X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-083-52685"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-083-52685
 
| Well ID: 37-083-52685
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.675384, -78.816877 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.675384, -78.816877 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/23/2008
+
| Spud Date: 2008-07-23
 
|-
 
|-
| Permit Date: 11/9/2007
+
| Permit Date: 2007-11-09
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 67: Line 92:
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 85: Line 110:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 94: Line 119:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 148: Line 173:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 165: Line 190:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 7.60 Bbl
 
| style="text-align: right;" | 7.60 Bbl
Line 171: Line 196:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 78.30 Bbl
 
| style="text-align: right;" | 78.30 Bbl
Line 177: Line 202:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 69.80 Bbl
 
| style="text-align: right;" | 69.80 Bbl
Line 183: Line 208:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 450.59 Bbl
 
| style="text-align: right;" | 450.59 Bbl
Line 189: Line 214:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2016-0
+
| 2016-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 19.00 Bbl
 
| style="text-align: right;" | 19.00 Bbl
Line 195: Line 220:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
Line 201: Line 226:
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
Line 207: Line 232:
 
|  
 
|  
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1.61 Bbl
 
| style="text-align: right;" | 1.61 Bbl
Line 213: Line 238:
 
| PA0023213
 
| PA0023213
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 11.94 Bbl
 
| style="text-align: right;" | 11.94 Bbl
Line 238: Line 263:
 
| 2070243
 
| 2070243
 
| Primary Facility
 
| Primary Facility
| 05/16/2012
+
| 2012-05-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 245: Line 270:
 
| 2146077
 
| 2146077
 
| Primary Facility
 
| Primary Facility
| 03/05/2013
+
| 2013-03-05
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 287: Line 312:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 04:51, 26 July 2019

Well Details

Well ID: 37-083-52685
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Wetmore Township
Operator Name: BULL RUN RESOURCES LLC
Well Pad ID:
Farm/Lease Name: CAMPBELL C8
License Status: Active
Spud Date: 2008-07-23
Permit Date: 2007-11-09
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.675384
Longitude: -78.816877

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 CATALYST ENERGY INC 27.68 90 14.76 90 0.00 0
2009 0.00 0 0.00 0 0.00 0
2010 CATALYST ENERGY INC 798.70 365 90.40 365 0.00 0
2011 CATALYST ENERGY INC 795.90 365 91.90 365 0.00 0
2012 CATALYST ENERGY INC 933.33 366 84.56 366 44.44 366
2014 CATALYST ENERGY INC 345.40 365 42.80 365 21.02 365
2015 CATALYST ENERGY INC 181.30 182 30.34 182 4.80 182
2016 CATALYST ENERGY INC 29.00 31 15.31 31 1.95 31
2017 CATALYST ENERGY INC 19.40 365 15.08 365 0.85 365
2018 BULL RUN RESOURCES LLC 89.77 180 9.23 365 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A00 Produced Fluid (in Barrels) 7.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-A00 Produced Fluid (in Barrels) 78.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011-A00 Produced Fluid (in Barrels) 69.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014-A00 Produced Fluid (in Barrels) 450.59 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016-A00 Produced Fluid (in Barrels) RWC 802 19.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2017-A00 Produced Fluid (in Barrels) RWC 802 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-A00 Produced Fluid (in Barrels) RWC 802 20.00 Bbl ROAD SPREADING
2018-A00 Produced Fluid (in Barrels) RWC 802 1.61 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018-A00 Produced Fluid (in Barrels) RWC 802 11.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2070243 Primary Facility 2012-05-16 Routine/Complete Inspection No Violations Noted
2146077 Primary Facility 2013-03-05 Routine/Complete Inspection No Violations Noted
2465202 Primary Facility 2016-03-03 Routine/Complete Inspection No Violations Noted

For data sources see[6]

References