X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-23281"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-23281
 
| Well ID: 37-085-23281
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.4473, -80.499115 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.4473, -80.499115 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: LAWRENCE SHIPULA 2
 
| Farm/Lease Name: LAWRENCE SHIPULA 2
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2003-06-03
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2003-03-21
 
| Permit Date: 2003-03-21
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.4473
 
| Latitude: 41.4473
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2003-03-21
 +
| New Permit Application
 +
|-
 +
| 2003-06-03
 +
| Performed Spud Operation
 +
|-
 +
| 2003-06-14
 +
| Drilling Completion
 +
|-
 +
| 2003-06-18
 +
| Perforation
 +
|-
 +
| 2003-08-29
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2004
 
| 2004
 
| [[EXCO RESOURCES PA INC]]
 
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 25,827.00
+
| style="text-align: right;" | 25827
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 131.28
 
| style="text-align: right;" | 131.28
Line 113: Line 154:
 
|-
 
|-
 
| 2007
 
| 2007
| style="text-align: right;" |
+
| [[EXCO RESOURCES PA INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 123: Line 164:
 
| 2008
 
| 2008
 
| [[EXCO RESOURCES PA INC]]
 
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 9,057.00
+
| style="text-align: right;" | 9057.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 43.22
 
| style="text-align: right;" | 43.22
Line 132: Line 173:
 
| 2009
 
| 2009
 
| [[EXCO RESOURCES PA INC]]
 
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 6,725.00
+
| style="text-align: right;" | 6725
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 39.00
+
| style="text-align: right;" | 39
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 140: Line 181:
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[EXCO RESOURCES PA INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 217: Line 258:
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[ENERVEST OPR LLC]]
 +
| style="text-align: right;" | 1,686.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 38.00
 +
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 230: Line 280:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 235: Line 286:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2004-A00
+
| 2004
 +
| [[EXCO RESOURCES PA INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 232.00 Bbl
 
| style="text-align: right;" | 232.00 Bbl
Line 241: Line 293:
 
| OH-1893,1894,32
 
| OH-1893,1894,32
 
|-
 
|-
| 2005-A00
+
| 2005
 +
| [[EXCO RESOURCES PA INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 189.00 Bbl
 
| style="text-align: right;" | 189.00 Bbl
Line 247: Line 300:
 
| OH-1893,1894,32
 
| OH-1893,1894,32
 
|-
 
|-
| 2006-A00
+
| 2006
 +
| [[EXCO RESOURCES PA INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 105.00 Bbl
 
| style="text-align: right;" | 105.00 Bbl
Line 253: Line 307:
 
| OH-3795
 
| OH-3795
 
|-
 
|-
| 2008-A00
+
| 2008
 +
| [[EXCO RESOURCES PA INC]]
 +
| Brine
 +
| style="text-align: right;" | 30.00 Bbl
 +
| Reuse other than road spreading
 +
|
 +
|-
 +
| 2008
 +
| [[EXCO RESOURCES PA INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 73.00 Bbl
 
| style="text-align: right;" | 73.00 Bbl
Line 259: Line 321:
 
| OH-3795
 
| OH-3795
 
|-
 
|-
| 2008-A00
+
| 2009
| Brine
+
| [[EXCO RESOURCES PA INC]]
| style="text-align: right;" | 30.00 Bbl
 
| Reuse other than road spreading
 
|
 
|-
 
| 2009-A00
 
 
| Brine
 
| Brine
 
| style="text-align: right;" | 47.00 Bbl
 
| style="text-align: right;" | 47.00 Bbl
Line 271: Line 328:
 
| OH-3795
 
| OH-3795
 
|-
 
|-
| 2011-A00
+
| 2011
| Produced Fluid (in Barrels)
+
| [[ENERVEST OPR LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 117.00 Bbl
 
| style="text-align: right;" | 117.00 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-155-23795
 
| 34-155-23795
 
|-
 
|-
| 2013-A00
+
| 2013
| Produced Fluid (in Barrels)
+
| [[ENERVEST OPR LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-133-23343
 
| 34-133-23343
 
|-
 
|-
| 2014-A00
+
| 2014
| Produced Fluid (in Barrels)
+
| [[ENERVEST OPR LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 62.51 Bbl
 
| style="text-align: right;" | 62.51 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-133-23343
 
| 34-133-23343
 
|-
 
|-
| 2014-A00
+
| 2014
| Produced Fluid (in Barrels)
+
| [[ENERVEST OPR LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 28.00 Bbl
 
| style="text-align: right;" | 28.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016-A00
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[ENERVEST OPR LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 37.50 Bbl
 
| style="text-align: right;" | 37.50 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-007-20919
 
| 34-007-20919
 
|-
 
|-
| 2017-A00
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ENERVEST OPR LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 18.33 Bbl
 
| style="text-align: right;" | 18.33 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-007-20919
 
| 34-007-20919
 
|-
 
|-
| 2018-A00
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[ENERVEST OPR LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 77.51 Bbl
 
| style="text-align: right;" | 77.51 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-007-21847
 
| 34-007-21847
 +
|-
 +
| 2019
 +
| [[ENERVEST OPR LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 24.00 Bbl
 +
| Injection Disposal Well
 +
| 34-007-20919
 +
|-
 +
| 2019
 +
| [[ENERVEST OPR LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 28.00 Bbl
 +
| Injection Disposal Well
 +
| 34-155-24063
 
|-
 
|-
 
|}
 
|}

Latest revision as of 08:33, 15 May 2020

Well Details

Well ID: 37-085-23281
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Greene Township
Operator Name: ENERVEST OPR LLC
Well Pad ID:
Farm/Lease Name: LAWRENCE SHIPULA 2
License Status: ACTIVE
Spud Date:
Permit Date: 2003-03-21
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.4473
Longitude: -80.499115

For data sources see[1][2][3]

Well History

Date Event
2003-03-21 New Permit Application
2003-06-03 Performed Spud Operation
2003-06-14 Drilling Completion
2003-06-18 Perforation
2003-08-29 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 EXCO RESOURCES PA INC 25827 365 131.28 365 0.00 0
2005 EXCO RESOURCES PA INC 26,109.00 365 105.43 365 0.00 0
2006 EXCO RESOURCES PA INC 13,895.00 365 43.16 365 0.00 0
2007 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2008 EXCO RESOURCES PA INC 9057.00 366 43.22 366 0.00 0
2009 EXCO RESOURCES PA INC 6725 365 39 365 0.00 0
2010 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2011 ENERVEST OPR LLC 6,543.00 365 42.18 365 0.00 0
2012 ENERVEST OPR LLC 2,822.00 365 0.00 0 0.00 0
2013 ENERVEST OPR LLC 3,279.08 365 0.00 0 0.00 0
2014 ENERVEST OPR LLC 3,617.31 365 43.25 365 0.00 0
2015 ENERVEST OPR LLC 3,190.00 365 0.00 0 0.00 0
2016 ENERVEST OPR LLC 2,902.00 366 0.00 0 0.00 0
2017 ENERVEST OPR LLC 2,416.00 365 46.00 365 0.00 0
2018 ENERVEST OPR LLC 2,462.00 360 0.00 0 0.00 0
2019 ENERVEST OPR LLC 1,686.00 365 38.00 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2004 EXCO RESOURCES PA INC Brine 232.00 Bbl Injection Disposal Well OH-1893,1894,32
2005 EXCO RESOURCES PA INC Brine 189.00 Bbl Injection Disposal Well OH-1893,1894,32
2006 EXCO RESOURCES PA INC Brine 105.00 Bbl Injection Disposal Well OH-3795
2008 EXCO RESOURCES PA INC Brine 30.00 Bbl Reuse other than road spreading
2008 EXCO RESOURCES PA INC Brine 73.00 Bbl Injection Disposal Well OH-3795
2009 EXCO RESOURCES PA INC Brine 47.00 Bbl Injection Disposal Well OH-3795
2011 ENERVEST OPR LLC Produced Fluid 117.00 Bbl Injection Disposal Well 34-155-23795
2013 ENERVEST OPR LLC Produced Fluid 20.00 Bbl Injection Disposal Well 34-133-23343
2014 ENERVEST OPR LLC Produced Fluid 62.51 Bbl Injection Disposal Well 34-133-23343
2014 ENERVEST OPR LLC Produced Fluid 28.00 Bbl ROAD SPREADING
2016 ENERVEST OPR LLC Produced Fluid 37.50 Bbl Injection Disposal Well 34-007-20919
2017 ENERVEST OPR LLC Produced Fluid 18.33 Bbl Injection Disposal Well 34-007-20919
2018 ENERVEST OPR LLC Produced Fluid 77.51 Bbl Injection Disposal Well 34-007-21847
2019 ENERVEST OPR LLC Produced Fluid 24.00 Bbl Injection Disposal Well 34-007-20919
2019 ENERVEST OPR LLC Produced Fluid 28.00 Bbl Injection Disposal Well 34-155-24063

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1240365 Primary Facility 2003-06-04 Drilling/Alteration No Violations Noted
1241388 Primary Facility 2003-06-06 Drilling/Alteration No Violations Noted
1244170 Primary Facility 2003-06-16 Drilling/Alteration No Violations Noted
1270746 Primary Facility 2003-09-15 Administrative/File Review No Violations Noted well record review
2588110 Primary Facility 2017-04-27 Routine/Partial Inspection No Violations Noted

For data sources see[7]

References