Difference between revisions of "37-111-20308"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20308
 
| Well ID: 37-111-20308
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.8566, -79.171202 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.8566, -79.171202 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Somerset County, Pennsylvania|Somerset]]
 
| County: [[Somerset County, Pennsylvania|Somerset]]
Line 9: Line 9:
 
| Municipality: [[Black Township, Somerset County, Pennsylvania|Black Township]]
 
| Municipality: [[Black Township, Somerset County, Pennsylvania|Black Township]]
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[147168]]
+
| Well Pad ID: [[147168|147168]]
 
|-
 
|-
 
| Farm/Lease Name: TREES UNIT 1H
 
| Farm/Lease Name: TREES UNIT 1H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
| Violations: None
+
| Violations: 0
 
|-
 
|-
 
| Latitude: 39.8566
 
| Latitude: 39.8566
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | PERIOD
!scope="col" | DATE
+
!scope="col" | GAS QUANTITY
!scope="col" | DESCRIPTION
+
!scope="col" | GAS PRODUCTION DAYS
!scope="col" | COMMENT
+
!scope="col" | CONDENSATE QUANTITY
!scope="col" | VIOLATION ID
+
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2004082
+
| 2011-1
| 2011-09-08
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| During this inspection, well sign, ES plan, and valid ESCGP-1 present. Site gated and locked. Well staked not yet drilled. BMPs installed and functioning as outlined in ES plan. Previously disturbed areas appeared to be seeded and mulched with observed growth, although it is recommended that operator reseed or blanket soil pile in order to prevent a possible erosion event as minimal growth observed at this time. Red staining of soil observed at toe of pad slope¿operator investigated and believes decomposition from fill material is causing the red staining.  Accompanied by WQS Marc Maestra during inspection.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2006180
+
| 2011-1
| 2011-09-28
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| At the time of inspection, no E&S or IW discharge issues at the site. Chevron contracted Paterson rig 255.  Dewayne Pauley is the representative for Chevron.  Conductor pipe was set at 60 ft. (20¿¿pipe) and was grouted in place.  DEP performed a site walk and did not find any issues.  Chevron/Patterson was in the process of procuring the site for drilling.  According to Dewayne, drilling of the vertical section should begin during the week of October 2nd.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2009464
+
| 2011-2
| 2011-10-05
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Chevron contracted Patterson 255. Don Henson contact person for Chief.  Rig was still being procured for drilling.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2009613
+
| 2011-2
| 2011-10-04
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| :   Site visit was part of routine inspection due to spud notification.  Inspection was conducted with April Weiland.
+
| style="text-align:right;" | 0.0
Met with company man Denny Wise.
+
| style="text-align:right;" | 0.0
Work was progressing on rigging up.  Drilling was to start tomorrow.
+
| style="text-align:right;" | 0.0
Pad E&S was installed and working properly (rock-lined ditches, sed trap etc.)
+
| style="text-align:right;" | 0.0
Cut slopes were lined with vegetative matting. No matting was installed on soil pile.
 
Liner was placed underneath work area.  No diking was installed around rig.
 
No violations noted at this time.
 
 
 
|
 
 
|-
 
|-
 
|-
 
|-
| 2012156
+
| 2012-1
| 2011-10-19
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| At the time of inspection, no E&S or IW discharge issues at the site. Chevron had contracted Paterson rig 255.  Dewayne Pauley was present representing Chief under Chevron.  Conductor pipe (20¿) was set at 62 feet and was grouted in place.  The Surface pipe (13 3/8¿) was set at 417 feet and was cemented with 340 sacks of Type I with 34 bbls of return.  The Intermediate pipe (9 5/8¿) was set at 1820 feet and was cemented with 600 sks of Type I with 20 bbls of return.  Current depth was at 7620 feet.  This drilling phase is projected to drill a vertical pilot hole to a depth of 8560 feet.  Chief is anticipated completion time of 10/22/11 for this phase.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2017495
+
| 2012-2
| 2011-11-03
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| well sign, ES plan, ESCGP-1 present, but no PPC plan. Chevron Regulatory Compliance Specialist Alexander onsite.  Access road stable and adequately maintained, wash rack located at site entrance.  Pad adequately rocked. Well drilled, operator currently rigging down. Secondary containment located on pad beneath rig, as well as franc tanks. Bmp's installed according to plan and appear to be functioning, although department noted a piece of felt, plastic, geotextile, and various pieces of scrap wood place in ditches surrounding well site. Two unlabeled black barrels located off of secondary containment on wood pallets near soil pile. Department requested that operator place barrels on secondary containment as well as remove debris from ditches. Site has been seeded/mulched with minimal growth, recommend operator reseed and mulch soil pile to ensure adequate temporary stabilization is sustained.  No accelerated erosion or sedimentation issues noted. Operator immediately responding to potential pollution concerns noted above.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2034155
+
| 2013-1
| 2012-01-10
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| At the time of inspection, well site ID sign, ES plan, ESCGP-1, PPC plan present. Well Spudded 9/21/11.  Well site gated and locked. Access road stable. Pad adequately rocked. Well drilled not yet equipped for prodcution. Site appears temporarily stabilized. Temporary bmp's installed and functioning according to plan. No accelerated erosion or sedimenation issues noted. Since last inspection, soil pile has been reseeded. No violations noted during this inspection. Accompanied by WQS Marc Maestra.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2074779
+
| 2013-2
| 2012-06-11
 
| No Violations Noted
 
| Inspected site with Curtis Small. No issues noted on this site.
 
|
 
|-
 
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
| 2012-2
 
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 124: Line 116:
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2014-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 133: Line 125:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2014-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 142: Line 134:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2015-02
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 151: Line 143:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2015-01
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 160: Line 152:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 169: Line 161:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 183: Line 181:
 
| 2011-2
 
| 2011-2
 
| DRILL CUTTINGS
 
| DRILL CUTTINGS
| style="text-align:right;" | 1233.84
+
| style="text-align:right;" | 1.0
 
| Tons
 
| Tons
 
| LANDFILL
 
| LANDFILL
 
| 100081
 
| 100081
| WASTE MANAGEMENT, INC - SOUTHERN ALLEGHENIES
+
| SOUTHERN ALLEGHENIES LANDFILL
 
| DAVIDSVILLE
 
| DAVIDSVILLE
 +
| PA
 +
|-
 +
|-
 +
| 2013-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 67.71
 +
| Tons
 +
| LANDFILL
 +
| 100419
 +
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
 +
| MCCLELLANDTOWN
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 341.02
 +
| Tons
 +
| LANDFILL
 +
| 100419
 +
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
 +
| MCCLELLANDTOWN
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 2004082
 +
| 2011-09-08
 +
| No Violations Noted
 +
| During this inspection, well sign, ES plan, and valid ESCGP-1 present. Site gated and locked. Well staked not yet drilled. BMPs installed and functioning as outlined in ES plan. Previously disturbed areas appeared to be seeded and mulched with observed growth, although it is recommended that operator reseed or blanket soil pile in order to prevent a possible erosion event as minimal growth observed at this time. Red staining of soil observed at toe of pad slope﾿operator investigated and believes decomposition from fill material is causing the red staining.  Accompanied by WQS Marc Maestra during inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2006180
 +
| 2011-09-28
 +
| No Violations Noted
 +
| At the time of inspection, no E&S or IW discharge issues at the site. Chevron contracted Paterson rig 255.  Dewayne Pauley is the representative for Chevron.  Conductor pipe was set at 60 ft. (20﾿﾿pipe) and was grouted in place.  DEP performed a site walk and did not find any issues.  Chevron/Patterson was in the process of procuring the site for drilling.  According to Dewayne, drilling of the vertical section should begin during the week of October 2nd.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2009464
 +
| 2011-10-05
 +
| No Violations Noted
 +
| Chevron contracted Patterson 255. Don Henson contact person for Chief.  Rig was still being procured for drilling.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2009613
 +
| 2011-10-04
 +
| No Violations Noted
 +
| :  Site visit was part of routine inspection due to spud notification.  Inspection was conducted with April Weiland.
 +
Met with company man Denny Wise.
 +
Work was progressing on rigging up.  Drilling was to start tomorrow.
 +
Pad E&S was installed and working properly (rock-lined ditches, sed trap etc.)
 +
Cut slopes were lined with vegetative matting.  No matting was installed on soil pile.
 +
Liner was placed underneath work area.  No diking was installed around rig.
 +
No violations noted at this time.
  
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2012156
 +
| 2011-10-19
 +
| No Violations Noted
 +
| At the time of inspection, no E&S or IW discharge issues at the site. Chevron had contracted Paterson rig 255.  Dewayne Pauley was present representing Chief under Chevron.  Conductor pipe (20﾿) was set at 62 feet and was grouted in place.  The Surface pipe (13 3/8﾿) was set at 417 feet and was cemented with 340 sacks of Type I with 34 bbls of return.  The Intermediate pipe (9 5/8﾿) was set at 1820 feet and was cemented with 600 sks of Type I with 20 bbls of return.  Current depth was at 7620 feet.  This drilling phase is projected to drill a vertical pilot hole to a depth of 8560 feet.  Chief is anticipated completion time of 10/22/11 for this phase.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2017495
 +
| 2011-11-03
 +
| No Violations Noted
 +
| well sign, ES plan, ESCGP-1 present, but no PPC plan.  Chevron Regulatory Compliance Specialist Alexander onsite.  Access road stable and adequately maintained, wash rack located at site entrance.  Pad adequately rocked. Well drilled, operator currently rigging down. Secondary containment located on pad beneath rig, as well as franc tanks. Bmp's installed according to plan and appear to be functioning, although department noted a piece of felt, plastic, geotextile, and various pieces of scrap wood place in ditches surrounding well site. Two unlabeled black barrels located off of secondary containment on wood pallets near soil pile. Department requested that operator place barrels on secondary containment as well as remove debris from ditches. Site has been seeded/mulched with minimal growth, recommend operator reseed and mulch soil pile to ensure adequate temporary stabilization is sustained.  No accelerated erosion or sedimentation issues noted. Operator immediately responding to potential pollution concerns noted above.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2034155
 +
| 2012-01-10
 +
| No Violations Noted
 +
| At the time of inspection, well site ID sign, ES plan, ESCGP-1, PPC plan present.  Well Spudded 9/21/11.  Well site gated and locked. Access road stable. Pad adequately rocked. Well drilled not yet equipped for prodcution. Site appears temporarily stabilized. Temporary bmp's installed and functioning according to plan. No accelerated erosion or sedimenation issues noted. Since last inspection, soil pile has been reseeded. No violations noted during this inspection. Accompanied by WQS Marc Maestra.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2074779
 +
| 2012-06-11
 +
| No Violations Noted
 +
| Inspected site with Curtis Small. No issues noted on this site.
 +
|
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Inspection Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 16:26, 26 June 2015

Well Details

Well ID: 37-111-20308
Loading map...
County: Somerset
Municipality: Black Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147168
Farm/Lease Name: TREES UNIT 1H
First Permit Date: 2011-05-27
Last Permit Date: 2011-05-27
Spud Date: 2011-09-22
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.8566
Longitude: -79.171202

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 0.0 0.0 0.0 0.0 0.0 0.0
2014-2 0.0 0.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 0.0 0.0 0.0 0.0 0.0 0.0
2015-03 0.0 0.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-2 DRILL CUTTINGS 1.0 Tons LANDFILL 100081 SOUTHERN ALLEGHENIES LANDFILL DAVIDSVILLE PA
2013-1 DRILL CUTTINGS 67.71 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2013-2 DRILL CUTTINGS 341.02 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2004082 2011-09-08 No Violations Noted During this inspection, well sign, ES plan, and valid ESCGP-1 present. Site gated and locked. Well staked not yet drilled. BMPs installed and functioning as outlined in ES plan. Previously disturbed areas appeared to be seeded and mulched with observed growth, although it is recommended that operator reseed or blanket soil pile in order to prevent a possible erosion event as minimal growth observed at this time. Red staining of soil observed at toe of pad slope﾿operator investigated and believes decomposition from fill material is causing the red staining. Accompanied by WQS Marc Maestra during inspection.
2006180 2011-09-28 No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chevron contracted Paterson rig 255. Dewayne Pauley is the representative for Chevron. Conductor pipe was set at 60 ft. (20﾿﾿pipe) and was grouted in place. DEP performed a site walk and did not find any issues. Chevron/Patterson was in the process of procuring the site for drilling. According to Dewayne, drilling of the vertical section should begin during the week of October 2nd.
2009464 2011-10-05 No Violations Noted Chevron contracted Patterson 255. Don Henson contact person for Chief. Rig was still being procured for drilling.
2009613 2011-10-04 No Violations Noted : Site visit was part of routine inspection due to spud notification. Inspection was conducted with April Weiland.

Met with company man Denny Wise. Work was progressing on rigging up. Drilling was to start tomorrow. Pad E&S was installed and working properly (rock-lined ditches, sed trap etc.) Cut slopes were lined with vegetative matting. No matting was installed on soil pile. Liner was placed underneath work area. No diking was installed around rig. No violations noted at this time.

2012156 2011-10-19 No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chevron had contracted Paterson rig 255. Dewayne Pauley was present representing Chief under Chevron. Conductor pipe (20﾿) was set at 62 feet and was grouted in place. The Surface pipe (13 3/8﾿) was set at 417 feet and was cemented with 340 sacks of Type I with 34 bbls of return. The Intermediate pipe (9 5/8﾿) was set at 1820 feet and was cemented with 600 sks of Type I with 20 bbls of return. Current depth was at 7620 feet. This drilling phase is projected to drill a vertical pilot hole to a depth of 8560 feet. Chief is anticipated completion time of 10/22/11 for this phase.
2017495 2011-11-03 No Violations Noted well sign, ES plan, ESCGP-1 present, but no PPC plan. Chevron Regulatory Compliance Specialist Alexander onsite. Access road stable and adequately maintained, wash rack located at site entrance. Pad adequately rocked. Well drilled, operator currently rigging down. Secondary containment located on pad beneath rig, as well as franc tanks. Bmp's installed according to plan and appear to be functioning, although department noted a piece of felt, plastic, geotextile, and various pieces of scrap wood place in ditches surrounding well site. Two unlabeled black barrels located off of secondary containment on wood pallets near soil pile. Department requested that operator place barrels on secondary containment as well as remove debris from ditches. Site has been seeded/mulched with minimal growth, recommend operator reseed and mulch soil pile to ensure adequate temporary stabilization is sustained. No accelerated erosion or sedimentation issues noted. Operator immediately responding to potential pollution concerns noted above.
2034155 2012-01-10 No Violations Noted At the time of inspection, well site ID sign, ES plan, ESCGP-1, PPC plan present. Well Spudded 9/21/11. Well site gated and locked. Access road stable. Pad adequately rocked. Well drilled not yet equipped for prodcution. Site appears temporarily stabilized. Temporary bmp's installed and functioning according to plan. No accelerated erosion or sedimenation issues noted. Since last inspection, soil pile has been reseeded. No violations noted during this inspection. Accompanied by WQS Marc Maestra.
2074779 2012-06-11 No Violations Noted Inspected site with Curtis Small. No issues noted on this site.

For data sources see[3]

References