{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20314
 
| Well ID: 37-111-20314
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.743636, -79.357572 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.743636, -79.357572 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Somerset County, Pennsylvania|Somerset]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Addison Township, Somerset County, Pennsylvania|Addison Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC]]
+
| County: [[Somerset_County,_Pennsylvania|Somerset]]
 
|-
 
|-
| Well Pad ID: [[149069|149069]]
+
| Municipality: [[Addison Township,_Somerset_County,_Pennsylvania|Addison Township]]
 +
|-
 +
| Operator Name: [[LPR ENERGY LLC]]
 +
|-
 +
| Well Pad ID: [[149069]]
 
|-
 
|-
 
| Farm/Lease Name: PMG ALLEN UNIT 5H
 
| Farm/Lease Name: PMG ALLEN UNIT 5H
 
|-
 
|-
| First Permit Date: 2012-07-23
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2012-07-23
+
| Spud Date: 2012-11-27
 
|-
 
|-
| Spud Date: 2012-11-27
+
| Permit Date: 2012-07-23
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Well Status: ACTIVE
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: 0
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 39.743636
 
| Latitude: 39.743636
 
|-
 
|-
 
| Longitude: -79.357572
 
| Longitude: -79.357572
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-07-23
 +
| New Permit Application
 +
|-
 +
| 2012-11-27
 +
| Performed Spud Operation
 +
|-
 +
| 2013-11-25
 +
| Drilling Completion
 +
|-
 +
| 2014-08-12
 +
| Perforation
 +
|-
 +
| 2016-04-29
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2014-08-12
 +
| 2014-08-20
 +
| style="text-align: right;" | 8,590
 +
| style="text-align: right;" | 5,235,490
 +
| style="text-align: right;" |
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Job Number
!scope="col" | GAS QUANTITY
+
!scope="col" | Trade Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Supplier
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Purpose
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Ingredient Name
!scope="col" | OIL QUANTITY
+
!scope="col" | CAS Number
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="18"| 1
 +
| rowspan="1"| L058
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Iron Stabilizer
 +
| Sodium erythorbate
 +
| 6381-77-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00031317
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 15% Acid
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Perf Cleanup
 +
| Hydrocloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.00807452
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Base Fluid
 +
| rowspan="1"| Chevron
 +
| rowspan="1"| Carrier/Base Fluid
 +
| Water (Including Mix Water Supplied by Client)
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 87.9628
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="4"| A264
| style="text-align:right;" | 0.0
+
| rowspan="4"| Schlumberger
| style="text-align:right;" | 0.0
+
| rowspan="4"| Iron Control
| style="text-align:right;" | 0.0
+
| Aliphatic acids
| style="text-align:right;" | 0.0
+
| Proprietary
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00002419
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| Aliphatic alcohols, ethoxylayed #1
 +
| Proprietary
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00002419
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| Methanol
| style="text-align:right;" | 0.0
+
| 67-56-1
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 40
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00003225
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| Prop-2-yn-1-ol
 +
| 107-19-7
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00000806
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-2
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="3"| EC6116A
| style="text-align:right;" | 0.0
+
| rowspan="3"| Nalco
| style="text-align:right;" | 0.0
+
| rowspan="3"| Biocide
| style="text-align:right;" | 0.0
+
| 2,2-Dibromo-3-nitrilopropionamide
| style="text-align:right;" | 0.0
+
| 10222-01-2
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00074205
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00012367
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-1
+
| Polyethylene Glycol
| style="text-align:right;" | 0.0
+
| 25322-68-3
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 60
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00148409
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="3"| B466
 +
| rowspan="3"| Schlumberger
 +
| rowspan="3"| Friction Reducer
 +
| Distillates (petroleum), hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00075478
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-2
+
| Ammonium Acetate
| style="text-align:right;" | 0.0
+
| 631-61-8
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 6
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00015096
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| Alcohol Ethoxylates
 +
| Proprietary
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.0001258
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-02
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="1"| J134
| style="text-align:right;" | 0.0
+
| rowspan="1"| Schlumberger
| style="text-align:right;" | 0.0
+
| rowspan="1"| Gel Breaker
| style="text-align:right;" | 0.0
+
| Hemicellulase Enzyme
| style="text-align:right;" | 0.0
+
| 9012-54-8
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0015216
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| J580
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Gelling Agent
 +
| Carboydrate polymer
 +
| Proprietary
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0326808
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-01
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="1"| Proppant
| style="text-align:right;" | 0.0
+
| rowspan="1"| Schlumberger
| style="text-align:right;" | 0.0
+
| rowspan="1"| Proppant
| style="text-align:right;" | 0.0
+
| Crystalline Silica
| style="text-align:right;" | 0.0
+
| 14808-60-7
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 11.8626
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6673W
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00367429
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-03
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="1"| EC6486A
| style="text-align:right;" | 0.0
+
| rowspan="1"| Nalco
| style="text-align:right;" | 0.0
+
| rowspan="1"| Scale Inhibitor
| style="text-align:right;" | 0.0
+
| Ethylene Glycol
| style="text-align:right;" | 0.0
+
| 107-21-1
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00077181
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
| title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
| accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 196,130.00
 +
| style="text-align: right;" | 203
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 191,404.94
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 127,172.00
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 134,988.00
 +
| style="text-align: right;" | 355
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 150,742.00
 +
| style="text-align: right;" | 345
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
  | title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2013
!scope="col" | FACILITY STATE
+
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 88.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 472.78 Tons
 +
| LANDFILL
 +
| 100172
 
|-
 
|-
| 2013-1
+
| 2013
| DRILL CUTTINGS
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 492.74
+
| Drill Cuttings
| Tons
+
| style="text-align: right;" | 492.74 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100419
 
| 100419
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
 
| MCCLELLANDTOWN
 
| PA
 
 
|-
 
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1,867.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 2,727.67 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2013-1
+
| 2014
| DRILLING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 88.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 28.33 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR DRILLING OR PLUGGING
+
|-
|  
+
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 82.50 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 58.23 Tons
 +
| LANDFILL
 +
| 76-00-08
 
|-
 
|-
| 2013-1
+
| 2015
| DRILLING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 1.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 30.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
|-
+
| 2015
| 2013-2
+
| [[CHEVRON APPALACHIA LLC]]
| DRILL CUTTINGS
+
| Fracturing Fluid Waste
| style="text-align:right;" | 472.78
+
| style="text-align: right;" | 23.48 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
| 100172
+
| 100592
| ARDEN LANDFILL
 
| WASHINGTON
 
| PA
 
 
|-
 
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 4,304.17 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2014-1
+
| 2015
| PRODUCED FLUID
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 11.67
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 13.33 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
|  
+
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 10,916.84 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 0.11 Tons
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| MID0209062814
 +
|-
 +
| 2016
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 749.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2014-2
+
| 2016
| FLOWBACK FRACTURING SAND
+
| [[LPR ENERGY LLC]]
| style="text-align:right;" | 58.23
+
| Produced Fluid
| Tons
+
| style="text-align: right;" | 102.00 Bbl
| LANDFILL
+
| STORAGE PENDING DISPOSAL OR REUSE
| 76-00-08
+
|  
| WASTE MANAGEMENT, INC -  AMERICAN LANDFILL, INC
 
| WAYNESBURG
 
| OH
 
 
|-
 
|-
 +
| 2016
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 181.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2014-2
+
| 2016
| FRACING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 28.33
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 1,521.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
|  
+
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 356.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 +
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 515.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 538.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2018
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 420.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 +
| 2018
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 821.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2018
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,111.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 2014-2
+
| 2018
| FRACING FLUID WASTE
+
| [[LPR ENERGY LLC]]
| style="text-align:right;" | 2.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 156.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW001
+
| WMGR123SW005
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2019
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,253.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 2014-2
+
| 2019
| PRODUCED FLUID
+
| [[LPR ENERGY LLC]]
| style="text-align:right;" | 70.83
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 63.00 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| RESIDUAL WASTE PROCESSING FACILITY
|
+
| WMGR123SW010
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|  
 
|
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 2120888
 
| 2120888
 +
| Primary Facility
 
| 2012-11-30
 
| 2012-11-30
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Surface casing was currently at 67feet from grade.
 
| At the time of inspection, no E&S issues were present at the site. Surface casing was currently at 67feet from grade.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2121598
 
| 2121598
 +
| Primary Facility
 
| 2012-11-28
 
| 2012-11-28
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Inspection result of spud notification.Site ID sign, valid permit, E&S plan, ESCGPI, PPC Plan present at access road entrance. Security on-site. Spoke to PIC Larry Dobbs who informed DepT that drilling for 5H had begun morning of 11/27/12.At the time of this inspection, actively drilling 5H, 1H had been drilled, cellars for 2H,3H,4H constructed, 6H staked.Minor erosion on hillside observed on back left corner of pad when facing wellheads from access road. Minor sediment from this erosion observed at base of hill in rock-lined ditch.Observed tophole cuttings along soil pile. Dept spoke with company rep who stated plans were to incorporate cuttings into soil pile and disperse across pad.Opr will address erosion concerns by routinely monitoring this area in order to prevent pollution event due to accelerated erosion and sedimentation.Access road adequately rocked and no E&S issues were noted in relation to access road.Department recommends that Operator continues to monitor and maintain access road and well-site as necessary.
 
| Inspection result of spud notification.Site ID sign, valid permit, E&S plan, ESCGPI, PPC Plan present at access road entrance. Security on-site. Spoke to PIC Larry Dobbs who informed DepT that drilling for 5H had begun morning of 11/27/12.At the time of this inspection, actively drilling 5H, 1H had been drilled, cellars for 2H,3H,4H constructed, 6H staked.Minor erosion on hillside observed on back left corner of pad when facing wellheads from access road. Minor sediment from this erosion observed at base of hill in rock-lined ditch.Observed tophole cuttings along soil pile. Dept spoke with company rep who stated plans were to incorporate cuttings into soil pile and disperse across pad.Opr will address erosion concerns by routinely monitoring this area in order to prevent pollution event due to accelerated erosion and sedimentation.Access road adequately rocked and no E&S issues were noted in relation to access road.Department recommends that Operator continues to monitor and maintain access road and well-site as necessary.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2123111
 
| 2123111
 +
| Primary Facility
 
| 2012-12-12
 
| 2012-12-12
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
+
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2128472
 
| 2128472
 +
| Primary Facility
 
| 2012-12-17
 
| 2012-12-17
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
 
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2128639
 
| 2128639
 +
| Primary Facility
 
| 2013-01-08
 
| 2013-01-08
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site.  Chevron was setting the water protection pipe (16ï¾”) to a depth of 415 feet.  Site safety meeting was held by Josh Nicholis.  Chevron site supervisor was Ken Silvas.
+
| At the time of inspection, no E&S issues were present at the site.  Chevron was setting the water protection pipe (16”) to a depth of 415 feet.  Site safety meeting was held by Josh Nicholis.  Chevron site supervisor was Ken Silvas.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2130318
 
| 2130318
 +
| Primary Facility
 
| 2013-01-14
 
| 2013-01-14
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 5H well.
 
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 5H well.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2130320
 
| 2130320
 +
| Primary Facility
 
| 2013-01-14
 
| 2013-01-14
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site.  Chevron was setting the water protection pipe (16ï¾”) to a depth of 415 feet. Coal was encountered at 575 feet to 586 feet.  Coal protection pipe (11 ᄒヤ) was set at 581 feet.  Cement basket was set at 556 feet.  Pipe was cemented with 328 sacks of Class A and had a return cement of 8 bbl.  The current depth was 1,837 feet.  Chevron site supervisor was David Freed.
+
| At the time of inspection, no E&S issues were present at the site.  Chevron was setting the water protection pipe (16”) to a depth of 415 feet. Coal was encountered at 575 feet to 586 feet.  Coal protection pipe (11 ¾”) was set at 581 feet.  Cement basket was set at 556 feet.  Pipe was cemented with 328 sacks of Class A and had a return cement of 8 bbl.  The current depth was 1,837 feet.  Chevron site supervisor was David Freed.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2136134
 
| 2136134
 +
| Primary Facility
 
| 2013-02-05
 
| 2013-02-05
 +
| Incident- Response to Accident or Event
 
| In Compliance with Policy
 
| In Compliance with Policy
 
| Admin Inspt. Spoke to Chevron representative Curtis Small via phone on 2/5/13. According to Mr. Small, on 1/23/13 a jug of antifreeze was spilled in bed of truck as it was being driven down access road. It leaked through the tailgate, resulting in a one-inch, 70 foot strip of antifreeze down the AR, totaling approximately a half-gallon in volume. Impacted gravel immediately shoveled into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
 
| Admin Inspt. Spoke to Chevron representative Curtis Small via phone on 2/5/13. According to Mr. Small, on 1/23/13 a jug of antifreeze was spilled in bed of truck as it was being driven down access road. It leaked through the tailgate, resulting in a one-inch, 70 foot strip of antifreeze down the AR, totaling approximately a half-gallon in volume. Impacted gravel immediately shoveled into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2143501
 
| 2143501
 +
| Primary Facility
 
| 2013-02-11
 
| 2013-02-11
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 4H.
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 4H.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2143516
 
| 2143516
 +
| Primary Facility
 
| 2013-02-22
 
| 2013-02-22
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 6H.
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 6H.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2144639
 
| 2144639
 +
| Primary Facility
 
| 2013-02-25
 
| 2013-02-25
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 5H spudded, TD not yet reached. 1H had been drilled. 2H, 3H, 4H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121598) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted.Department recommends that Operator remove debris from rock-lined ditches.
 
| Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 5H spudded, TD not yet reached. 1H had been drilled. 2H, 3H, 4H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121598) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted.Department recommends that Operator remove debris from rock-lined ditches.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2145396
 
| 2145396
 +
| Primary Facility
 
| 2013-02-25
 
| 2013-02-25
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Admin Inspt. Spoke to Chevron representative Curtis Small via phone on 2/5/13. According to Mr. Small, on 1/23/13 a jug of antifreeze was spilled in bed of truck as it was being driven down access road. It leaked through the tailgate, resulting in a one-inch, 70 foot strip of antifreeze down the AR, totaling approximately a half-gallon in volume. Impacted gravel immediately shoveled into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
 
| Admin Inspt. Spoke to Chevron representative Curtis Small via phone on 2/5/13. According to Mr. Small, on 1/23/13 a jug of antifreeze was spilled in bed of truck as it was being driven down access road. It leaked through the tailgate, resulting in a one-inch, 70 foot strip of antifreeze down the AR, totaling approximately a half-gallon in volume. Impacted gravel immediately shoveled into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
 
UPDATE
 
Spoke to safety rep Josh, who showed WQSs pictures of the incident. Appears all impacted materials were removed and no adverse environmental impacts as a result of this event were observed.
 
 
Accompanied by WQS April Weiland.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2151596
 
| 2151596
 +
| Primary Facility
 
| 2013-03-13
 
| 2013-03-13
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 3H.
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 3H.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2173646
 
| 2173646
 +
| Primary Facility
 
| 2013-06-10
 
| 2013-06-10
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Routine inspectio no issues noted.
 
| Routine inspectio no issues noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2181332
 
| 2181332
 +
| Primary Facility
 
| 2013-05-22
 
| 2013-05-22
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Met on site with Chevron. Signed off on a minor modification to the restoration plan.
 
| Met on site with Chevron. Signed off on a minor modification to the restoration plan.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2224967
 
| 2224967
 +
| Primary Facility
 
| 2013-11-26
 
| 2013-11-26
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On 11/26/13 this Marcellus well pad  inspection was conducted. Met with the PICs Doug Davis and Jonathan Michalec  and inspected the site. The weather was cold and raining/snowing  the day of the inspection.
 
| On 11/26/13 this Marcellus well pad  inspection was conducted. Met with the PICs Doug Davis and Jonathan Michalec  and inspected the site. The weather was cold and raining/snowing  the day of the inspection.
 
There was  activity the day of the inspection. Chevron was drilling on the 5H.
 
 
 
The  well signs were properly marked.
 
 
The emergency notification procedures were discussed. The 2 PICs had a good understanding of the emergency procedures that Chevron established.
 
 
The entrance into the site was well graveled.  No mud was being drug out onto the main road.
 
 
Walked around the well pad perimeter with Mr. Davis. The rig was setting casing. The company was processing the oil based mud cuttings with corn cob. The corn cob and cuttings will then be landfilled. No Pit was on the site.
 
 
No spillage was noted on the site.
 
 
The vegetation on the site is well established. No E&S issues were noted on the well pad.
 
 
The company has one impoundment. The impoundment had greater than 2 feet of freeboard.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2228117
 
| 2228117
 +
| Primary Facility
 
| 2013-11-26
 
| 2013-11-26
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present.  Chevron completed drilling well 5H.  The well was set at the following:  KOP ï¾– 7156 ft., LP- 9561 ft., Vertical ï¾– 3056 ft. and MD ï¾– 13, 167 ft.
+
| At the time of inspection, no E&S issues were present.  Chevron completed drilling well 5H.  The well was set at the following:  KOP 7156 ft., LP- 9561 ft., Vertical 3056 ft. and MD 13, 167 ft.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2228280
 
| 2228280
 +
| Primary Facility
 
| 2013-10-31
 
| 2013-10-31
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H.
 
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2228732
 
| 2228732
 +
| Primary Facility
 
| 2013-10-09
 
| 2013-10-09
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
 
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2229863
 
| 2229863
 +
| Primary Facility
 
| 2013-09-26
 
| 2013-09-26
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site.  Chevron was setting up  drilling for well 4H.
+
| At the time of inspection, no E&S issues were present at the site.  Chevron was setting up  drilling for well 4H.
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2235874
 
| 2235874
 +
| Primary Facility
 
| 2014-01-13
 
| 2014-01-13
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
 
| On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
 
The entrance road to the well pad was well graveled. No mud was being drug out onto the main road.
 
 
Checked in with the guard.
 
 
Walked over the impoundment and met with Harvey Horner with Nuverra. Nuverra was working on the small truck turn around pad that is adjacent and on the Northern side of the impoundment. They were adding stone to the pad.
 
 
Walked over to the well pad. The well pad was inspected.
 
 
The # 1 well was not marked. Please mark this well and notify this inspector when the well is marked.
 
 
Large plastic pipe was being unloaded onto the well pad.
 
 
No signs of spills were noticed on the well pad.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2244510
 
| 2244510
 +
| Primary Facility
 
| 2014-02-10
 
| 2014-02-10
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding  an additional ramp tp allow the pipeline company access to their well controls. The access road will only  be temporary.
 
| Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding  an additional ramp tp allow the pipeline company access to their well controls. The access road will only  be temporary.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2250989
 
| 2250989
 +
| Primary Facility
 
| 2014-03-05
 
| 2014-03-05
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
 
| On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
 
The sign was correctly marked.
 
 
No mud was being drug out to the main road.
 
 
Checked in with the guard and donned the required PPE.
 
 
They were preparing the well pad for the frack equipment that will be coming on site. A road leading up to the Caymen pipeline was being reworked. This will allow the Caymen workers will have access to the pipeline.
 
 
A minor gas leak was observed at the Caymen pipeline. Chevron called Caymen and a Caymen worker responded to the site and repaired the leak.
 
 
The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2252449
 
| 2252449
 +
| Primary Facility
 
| 2014-03-10
 
| 2014-03-10
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On 3/10/14 met with Alex Grant with Chevron and inspected the site.
 
| On 3/10/14 met with Alex Grant with Chevron and inspected the site.
 
The sign was correctly marked.
 
 
No mud was being drug out to the main road.
 
 
Checked in with the guard and donned the required PPE.
 
 
They were preparing the well pad for the frack equipment that will be coming on site.
 
 
A road leading up to the Caymen pipeline was  reworked. This will allow the Caymen workers will have access to the pipeline.
 
 
The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2311286
 
| 2311286
 +
| Primary Facility
 
| 2014-10-08
 
| 2014-10-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Work was underway to equip a well for production.  A coil tubing rig was located onsite.  Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
 +
|-
 +
| 2408944
 +
| Primary Facility
 +
| 2015-09-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection, well tag present and legible.
 +
|-
 +
| 2486262
 +
| Primary Facility
 +
| 2016-05-19
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| no issues. system running
 +
|-
 +
| 2532220
 +
| Primary Facility
 +
| 2016-10-05
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
+
| system running
|  
+
|-
|  
+
| 2549715
|  
+
| Primary Facility
 +
| 2016-12-29
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Multi-well Marcellus pad.
 +
Site ID sign, E&S plan, PPC plan and ERP on site.
 +
At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked.
 +
Well tag present and legible. Brine tank located in secondary containment appears structurally sound.
 +
Department observed discharge from tank secondary containment onto well pad. See Inspection Record #2549692.
 +
|-
 +
| 2594471
 +
| Primary Facility
 +
| 2017-04-25
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running.  no issues
 +
|-
 +
| 2594594
 +
| Primary Facility
 +
| 2017-05-16
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running.  no issues
 +
|-
 +
| 2626057
 +
| Primary Facility
 +
| 2017-08-16
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running.  no issues
 +
|-
 +
| 2656145
 +
| Primary Facility
 +
| 2017-11-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| System running no,issues
 +
|-
 +
| 2672038
 +
| Primary Facility
 +
| 2017-12-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| System running. No,issues.
 +
|-
 +
| 2672071
 +
| Primary Facility
 +
| 2017-12-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection.
 +
|-
 +
| 2685388
 +
| Primary Facility
 +
| 2018-01-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| System producing.  Emergency contact present.  Well tag present.
 +
|-
 +
| 2700772
 +
| Primary Facility
 +
| 2018-03-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well tag present and emergency contact information present.  No issues at the site
 +
|-
 +
| 2700822
 +
| Primary Facility
 +
| 2018-03-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection.
 +
|-
 +
| 2719557
 +
| Primary Facility
 +
| 2018-04-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment.
 +
|-
 +
| 2766920
 +
| Primary Facility
 +
| 2018-08-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 18:50, 15 May 2020

Well Details

Well ID: 37-111-20314
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Addison Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 149069
Farm/Lease Name: PMG ALLEN UNIT 5H
License Status:
Spud Date: 2012-11-27
Permit Date: 2012-07-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.743636
Longitude: -79.357572

For data sources see[1][2][3]

Well History

Date Event
2012-07-23 New Permit Application
2012-11-27 Performed Spud Operation
2013-11-25 Drilling Completion
2014-08-12 Perforation
2016-04-29 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-12 2014-08-20 8,590 5,235,490

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00031317 0
15% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 15 0.00807452 0
Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 87.9628 0
A264 Schlumberger Iron Control Aliphatic acids Proprietary 30 0.00002419 0
Aliphatic alcohols, ethoxylayed #1 Proprietary 30 0.00002419 0
Methanol 67-56-1 40 0.00003225 0
Prop-2-yn-1-ol 107-19-7 10 0.00000806 0
EC6116A Nalco Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00074205 0
Dibromoacetonitrile 3252-43-5 5 0.00012367 0
Polyethylene Glycol 25322-68-3 60 0.00148409 0
B466 Schlumberger Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 30 0.00075478 0
Ammonium Acetate 631-61-8 6 0.00015096 0
Alcohol Ethoxylates Proprietary 5 0.0001258 0
J134 Schlumberger Gel Breaker Hemicellulase Enzyme 9012-54-8 100 0.0015216 0
J580 Schlumberger Gelling Agent Carboydrate polymer Proprietary 100 0.0326808 0
Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 11.8626 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00367429 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00077181 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 196,130.00 203 0.00 0 0.00 0
2016 LPR ENERGY LLC 191,404.94 365 0.00 0 0.00 0
2017 LPR ENERGY LLC 127,172.00 360 0.00 0 0.00 0
2018 LPR ENERGY LLC 134,988.00 355 0.00 0 0.00 0
2019 LPR ENERGY LLC 150,742.00 345 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 88.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drill Cuttings 472.78 Tons LANDFILL 100172
2013 CHEVRON APPALACHIA LLC Drill Cuttings 492.74 Tons LANDFILL 100419
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,867.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 2,727.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 28.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 82.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 58.23 Tons LANDFILL 76-00-08
2015 CHEVRON APPALACHIA LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 23.48 Tons LANDFILL 100592
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 4,304.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 13.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 10,916.84 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 0.11 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2016 LPR ENERGY LLC Produced Fluid 749.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC Produced Fluid 102.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 LPR ENERGY LLC Produced Fluid 181.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 CHEVRON APPALACHIA LLC Produced Fluid 1,521.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 LPR ENERGY LLC Produced Fluid 356.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC Produced Fluid 515.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 LPR ENERGY LLC Produced Fluid 538.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 LPR ENERGY LLC Produced Fluid 420.00 Bbl REUSE (AT WELL PAD)
2018 LPR ENERGY LLC Produced Fluid 821.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 LPR ENERGY LLC Produced Fluid 1,111.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018 LPR ENERGY LLC Produced Fluid 156.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 LPR ENERGY LLC Produced Fluid 1,253.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019 LPR ENERGY LLC Produced Fluid 63.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2120888 Primary Facility 2012-11-30 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Surface casing was currently at 67feet from grade.
2121598 Primary Facility 2012-11-28 Routine/Complete Inspection No Violations Noted Inspection result of spud notification.Site ID sign, valid permit, E&S plan, ESCGPI, PPC Plan present at access road entrance. Security on-site. Spoke to PIC Larry Dobbs who informed DepT that drilling for 5H had begun morning of 11/27/12.At the time of this inspection, actively drilling 5H, 1H had been drilled, cellars for 2H,3H,4H constructed, 6H staked.Minor erosion on hillside observed on back left corner of pad when facing wellheads from access road. Minor sediment from this erosion observed at base of hill in rock-lined ditch.Observed tophole cuttings along soil pile. Dept spoke with company rep who stated plans were to incorporate cuttings into soil pile and disperse across pad.Opr will address erosion concerns by routinely monitoring this area in order to prevent pollution event due to accelerated erosion and sedimentation.Access road adequately rocked and no E&S issues were noted in relation to access road.Department recommends that Operator continues to monitor and maintain access road and well-site as necessary.
2123111 Primary Facility 2012-12-12 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
2128472 Primary Facility 2012-12-17 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
2128639 Primary Facility 2013-01-08 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was setting the water protection pipe (16”) to a depth of 415 feet. Site safety meeting was held by Josh Nicholis. Chevron site supervisor was Ken Silvas.
2130318 Primary Facility 2013-01-14 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 5H well.
2130320 Primary Facility 2013-01-14 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was setting the water protection pipe (16”) to a depth of 415 feet. Coal was encountered at 575 feet to 586 feet. Coal protection pipe (11 ¾”) was set at 581 feet. Cement basket was set at 556 feet. Pipe was cemented with 328 sacks of Class A and had a return cement of 8 bbl. The current depth was 1,837 feet. Chevron site supervisor was David Freed.
2136134 Primary Facility 2013-02-05 Incident- Response to Accident or Event In Compliance with Policy Admin Inspt. Spoke to Chevron representative Curtis Small via phone on 2/5/13. According to Mr. Small, on 1/23/13 a jug of antifreeze was spilled in bed of truck as it was being driven down access road. It leaked through the tailgate, resulting in a one-inch, 70 foot strip of antifreeze down the AR, totaling approximately a half-gallon in volume. Impacted gravel immediately shoveled into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
2143501 Primary Facility 2013-02-11 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 4H.
2143516 Primary Facility 2013-02-22 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
2144639 Primary Facility 2013-02-25 Routine/Complete Inspection No Violations Noted Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 5H spudded, TD not yet reached. 1H had been drilled. 2H, 3H, 4H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121598) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted.Department recommends that Operator remove debris from rock-lined ditches.
2145396 Primary Facility 2013-02-25 Follow-up Inspection No Violations Noted Admin Inspt. Spoke to Chevron representative Curtis Small via phone on 2/5/13. According to Mr. Small, on 1/23/13 a jug of antifreeze was spilled in bed of truck as it was being driven down access road. It leaked through the tailgate, resulting in a one-inch, 70 foot strip of antifreeze down the AR, totaling approximately a half-gallon in volume. Impacted gravel immediately shoveled into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
2151596 Primary Facility 2013-03-13 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H.
2173646 Primary Facility 2013-06-10 Routine/Complete Inspection No Violations Noted Routine inspectio no issues noted.
2181332 Primary Facility 2013-05-22 Routine/Complete Inspection No Violations Noted Met on site with Chevron. Signed off on a minor modification to the restoration plan.
2224967 Primary Facility 2013-11-26 Routine/Complete Inspection No Violations Noted On 11/26/13 this Marcellus well pad inspection was conducted. Met with the PICs Doug Davis and Jonathan Michalec and inspected the site. The weather was cold and raining/snowing the day of the inspection.
2228117 Primary Facility 2013-11-26 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present. Chevron completed drilling well 5H. The well was set at the following: KOP – 7156 ft., LP- 9561 ft., Vertical – 3056 ft. and MD – 13, 167 ft.
2228280 Primary Facility 2013-10-31 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H.
2228732 Primary Facility 2013-10-09 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
2229863 Primary Facility 2013-09-26 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was setting up drilling for well 4H.
2235874 Primary Facility 2014-01-13 Routine/Complete Inspection No Violations Noted On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
2244510 Primary Facility 2014-02-10 Routine/Complete Inspection No Violations Noted Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding an additional ramp tp allow the pipeline company access to their well controls. The access road will only be temporary.
2250989 Primary Facility 2014-03-05 Routine/Complete Inspection No Violations Noted On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
2252449 Primary Facility 2014-03-10 Routine/Complete Inspection No Violations Noted On 3/10/14 met with Alex Grant with Chevron and inspected the site.
2311286 Primary Facility 2014-10-08 Routine/Complete Inspection No Violations Noted Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
2408944 Primary Facility 2015-09-18 Routine/Complete Inspection No Violations Noted At time of inspection, well tag present and legible.
2486262 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted no issues. system running
2532220 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted system running
2549715 Primary Facility 2016-12-29 Routine/Complete Inspection No Violations Noted Multi-well Marcellus pad.

Site ID sign, E&S plan, PPC plan and ERP on site. At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. Department observed discharge from tank secondary containment onto well pad. See Inspection Record #2549692.

2594471 Primary Facility 2017-04-25 Routine/Complete Inspection No Violations Noted system running. no issues
2594594 Primary Facility 2017-05-16 Routine/Complete Inspection No Violations Noted system running. no issues
2626057 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted system running. no issues
2656145 Primary Facility 2017-11-02 Routine/Complete Inspection No Violations Noted System running no,issues
2672038 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted System running. No,issues.
2672071 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection.
2685388 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted System producing. Emergency contact present. Well tag present.
2700772 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Well tag present and emergency contact information present. No issues at the site
2700822 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection.
2719557 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment.
2766920 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed.

For data sources see[8]