X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20291"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20291
 
| Well ID: 37-111-20291
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.033638, -79.184861 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.033638, -79.184861 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Somerset County, Pennsylvania|Somerset]]
 
| County: [[Somerset County, Pennsylvania|Somerset]]
Line 9: Line 9:
 
| Municipality: [[Jefferson Township, Somerset County, Pennsylvania|Jefferson Township]]
 
| Municipality: [[Jefferson Township, Somerset County, Pennsylvania|Jefferson Township]]
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[149131]]
+
| Well Pad ID: [[149131|149131]]
 
|-
 
|-
 
| Farm/Lease Name: R MILLER UNIT 2H
 
| Farm/Lease Name: R MILLER UNIT 2H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: No
+
| Well Status: ACTIVE
 
|-
 
|-
| Violations: None
+
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.033638
 
| Latitude: 40.033638
 
|-
 
|-
 
| Longitude: -79.184861
 
| Longitude: -79.184861
|-
 
|}
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | INSPECTION ID
 
!scope="col" | DATE
 
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
|-
 
| 2004283
 
| 2011-09-13
 
| No Violations Noted
 
| During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan w/ PPC plan, and ESCGP-1 onsite. Well drilled not yet in production. Access road/entrance and well pad adequately rocked. BMPs installed and functioning according to ES Control Plan and appear properly maintained.  No accelerated erosion or sedimentation issues noted during inspection. Previously disturbed areas have been seeded/mulched with growth observed. R Miller 6H recently spudded and drilled. No pits or tanks present on site. No violations noted during this inspection.
 
|
 
|-
 
|-
 
| 2006207
 
| 2011-09-28
 
| No Violations Noted
 
| At the time of inspection, drilling equipment was removed from site.  No E&S or IW issues.  Well head was completed with well head manifold.  No pressure reading on the gauge located at the manifold.  Annulus valve was closed.
 
|
 
|-
 
|-
 
| 1985943
 
| 2011-06-28
 
| No Violations Noted
 
| At the time of inspection, drilling equipment was removed from site.  No E&S or IW issues.  Well head was completed with well head manifold.  No pressure on the gauge at the manifold.
 
|
 
|-
 
|-
 
| 1986026
 
| 2011-06-09
 
| No Violations Noted
 
| Chief contracted UDI 5 to install gas well.  Chief contact person was Dewayne Pauley. Conductor pipe (20¿) installed to 60 ft and grouted to surface.  Second stringer was 13 3/8¿ installed to 462 ft with 330 sks of gas blocks with 11 bbl return.  Current depth was 1781.  At the time of inspection, no E&S issues or IW issues at the site. Chief proposing to install 9 5/8¿ pipe to 1811 ft.
 
|
 
|-
 
|-
 
| 2034177
 
| 2012-01-10
 
| No Violations Noted
 
| During this inspection; well sign,  ES plan, ESCGP-1, and PPC plan onsite.  Well tag present, although recommend operator update well tags to include current operator information.
 
Well spudded 6/2/11. Well drilled. Access road/entrance and well pad adequately rocked. BMPs installed and functioning according to ES Plan and appear properly maintained.  No accelerated erosion or sedimentation issues noted during inspection. Previously disturbed areas have been seeded/mulched with adequate growth observed. R Miller 1H and 6H spudded and drilled, although yet in production. No pits or tanks present on site. Miller pipeline propject actively being installed. No violations noted during this inspection.
 
 
|
 
|-
 
|-
 
| 2069379
 
| 2012-05-10
 
| No Violations Noted
 
| At the time of this inspection, site Id sign, Es plan, ESCGP-1, and PPC plan onsite. Site gated and monitored by 24hr security. Multi well pad. Said well previously drilled.  Crown Rig # 8 actively drilling 6H.  Charles, DSM onsite during this inspection. Secondary containment in place beneath rig and onsite tanks. No pits installed by Chevron for drilling operations. Tanks and secondary containment look structurally sound. Appears bmp's are installed and functioning according to plan. No accelerated erosion or sedimentation issues noted with site or access road. Access road adequately rocked.Noted a "small" leak coming from Residual waste box on site, notified DSM whom stated the problem would be addressed immediately. Absorbent pads were placed in location of leak. Department also noted to DSM of a possible safety concern near back side of rig, where it appears shale was placed over top electric lines and drilling equipment (see picture).  DSM stated that matter would be addressed immediately  no violations noted.
 
|
 
|-
 
|-
 
| 2070076
 
| 2012-04-20
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2.  Conductor pipe was set at 60 ft. (20’’pipe) and was grouted in place.  13 3/8” pipe was set at 457’ (surface pipe) and the 9 5/8” pipe was set at 1807 feet.  Chevron current depth was 5,663 feet. Chevron was planning to TD at 7500 feet and set the kick off point.  DEP personnel performed a site walk and did not find any issues.
 
|
 
|-
 
|-
 
| 2082062
 
| 2012-07-03
 
| No Violations Noted
 
|
 
|
 
|-
 
|-
 
| 2092742
 
| 2012-05-15
 
| No Violations Noted
 
| Well 2H was completed and Chevron was setting up on 6H.
 
|
 
|-
 
|-
 
| 2092873
 
| 2012-06-01
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2.  Conductor pipe was set at 60 ft. (20’’pipe) and was grouted in place.  13 3/8” pipe was set at 457’ (surface pipe) and the 9 5/8” pipe was set at 1807 feet.  Chevron current depth was 14,255 feet. Chevron set the kick off point at 7829 ft.  DEP personnel performed a site walk and did not find any issues. 
 
 
 
|
 
|-
 
|-
 
| 2094651
 
| 2012-08-06
 
| No Violations Noted
 
| At the time of inspection, no site activity and no E&S issues were present.
 
 
 
|
 
 
|-
 
|-
 
|}
 
|}
Line 135: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2012-2
+
| 2010-3
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2010-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 144: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 171: Line 98:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2012-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2012-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-1
 +
| style="text-align:right;" | 224467.0
 +
| style="text-align:right;" | 181.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-2
 +
| style="text-align:right;" | 151486.0
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 145234.0
 +
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 180: Line 143:
 
|-
 
|-
 
|-
 
|-
| 2010-2
+
| 2014-2
 +
| style="text-align:right;" | 139084.0
 +
| style="text-align:right;" | 153.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 17522.0
 +
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 189: Line 161:
 
|-
 
|-
 
|-
 
|-
| 2010-3
+
| 2015-01
 +
| style="text-align:right;" | 20037.0
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 18892.0
 +
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 198: Line 179:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 209: Line 196:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 +
|-
 +
| 2011-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 462.41
 +
| Tons
 +
| LANDFILL
 +
| 100081
 +
| SOUTHERN ALLEGHENIES LANDFILL
 +
| DAVIDSVILLE
 +
| PA
 +
|-
 +
|-
 +
| 2011-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 130.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| EPA ID: 748-163
 +
| PATRIOT WATER TREATMENT
 +
| WARREN
 +
| OH
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 360.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR DRILLING OR PLUGGING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
| RONCO WASTE PROCESSING FACILITY
 +
| MASONTOWN
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 29.71
 +
| Tons
 +
| LANDFILL
 +
| 101421
 +
| SHADE LANDFILL
 +
| CAIRNBROOK
 +
| PA
 +
|-
 
|-
 
|-
 
| 2012-2
 
| 2012-2
Line 215: Line 257:
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0253723
+
| WMGR123SW001
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
+
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| MASONTOWN
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| FLOWBACK FRACTURING SAND
 +
| style="text-align:right;" | 7.24
 +
| Tons
 +
| LANDFILL
 +
| 100419
 +
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
 +
| MCCLELLANDTOWN
 
| PA
 
| PA
 
|-
 
|-
Line 223: Line 276:
 
| 2012-2
 
| 2012-2
 
| FRACING FLUID WASTE
 
| FRACING FLUID WASTE
| style="text-align:right;" | 8438.0
+
| style="text-align:right;" | 8.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0253723
+
| WMGR123SW001
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
+
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| MASONTOWN
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2013-1
| DRILLING FLUID WASTE
+
| FLOWBACK FRACTURING SAND
| style="text-align:right;" | 130.0
+
| style="text-align:right;" | 1.5
 +
| Tons
 +
| LANDFILL
 +
| 100419
 +
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
 +
| MCCLELLANDTOWN
 +
| PA
 +
|-
 +
|-
 +
| 2013-1
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 3.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR DRILLING OR PLUGGING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 5.0
 
| Bbl
 
| Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| REUSE OTHER THAN ROAD SPREADING
| EPA ID: 748-163
+
|  
| PATRIOT WATER TREATMENT
+
| REUSE FOR DRILLING OR PLUGGING
| WARREN
+
|  
| OH
+
|  
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2013-2
 
| DRILL CUTTINGS
 
| DRILL CUTTINGS
| style="text-align:right;" | 462.41
+
| style="text-align:right;" | 270.42
 +
| Tons
 +
| LANDFILL
 +
| 100172
 +
| ARDEN LANDFILL
 +
| WASHINGTON
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| FLOWBACK FRACTURING SAND
 +
| style="text-align:right;" | 10.51
 
| Tons
 
| Tons
 
| LANDFILL
 
| LANDFILL
| 100081
+
| 100419
| WASTE MANAGEMENT, INC - SOUTHERN ALLEGHENIES
+
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
| DAVIDSVILLE
+
| MCCLELLANDTOWN
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2013-2
| DRILLING FLUID WASTE
+
| PRODUCED FLUID
| style="text-align:right;" | 1195.0
+
| style="text-align:right;" | 4.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 3.0
 
| Bbl
 
| Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| REUSE OTHER THAN ROAD SPREADING
| PA0253723
+
|  
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
+
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
| MASONTOWN
+
|  
| PA
+
|  
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2014-2
| DRILLING FLUID WASTE
+
| PRODUCED FLUID
| style="text-align:right;" | 360.0
+
| style="text-align:right;" | 2.0
 
| Bbl
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR DRILLING OR PLUGGING
+
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 
|  
 
|  
| PA
+
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 26.66
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-23995
 +
| WARREN DRILLING CO #1 (SWIW #6)
 +
| DEXTER CITY
 +
| OH
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 2004283
 +
| 2011-09-13
 +
| No Violations Noted
 +
| During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan w/ PPC plan, and ESCGP-1 onsite. Well drilled not yet in production. Access road/entrance and well pad adequately rocked. BMPs installed and functioning according to ES Control Plan and appear properly maintained.  No accelerated erosion or sedimentation issues noted during inspection. Previously disturbed areas have been seeded/mulched with growth observed. R Miller 6H recently spudded and drilled. No pits or tanks present on site. No violations noted during this inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2006207
 +
| 2011-09-28
 +
| No Violations Noted
 +
| At the time of inspection, drilling equipment was removed from site.  No E&S or IW issues.  Well head was completed with well head manifold.  No pressure reading on the gauge located at the manifold.  Annulus valve was closed.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1985943
 +
| 2011-06-28
 +
| No Violations Noted
 +
| At the time of inspection, drilling equipment was removed from site.  No E&S or IW issues.  Well head was completed with well head manifold.  No pressure on the gauge at the manifold.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1986026
 +
| 2011-06-09
 +
| No Violations Noted
 +
| Chief contracted UDI 5 to install gas well.  Chief contact person was Dewayne Pauley. Conductor pipe (20﾿) installed to 60 ft and grouted to surface.  Second stringer was 13 3/8﾿ installed to 462 ft with 330 sks of gas blocks with 11 bbl return.  Current depth was 1781.  At the time of inspection, no E&S issues or IW issues at the site. Chief proposing to install 9 5/8﾿ pipe to 1811 ft.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2034177
 +
| 2012-01-10
 +
| No Violations Noted
 +
| During this inspection; well sign,  ES plan, ESCGP-1, and PPC plan onsite.  Well tag present, although recommend operator update well tags to include current operator information.
 +
Well spudded 6/2/11. Well drilled. Access road/entrance and well pad adequately rocked. BMPs installed and functioning according to ES Plan and appear properly maintained.  No accelerated erosion or sedimentation issues noted during inspection. Previously disturbed areas have been seeded/mulched with adequate growth observed. R Miller 1H and 6H spudded and drilled, although yet in production. No pits or tanks present on site. Miller pipeline propject actively being installed. No violations noted during this inspection.
 +
 
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2069379
 +
| 2012-05-10
 +
| No Violations Noted
 +
| At the time of this inspection, site Id sign, Es plan, ESCGP-1, and PPC plan onsite. Site gated and monitored by 24hr security. Multi well pad. Said well previously drilled.  Crown Rig # 8 actively drilling 6H.  Charles, DSM onsite during this inspection. Secondary containment in place beneath rig and onsite tanks. No pits installed by Chevron for drilling operations. Tanks and secondary containment look structurally sound. Appears bmp's are installed and functioning according to plan. No accelerated erosion or sedimentation issues noted with site or access road. Access road adequately rocked.Noted a "small" leak coming from Residual waste box on site, notified DSM whom stated the problem would be addressed immediately. Absorbent pads were placed in location of leak. Department also noted to DSM of a possible safety concern near back side of rig, where it appears shale was placed over top electric lines and drilling equipment (see picture).  DSM stated that matter would be addressed immediately  no violations noted.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2070076
 +
| 2012-04-20
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2.  Conductor pipe was set at 60 ft. (20ï¾’ï¾’pipe) and was grouted in place.  13 3/8ï¾” pipe was set at 457ï¾’ (surface pipe) and the 9 5/8ï¾” pipe was set at 1807 feet.  Chevron current depth was 5,663 feet. Chevron was planning to TD at 7500 feet and set the kick off point.  DEP personnel performed a site walk and did not find any issues.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2082062
 +
| 2012-07-03
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2092742
 +
| 2012-05-15
 +
| No Violations Noted
 +
| Well 2H was completed and Chevron was setting up on 6H.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2092873
 +
| 2012-06-01
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2.  Conductor pipe was set at 60 ft. (20ï¾’ï¾’pipe) and was grouted in place.  13 3/8ï¾” pipe was set at 457ï¾’ (surface pipe) and the 9 5/8ï¾” pipe was set at 1807 feet.  Chevron current depth was 14,255 feet. Chevron set the kick off point at 7829 ft.  DEP personnel performed a site walk and did not find any issues. 
 +
 
 +
 
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2094651
 +
| 2012-08-06
 +
| No Violations Noted
 +
| At the time of inspection, no site activity and no E&S issues were present.
 +
 
 +
 
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2141760
 +
| 2013-02-19
 +
| In Compliance with Policy
 +
| Admin Inspt. Spoke to Chevron representative B.A. Lambie via phone on 2/19/13. According to Mr. Lambie, on 2/18/13 as truck was loading production brine, truck tank began leaking due to failed tank seam. Resulted in approximately 10 gallons of brine released to ground, impacting an approximate area of 15 square feet. Impacted materials immediately excavated into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2145150
 +
| 2013-02-25
 +
| No Violations Noted
 +
| Regulatory inactive status. Multi-well pad.
 +
Site ID sign, permit, E&S plan, ESCGPI, PPC plan all on-site.
 +
At time of inspection, 2H and 1H, 6H drilled and equipped for production. Brine tanks on steel containment, both appear structually stable. Site temporarily stabilized. Access road stable, adequately rocked. No accelerated E&S issues observed in relation to well pad and access road.
 +
According to records, as of 8/21/2012, 3H, 4H, and 5H were all proposed, but never materialized. Department recommends that Operator update site ID sign to ensure that only wells with active permits are listed.
 +
 
 +
Accompanied by WQS April Weiland.
  
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2159322
 +
| 2013-04-18
 +
| No Violations Noted
 +
| Routine inspection. 5 unmarked drums found on site.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2169728
 +
| 2013-05-22
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2181817
 +
| 2013-07-09
 +
| No Violations Noted
 +
| Inspectd site. No issues noted other than there are  5 un marked drums on site. These drums were noted on a 5/22/13 inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2196932
 +
| 2013-08-20
 +
| No Violations Noted
 +
| Inspected the site on 8/20/13. There was not any activity on the restored well pad. The road going into the site was well graveled. The welll pad was well graveled. The Well pad signs were properly marked. This pad has three producing Marcelus gas wells. The three wells were properly marked.The drums observed  in the past inspection were removed from the pad.There were two dumpsters on the well pad that contained Demo waste. No staining on the well pad was observed. The fresh water impoundment is now fenced in. No E&S issues were observed. During the inspection no issues were observed that need to be addresed
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2238794
 +
| 2014-01-22
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present.  Well was in production.
 +
 +
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2323954
 +
| 2014-11-24
 +
| No Violations Noted
 +
| At the time of inspection
 +
|
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Inspection Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 21:46, 26 June 2015

Well Details

Well ID: 37-111-20291
Loading map...
County: Somerset
Municipality: Jefferson Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149131
Farm/Lease Name: R MILLER UNIT 2H
First Permit Date: 2010-01-07
Last Permit Date: 2010-12-30
Spud Date: 2011-06-02
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.033638
Longitude: -79.184861

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 224467.0 181.0 0.0 0.0 0.0 0.0
2013-2 151486.0 184.0 0.0 0.0 0.0 0.0
2014-1 145234.0 181.0 0.0 0.0 0.0 0.0
2014-2 139084.0 153.0 0.0 0.0 0.0 0.0
2015-02 17522.0 28.0 0.0 0.0 0.0 0.0
2015-01 20037.0 31.0 0.0 0.0 0.0 0.0
2015-03 18892.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-1 DRILL CUTTINGS 462.41 Tons LANDFILL 100081 SOUTHERN ALLEGHENIES LANDFILL DAVIDSVILLE PA
2011-1 DRILLING FLUID WASTE 130.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163 PATRIOT WATER TREATMENT WARREN OH
2012-1 DRILLING FLUID WASTE 360.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 DRILL CUTTINGS 29.71 Tons LANDFILL 101421 SHADE LANDFILL CAIRNBROOK PA
2012-2 DRILLING FLUID WASTE 825.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 FLOWBACK FRACTURING SAND 7.24 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2012-2 FRACING FLUID WASTE 8.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-1 FLOWBACK FRACTURING SAND 1.5 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2013-1 FRACING FLUID WASTE 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 5.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-2 DRILL CUTTINGS 270.42 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2013-2 FLOWBACK FRACTURING SAND 10.51 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2013-2 PRODUCED FLUID 4.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 26.66 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2004283 2011-09-13 No Violations Noted During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan w/ PPC plan, and ESCGP-1 onsite. Well drilled not yet in production. Access road/entrance and well pad adequately rocked. BMPs installed and functioning according to ES Control Plan and appear properly maintained. No accelerated erosion or sedimentation issues noted during inspection. Previously disturbed areas have been seeded/mulched with growth observed. R Miller 6H recently spudded and drilled. No pits or tanks present on site. No violations noted during this inspection.
2006207 2011-09-28 No Violations Noted At the time of inspection, drilling equipment was removed from site. No E&S or IW issues. Well head was completed with well head manifold. No pressure reading on the gauge located at the manifold. Annulus valve was closed.
1985943 2011-06-28 No Violations Noted At the time of inspection, drilling equipment was removed from site. No E&S or IW issues. Well head was completed with well head manifold. No pressure on the gauge at the manifold.
1986026 2011-06-09 No Violations Noted Chief contracted UDI 5 to install gas well. Chief contact person was Dewayne Pauley. Conductor pipe (20﾿) installed to 60 ft and grouted to surface. Second stringer was 13 3/8﾿ installed to 462 ft with 330 sks of gas blocks with 11 bbl return. Current depth was 1781. At the time of inspection, no E&S issues or IW issues at the site. Chief proposing to install 9 5/8﾿ pipe to 1811 ft.
2034177 2012-01-10 No Violations Noted During this inspection; well sign, ES plan, ESCGP-1, and PPC plan onsite. Well tag present, although recommend operator update well tags to include current operator information.

Well spudded 6/2/11. Well drilled. Access road/entrance and well pad adequately rocked. BMPs installed and functioning according to ES Plan and appear properly maintained. No accelerated erosion or sedimentation issues noted during inspection. Previously disturbed areas have been seeded/mulched with adequate growth observed. R Miller 1H and 6H spudded and drilled, although yet in production. No pits or tanks present on site. Miller pipeline propject actively being installed. No violations noted during this inspection.

2069379 2012-05-10 No Violations Noted At the time of this inspection, site Id sign, Es plan, ESCGP-1, and PPC plan onsite. Site gated and monitored by 24hr security. Multi well pad. Said well previously drilled. Crown Rig # 8 actively drilling 6H. Charles, DSM onsite during this inspection. Secondary containment in place beneath rig and onsite tanks. No pits installed by Chevron for drilling operations. Tanks and secondary containment look structurally sound. Appears bmp's are installed and functioning according to plan. No accelerated erosion or sedimentation issues noted with site or access road. Access road adequately rocked.Noted a "small" leak coming from Residual waste box on site, notified DSM whom stated the problem would be addressed immediately. Absorbent pads were placed in location of leak. Department also noted to DSM of a possible safety concern near back side of rig, where it appears shale was placed over top electric lines and drilling equipment (see picture). DSM stated that matter would be addressed immediately no violations noted.
2070076 2012-04-20 No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2. Conductor pipe was set at 60 ft. (20ï¾’ï¾’pipe) and was grouted in place. 13 3/8ï¾” pipe was set at 457ï¾’ (surface pipe) and the 9 5/8ï¾” pipe was set at 1807 feet. Chevron current depth was 5,663 feet. Chevron was planning to TD at 7500 feet and set the kick off point. DEP personnel performed a site walk and did not find any issues.
2082062 2012-07-03 No Violations Noted
2092742 2012-05-15 No Violations Noted Well 2H was completed and Chevron was setting up on 6H.
2092873 2012-06-01 No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2. Conductor pipe was set at 60 ft. (20ï¾’ï¾’pipe) and was grouted in place. 13 3/8ï¾” pipe was set at 457ï¾’ (surface pipe) and the 9 5/8ï¾” pipe was set at 1807 feet. Chevron current depth was 14,255 feet. Chevron set the kick off point at 7829 ft. DEP personnel performed a site walk and did not find any issues.


2094651 2012-08-06 No Violations Noted At the time of inspection, no site activity and no E&S issues were present.


2141760 2013-02-19 In Compliance with Policy Admin Inspt. Spoke to Chevron representative B.A. Lambie via phone on 2/19/13. According to Mr. Lambie, on 2/18/13 as truck was loading production brine, truck tank began leaking due to failed tank seam. Resulted in approximately 10 gallons of brine released to ground, impacting an approximate area of 15 square feet. Impacted materials immediately excavated into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
2145150 2013-02-25 No Violations Noted Regulatory inactive status. Multi-well pad.

Site ID sign, permit, E&S plan, ESCGPI, PPC plan all on-site. At time of inspection, 2H and 1H, 6H drilled and equipped for production. Brine tanks on steel containment, both appear structually stable. Site temporarily stabilized. Access road stable, adequately rocked. No accelerated E&S issues observed in relation to well pad and access road. According to records, as of 8/21/2012, 3H, 4H, and 5H were all proposed, but never materialized. Department recommends that Operator update site ID sign to ensure that only wells with active permits are listed.

Accompanied by WQS April Weiland.

2159322 2013-04-18 No Violations Noted Routine inspection. 5 unmarked drums found on site.
2169728 2013-05-22 No Violations Noted
2181817 2013-07-09 No Violations Noted Inspectd site. No issues noted other than there are 5 un marked drums on site. These drums were noted on a 5/22/13 inspection.
2196932 2013-08-20 No Violations Noted Inspected the site on 8/20/13. There was not any activity on the restored well pad. The road going into the site was well graveled. The welll pad was well graveled. The Well pad signs were properly marked. This pad has three producing Marcelus gas wells. The three wells were properly marked.The drums observed in the past inspection were removed from the pad.There were two dumpsters on the well pad that contained Demo waste. No staining on the well pad was observed. The fresh water impoundment is now fenced in. No E&S issues were observed. During the inspection no issues were observed that need to be addresed
2238794 2014-01-22 No Violations Noted At the time of inspection, no E&S issues were present. Well was in production.


2323954 2014-11-24 No Violations Noted At the time of inspection

For data sources see[3]