X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20308"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20308
 
| Well ID: 37-111-20308
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.8566, -79.171203 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.8566, -79.171203 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Plugged OG Well
 
| License Status: Plugged OG Well
 
|-
 
|-
| Spud Date: 09/22/2011
+
| Spud Date: 2011-09-22
 
|-
 
|-
| Permit Date: 5/27/2011
+
| Permit Date: 2011-05-27
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 138: Line 163:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-2
+
| 2011-S02
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 1,233.84 Tons
 
| style="text-align: right;" | 1,233.84 Tons
Line 144: Line 169:
 
| 100081
 
| 100081
 
|-
 
|-
| 2013-1
+
| 2013-S01
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 67.71 Tons
 
| style="text-align: right;" | 67.71 Tons
Line 150: Line 175:
 
| 100419
 
| 100419
 
|-
 
|-
| 2013-2
+
| 2013-S02
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 341.02 Tons
 
| style="text-align: right;" | 341.02 Tons
Line 175: Line 200:
 
| 2004082
 
| 2004082
 
| Primary Facility
 
| Primary Facility
| 09/08/2011
+
| 2011-09-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 182: Line 207:
 
| 2006180
 
| 2006180
 
| Primary Facility
 
| Primary Facility
| 09/28/2011
+
| 2011-09-28
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 189: Line 214:
 
| 2009464
 
| 2009464
 
| Primary Facility
 
| Primary Facility
| 10/05/2011
+
| 2011-10-05
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 196: Line 221:
 
| 2009613
 
| 2009613
 
| Primary Facility
 
| Primary Facility
| 10/04/2011
+
| 2011-10-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 203: Line 228:
 
| 2012156
 
| 2012156
 
| Primary Facility
 
| Primary Facility
| 10/19/2011
+
| 2011-10-19
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 210: Line 235:
 
| 2017495
 
| 2017495
 
| Primary Facility
 
| Primary Facility
| 11/03/2011
+
| 2011-11-03
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 217: Line 242:
 
| 2034155
 
| 2034155
 
| Primary Facility
 
| Primary Facility
| 01/10/2012
+
| 2012-01-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 224: Line 249:
 
| 2074779
 
| 2074779
 
| Primary Facility
 
| Primary Facility
| 06/11/2012
+
| 2012-06-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 268: Line 293:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 07:16, 2 August 2019

Well Details

Well ID: 37-111-20308
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Black Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147168
Farm/Lease Name: TREES UNIT 1H
License Status: Plugged OG Well
Spud Date: 2011-09-22
Permit Date: 2011-05-27
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.8566
Longitude: -79.171203

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-S02 Drill Cuttings (in Tons) 1,233.84 Tons LANDFILL 100081
2013-S01 Drill Cuttings (in Tons) 67.71 Tons LANDFILL 100419
2013-S02 Drill Cuttings (in Tons) 341.02 Tons LANDFILL 100419

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2004082 Primary Facility 2011-09-08 Routine/Complete Inspection No Violations Noted During this inspection, well sign, ES plan, and valid ESCGP-1 present. Site gated and locked. Well staked not yet drilled. BMPs installed and functioning as outlined in ES plan. Previously disturbed areas appeared to be seeded and mulched with observed growth, although it is recommended that operator reseed or blanket soil pile in order to prevent a possible erosion event as minimal growth observed at this time. Red staining of soil observed at toe of pad slope¿operator investigated and believes decomposition from fill material is causing the red staining. Accompanied by WQS Marc Maestra during inspection.
2006180 Primary Facility 2011-09-28 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chevron contracted Paterson rig 255. Dewayne Pauley is the representative for Chevron. Conductor pipe was set at 60 ft. (20¿¿pipe) and was grouted in place. DEP performed a site walk and did not find any issues. Chevron/Patterson was in the process of procuring the site for drilling. According to Dewayne, drilling of the vertical section should begin during the week of October 2nd.
2009464 Primary Facility 2011-10-05 Drilling/Alteration No Violations Noted Chevron contracted Patterson 255. Don Henson contact person for Chief. Rig was still being procured for drilling.
2009613 Primary Facility 2011-10-04 Routine/Complete Inspection No Violations Noted : Site visit was part of routine inspection due to spud notification. Inspection was conducted with April Weiland.
2012156 Primary Facility 2011-10-19 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chevron had contracted Paterson rig 255. Dewayne Pauley was present representing Chief under Chevron. Conductor pipe (20¿) was set at 62 feet and was grouted in place. The Surface pipe (13 3/8¿) was set at 417 feet and was cemented with 340 sacks of Type I with 34 bbls of return. The Intermediate pipe (9 5/8¿) was set at 1820 feet and was cemented with 600 sks of Type I with 20 bbls of return. Current depth was at 7620 feet. This drilling phase is projected to drill a vertical pilot hole to a depth of 8560 feet. Chief is anticipated completion time of 10/22/11 for this phase.
2017495 Primary Facility 2011-11-03 Routine/Complete Inspection No Violations Noted well sign, ES plan, ESCGP-1 present, but no PPC plan. Chevron Regulatory Compliance Specialist Alexander onsite. Access road stable and adequately maintained, wash rack located at site entrance. Pad adequately rocked. Well drilled, operator currently rigging down. Secondary containment located on pad beneath rig, as well as franc tanks. Bmp's installed according to plan and appear to be functioning, although department noted a piece of felt, plastic, geotextile, and various pieces of scrap wood place in ditches surrounding well site. Two unlabeled black barrels located off of secondary containment on wood pallets near soil pile. Department requested that operator place barrels on secondary containment as well as remove debris from ditches. Site has been seeded/mulched with minimal growth, recommend operator reseed and mulch soil pile to ensure adequate temporary stabilization is sustained. No accelerated erosion or sedimentation issues noted. Operator immediately responding to potential pollution concerns noted above.
2034155 Primary Facility 2012-01-10 Routine/Complete Inspection No Violations Noted At the time of inspection, well site ID sign, ES plan, ESCGP-1, PPC plan present. Well Spudded 9/21/11. Well site gated and locked. Access road stable. Pad adequately rocked. Well drilled not yet equipped for prodcution. Site appears temporarily stabilized. Temporary bmp's installed and functioning according to plan. No accelerated erosion or sedimenation issues noted. Since last inspection, soil pile has been reseeded. No violations noted during this inspection. Accompanied by WQS Marc Maestra.
2074779 Primary Facility 2012-06-11 Routine/Complete Inspection No Violations Noted Inspected site with Curtis Small. No issues noted on this site.
2496117 Primary Facility 2016-06-13 Routine/Complete Inspection In Compliance with Policy At time of inspection well appears to be plugged. Access road gated. Security fence surrounding site. No erected monument located. Site vegetated and appears permanently stabilized.

Department unable to locate plugging certificate. Department recommends Operator re-submit plugging certificate. Operator appears to be In Compliance with Policy at this time.

For data sources see[6]

References