X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20308"

m
m
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 42-111-20308
+
| Well ID: 37-111-20308
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 39.8566, -79.171202 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.8566, -79.171203 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Somerset County, Pennsylvania|Somerset]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Black Township, Somerset County, Pennsylvania|Black Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| County: [[Somerset_County,_Pennsylvania|Somerset]]
 +
|-
 +
| Municipality: [[Black Township,_Somerset_County,_Pennsylvania|Black Township]]
 +
|-
 +
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 +
|-
 +
| Well Pad ID: [[147168]]
 
|-
 
|-
 
| Farm/Lease Name: TREES UNIT 1H
 
| Farm/Lease Name: TREES UNIT 1H
 
|-
 
|-
| First Permit Date: 2011-05-27
+
| License Status: Plugged and Abandoned
 
|-
 
|-
| Last Permit Date: 2011-05-27
+
| Spud Date: 2011-09-22
 
|-
 
|-
| Spud Date: 2011-09-22
+
| Permit Date: 2011-05-27
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 39.8566
 
| Latitude: 39.8566
 
|-
 
|-
| Longitude: -79.171202
+
| Longitude: -79.171203
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-05-27
 +
| New Permit Application
 +
|-
 +
| 2011-09-22
 +
| Performed Spud Operation
 +
|-
 +
| 2011-10-23
 +
| Drilling Completion
 +
|-
 +
| 2012-06-13
 +
| NEWLY DRILLED
 +
|-
 +
| 2013-05-29
 +
| Begin Plugging
 +
|-
 +
| 2013-06-19
 +
| Finished Plugging
 +
|-
 +
| 2018-07-10
 +
| Fully Plugged
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2011
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,233.84 Tons
 +
| LANDFILL
 +
| 100081
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 408.73 Tons
 +
| LANDFILL
 +
| 100419
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2004082
 
| 2004082
 +
| Primary Facility
 
| 2011-09-08
 
| 2011-09-08
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| During this inspection, well sign, ES plan, and valid ESCGP-1 present. Site gated and locked. Well staked not yet drilled. BMPs installed and functioning as outlined in ES plan. Previously disturbed areas appeared to be seeded and mulched with observed growth, although it is recommended that operator reseed or blanket soil pile in order to prevent a possible erosion event as minimal growth observed at this time. Red staining of soil observed at toe of pad slope¿operator investigated and believes decomposition from fill material is causing the red staining.  Accompanied by WQS Marc Maestra during inspection.
 
| During this inspection, well sign, ES plan, and valid ESCGP-1 present. Site gated and locked. Well staked not yet drilled. BMPs installed and functioning as outlined in ES plan. Previously disturbed areas appeared to be seeded and mulched with observed growth, although it is recommended that operator reseed or blanket soil pile in order to prevent a possible erosion event as minimal growth observed at this time. Red staining of soil observed at toe of pad slope¿operator investigated and believes decomposition from fill material is causing the red staining.  Accompanied by WQS Marc Maestra during inspection.
|
 
|-
 
 
|-
 
|-
 
| 2006180
 
| 2006180
 +
| Primary Facility
 
| 2011-09-28
 
| 2011-09-28
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S or IW discharge issues at the site. Chevron contracted Paterson rig 255.  Dewayne Pauley is the representative for Chevron.  Conductor pipe was set at 60 ft. (20¿¿pipe) and was grouted in place.  DEP performed a site walk and did not find any issues.  Chevron/Patterson was in the process of procuring the site for drilling.  According to Dewayne, drilling of the vertical section should begin during the week of October 2nd.
 
| At the time of inspection, no E&S or IW discharge issues at the site. Chevron contracted Paterson rig 255.  Dewayne Pauley is the representative for Chevron.  Conductor pipe was set at 60 ft. (20¿¿pipe) and was grouted in place.  DEP performed a site walk and did not find any issues.  Chevron/Patterson was in the process of procuring the site for drilling.  According to Dewayne, drilling of the vertical section should begin during the week of October 2nd.
|
 
|-
 
 
|-
 
|-
 
| 2009464
 
| 2009464
 +
| Primary Facility
 
| 2011-10-05
 
| 2011-10-05
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Chevron contracted Patterson 255. Don Henson contact person for Chief.  Rig was still being procured for drilling.
 
| Chevron contracted Patterson 255. Don Henson contact person for Chief.  Rig was still being procured for drilling.
|
 
|-
 
 
|-
 
|-
 
| 2009613
 
| 2009613
 +
| Primary Facility
 
| 2011-10-04
 
| 2011-10-04
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| :  Site visit was part of routine inspection due to spud notification.  Inspection was conducted with April Weiland.
 
| :  Site visit was part of routine inspection due to spud notification.  Inspection was conducted with April Weiland.
Met with company man Denny Wise.
 
Work was progressing on rigging up.  Drilling was to start tomorrow.
 
Pad E&S was installed and working properly (rock-lined ditches, sed trap etc.)
 
Cut slopes were lined with vegetative matting.  No matting was installed on soil pile.
 
Liner was placed underneath work area.  No diking was installed around rig.
 
No violations noted at this time.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2012156
 
| 2012156
 +
| Primary Facility
 
| 2011-10-19
 
| 2011-10-19
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S or IW discharge issues at the site. Chevron had contracted Paterson rig 255.  Dewayne Pauley was present representing Chief under Chevron.  Conductor pipe (20¿) was set at 62 feet and was grouted in place.  The Surface pipe (13 3/8¿) was set at 417 feet and was cemented with 340 sacks of Type I with 34 bbls of return.  The Intermediate pipe (9 5/8¿) was set at 1820 feet and was cemented with 600 sks of Type I with 20 bbls of return.  Current depth was at 7620 feet.  This drilling phase is projected to drill a vertical pilot hole to a depth of 8560 feet.  Chief is anticipated completion time of 10/22/11 for this phase.
 
| At the time of inspection, no E&S or IW discharge issues at the site. Chevron had contracted Paterson rig 255.  Dewayne Pauley was present representing Chief under Chevron.  Conductor pipe (20¿) was set at 62 feet and was grouted in place.  The Surface pipe (13 3/8¿) was set at 417 feet and was cemented with 340 sacks of Type I with 34 bbls of return.  The Intermediate pipe (9 5/8¿) was set at 1820 feet and was cemented with 600 sks of Type I with 20 bbls of return.  Current depth was at 7620 feet.  This drilling phase is projected to drill a vertical pilot hole to a depth of 8560 feet.  Chief is anticipated completion time of 10/22/11 for this phase.
|
 
|-
 
 
|-
 
|-
 
| 2017495
 
| 2017495
 +
| Primary Facility
 
| 2011-11-03
 
| 2011-11-03
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| well sign, ES plan, ESCGP-1 present, but no PPC plan.  Chevron Regulatory Compliance Specialist Alexander onsite.  Access road stable and adequately maintained, wash rack located at site entrance.  Pad adequately rocked. Well drilled, operator currently rigging down. Secondary containment located on pad beneath rig, as well as franc tanks. Bmp's installed according to plan and appear to be functioning, although department noted a piece of felt, plastic, geotextile, and various pieces of scrap wood place in ditches surrounding well site. Two unlabeled black barrels located off of secondary containment on wood pallets near soil pile. Department requested that operator place barrels on secondary containment as well as remove debris from ditches. Site has been seeded/mulched with minimal growth, recommend operator reseed and mulch soil pile to ensure adequate temporary stabilization is sustained.  No accelerated erosion or sedimentation issues noted. Operator immediately responding to potential pollution concerns noted above.
 
| well sign, ES plan, ESCGP-1 present, but no PPC plan.  Chevron Regulatory Compliance Specialist Alexander onsite.  Access road stable and adequately maintained, wash rack located at site entrance.  Pad adequately rocked. Well drilled, operator currently rigging down. Secondary containment located on pad beneath rig, as well as franc tanks. Bmp's installed according to plan and appear to be functioning, although department noted a piece of felt, plastic, geotextile, and various pieces of scrap wood place in ditches surrounding well site. Two unlabeled black barrels located off of secondary containment on wood pallets near soil pile. Department requested that operator place barrels on secondary containment as well as remove debris from ditches. Site has been seeded/mulched with minimal growth, recommend operator reseed and mulch soil pile to ensure adequate temporary stabilization is sustained.  No accelerated erosion or sedimentation issues noted. Operator immediately responding to potential pollution concerns noted above.
|
 
|-
 
 
|-
 
|-
 
| 2034155
 
| 2034155
 +
| Primary Facility
 
| 2012-01-10
 
| 2012-01-10
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, well site ID sign, ES plan, ESCGP-1, PPC plan present.  Well Spudded 9/21/11.  Well site gated and locked. Access road stable. Pad adequately rocked. Well drilled not yet equipped for prodcution. Site appears temporarily stabilized. Temporary bmp's installed and functioning according to plan. No accelerated erosion or sedimenation issues noted. Since last inspection, soil pile has been reseeded. No violations noted during this inspection. Accompanied by WQS Marc Maestra.
 
| At the time of inspection, well site ID sign, ES plan, ESCGP-1, PPC plan present.  Well Spudded 9/21/11.  Well site gated and locked. Access road stable. Pad adequately rocked. Well drilled not yet equipped for prodcution. Site appears temporarily stabilized. Temporary bmp's installed and functioning according to plan. No accelerated erosion or sedimenation issues noted. Since last inspection, soil pile has been reseeded. No violations noted during this inspection. Accompanied by WQS Marc Maestra.
|
 
|-
 
 
|-
 
|-
 
| 2074779
 
| 2074779
 +
| Primary Facility
 
| 2012-06-11
 
| 2012-06-11
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Inspected site with Curtis Small. No issues noted on this site.
 
| Inspected site with Curtis Small. No issues noted on this site.
|  
+
|-
 +
| 2496117
 +
| Primary Facility
 +
| 2016-06-13
 +
| Routine/Complete Inspection
 +
| In Compliance with Policy
 +
| At time of inspection well appears to be plugged. Access road gated. Security fence surrounding site. No erected monument  located. Site vegetated and appears permanently stabilized.
 +
Department unable to locate plugging certificate.  Department recommends Operator re-submit plugging certificate.
 +
Operator appears to be In Compliance with Policy at this time.
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | GAS QUANTITY
+
!scope="col" | Violation ID
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Violation Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Date Resolved
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Violation Code
!scope="col" | OIL QUANTITY
+
!scope="col" | Violation Type
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Violation Comments
|-
 
| 2012-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
| 2011-1
+
|}-->
| style="text-align:right;" | 0.0
+
<!--==== Penalties Applied ====
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|}
 
== Waste Data ==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Violation ID
!scope="col" | TYPE
+
!scope="col" | Penalty ID
!scope="col" | QUANTITY
+
!scope="col" | Penalty Code
!scope="col" | UNITS
+
!scope="col" | Penalty Status
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Penalty Date
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Enforcement Date
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Penalty Amount
!scope="col" | FACILITY CITY
+
!scope="col" | Amount Collected
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-2
+
|}-->
| DRILL CUTTINGS
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 1233.84
+
| title =Oil and Gas Compliance Report
| Tons
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| LANDFILL
+
| date = 2019-05-20
| 100081
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| WASTE MANAGEMENT, INC - SOUTHERN ALLEGHENIES
+
| accessdate = 2019-05-21 }}</ref>
| DAVIDSVILLE
 
| PA
 
|-
 
|}
 
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 18:49, 15 May 2020

Well Details

Well ID: 37-111-20308
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Black Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147168
Farm/Lease Name: TREES UNIT 1H
License Status: Plugged and Abandoned
Spud Date: 2011-09-22
Permit Date: 2011-05-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.8566
Longitude: -79.171203

For data sources see[1][2][3]

Well History

Date Event
2011-05-27 New Permit Application
2011-09-22 Performed Spud Operation
2011-10-23 Drilling Completion
2012-06-13 NEWLY DRILLED
2013-05-29 Begin Plugging
2013-06-19 Finished Plugging
2018-07-10 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHIEF OIL & GAS LLC Drill Cuttings 1,233.84 Tons LANDFILL 100081
2013 CHEVRON APPALACHIA LLC Drill Cuttings 408.73 Tons LANDFILL 100419

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2004082 Primary Facility 2011-09-08 Routine/Complete Inspection No Violations Noted During this inspection, well sign, ES plan, and valid ESCGP-1 present. Site gated and locked. Well staked not yet drilled. BMPs installed and functioning as outlined in ES plan. Previously disturbed areas appeared to be seeded and mulched with observed growth, although it is recommended that operator reseed or blanket soil pile in order to prevent a possible erosion event as minimal growth observed at this time. Red staining of soil observed at toe of pad slope¿operator investigated and believes decomposition from fill material is causing the red staining. Accompanied by WQS Marc Maestra during inspection.
2006180 Primary Facility 2011-09-28 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chevron contracted Paterson rig 255. Dewayne Pauley is the representative for Chevron. Conductor pipe was set at 60 ft. (20¿¿pipe) and was grouted in place. DEP performed a site walk and did not find any issues. Chevron/Patterson was in the process of procuring the site for drilling. According to Dewayne, drilling of the vertical section should begin during the week of October 2nd.
2009464 Primary Facility 2011-10-05 Drilling/Alteration No Violations Noted Chevron contracted Patterson 255. Don Henson contact person for Chief. Rig was still being procured for drilling.
2009613 Primary Facility 2011-10-04 Routine/Complete Inspection No Violations Noted : Site visit was part of routine inspection due to spud notification. Inspection was conducted with April Weiland.
2012156 Primary Facility 2011-10-19 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chevron had contracted Paterson rig 255. Dewayne Pauley was present representing Chief under Chevron. Conductor pipe (20¿) was set at 62 feet and was grouted in place. The Surface pipe (13 3/8¿) was set at 417 feet and was cemented with 340 sacks of Type I with 34 bbls of return. The Intermediate pipe (9 5/8¿) was set at 1820 feet and was cemented with 600 sks of Type I with 20 bbls of return. Current depth was at 7620 feet. This drilling phase is projected to drill a vertical pilot hole to a depth of 8560 feet. Chief is anticipated completion time of 10/22/11 for this phase.
2017495 Primary Facility 2011-11-03 Routine/Complete Inspection No Violations Noted well sign, ES plan, ESCGP-1 present, but no PPC plan. Chevron Regulatory Compliance Specialist Alexander onsite. Access road stable and adequately maintained, wash rack located at site entrance. Pad adequately rocked. Well drilled, operator currently rigging down. Secondary containment located on pad beneath rig, as well as franc tanks. Bmp's installed according to plan and appear to be functioning, although department noted a piece of felt, plastic, geotextile, and various pieces of scrap wood place in ditches surrounding well site. Two unlabeled black barrels located off of secondary containment on wood pallets near soil pile. Department requested that operator place barrels on secondary containment as well as remove debris from ditches. Site has been seeded/mulched with minimal growth, recommend operator reseed and mulch soil pile to ensure adequate temporary stabilization is sustained. No accelerated erosion or sedimentation issues noted. Operator immediately responding to potential pollution concerns noted above.
2034155 Primary Facility 2012-01-10 Routine/Complete Inspection No Violations Noted At the time of inspection, well site ID sign, ES plan, ESCGP-1, PPC plan present. Well Spudded 9/21/11. Well site gated and locked. Access road stable. Pad adequately rocked. Well drilled not yet equipped for prodcution. Site appears temporarily stabilized. Temporary bmp's installed and functioning according to plan. No accelerated erosion or sedimenation issues noted. Since last inspection, soil pile has been reseeded. No violations noted during this inspection. Accompanied by WQS Marc Maestra.
2074779 Primary Facility 2012-06-11 Routine/Complete Inspection No Violations Noted Inspected site with Curtis Small. No issues noted on this site.
2496117 Primary Facility 2016-06-13 Routine/Complete Inspection In Compliance with Policy At time of inspection well appears to be plugged. Access road gated. Security fence surrounding site. No erected monument located. Site vegetated and appears permanently stabilized.

Department unable to locate plugging certificate. Department recommends Operator re-submit plugging certificate. Operator appears to be In Compliance with Policy at this time.

For data sources see[7]

References