primary Facility 2014-06-23 Incident- Response to Accident or Event No Violations Noted Arrived at the site at 13:05 in response to a (7) gallon spill of a hydrochloric acid. Cabot contacted the Department at 5:30 PM on 6-18-14 to report they lost (7) gallons of hydrochloric acid on the Pad and it has been neutralized and cleaned up. Hydraulic fracturing operations were in progress during the inspection. Halliburton is the subcontractor at the location conducting the operations. A Halliburton truck containing hydrochloric acid, which is used during well stimulation procedures, lost acid out of a hatch on top of the truck while en route to move the truck from near the access road of the Pad to the truck storage area. Apparently, as the truck stopped, acid sloshed back and forth in the truck, eventually escaping either an open, loose or not completely closed hatch on the top of the truck. The acid flowed down the side of the truck to the ground the surface of the Well Pad.
2530969 Primary Facility 2016-10-20 Site Restoration No Violations Noted Inspection of the Lopatofski J P1 in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit. EPS, Jon Sassi, was also present on this inspection.

The site has been stabilized and vegetation was found to be greater than 70% uniform perennial growth. Temporary E&S BMPs have been removed from the site. No E&S problems were observed at the time of the inspection. Post Construction Stormwater Management BMPs appear to be installed properly according to the site restoration plans. The well pad is less than or equal to the size indicated on the site restoration plans.

Based on the site inspection, I recommend this notice of termination be APPROVED.

Jon and I also conducted a general inspection of the pad. Signs and labeling appeared to be correct. The mailbox contained the required items. There were no apparent issues with containment. Conductivity readings of water on the pad were of no concern.

2585602 Primary Facility 2017-04-04 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a Routine Complete Inspection of the well site. The E&S Inspection Log showed that Paul Hoven conducted the final E&S Inspection on 2/14/17, it was a post rain event inspection. The site appears to be stable. Being that the ESCGP for this site has been terminated, please remove the E&S Controls.

For data sources see[9]

References