X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-083-51860"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-083-51860
 
| Well ID: 37-083-51860
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.675350, -78.836939 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.675350, -78.836939 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: POWELL TRACT 344 21
 
| Farm/Lease Name: POWELL TRACT 344 21
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2007-03-12
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2006-12-06
 
| Permit Date: 2006-12-06
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.675350
 
| Latitude: 41.675350
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-12-06
 +
| New Permit Application
 +
|-
 +
| 2007-03-12
 +
| Performed Spud Operation
 +
|-
 +
| 2007-03-15
 +
| Drilling Completion
 +
|-
 +
| 2008-04-28
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 98:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 125:
 
| 2008
 
| 2008
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 2,131.67
+
| style="text-align: right;" | 19185
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 658.67
+
| style="text-align: right;" | 5928
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 134:
 
| 2009
 
| 2009
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 15,078.00
+
| style="text-align: right;" | 15078.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 1,752.00
+
| style="text-align: right;" | 1752.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 143:
 
| 2010
 
| 2010
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 815.50
+
| style="text-align: right;" | 815.5
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 116.83
 
| style="text-align: right;" | 116.83
Line 141: Line 179:
 
| 2015
 
| 2015
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 196.20
+
| style="text-align: right;" | 196.2
 
| style="text-align: right;" | 182
 
| style="text-align: right;" | 182
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 214: Line 252:
 
| 2010
 
| 2010
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 139.67 Bbl
 
| style="text-align: right;" | 139.67 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 221: Line 259:
 
| 2010
 
| 2010
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 379.50 Bbl
 
| style="text-align: right;" | 379.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 228: Line 266:
 
| 2011
 
| 2011
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 43.64 Bbl
 
| style="text-align: right;" | 43.64 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 235: Line 273:
 
| 2011
 
| 2011
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 345.36 Bbl
 
| style="text-align: right;" | 345.36 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 242: Line 280:
 
| 2012
 
| 2012
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 249.09 Bbl
 
| style="text-align: right;" | 249.09 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 249: Line 287:
 
| 2014
 
| 2014
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 181.58 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 +
|-
 +
| 2014
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 181.58 Bbl
 
| style="text-align: right;" | 181.58 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 60.93 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 60.93 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0102784
 
| PA0102784
Line 256: Line 315:
 
| 2016
 
| 2016
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 6.67 Bbl
 
| style="text-align: right;" | 6.67 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 263: Line 322:
 
| 2016
 
| 2016
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 6.67 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 16.67 Bbl
 
| style="text-align: right;" | 16.67 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
Line 270: Line 336:
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 12.43 Bbl
+
| style="text-align: right;" | 133.86 Bbl
| PUBLIC SEWAGE TREATMENT PLANT
+
| RESIDUAL WASTE PROCESSING FACILITY
| PA0023213
+
| WMGR123NW005
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 11.11 Bbl
 
| style="text-align: right;" | 11.11 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
Line 284: Line 350:
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 133.86 Bbl
+
| style="text-align: right;" | 12.43 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| PUBLIC SEWAGE TREATMENT PLANT
| WMGR123NW005
+
| PA0023213
 +
|-
 +
| 2018
 +
| [[BULL RUN RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 60.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[BULL RUN RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2.22 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[BULL RUN RESOURCES LLC]]
 
| [[BULL RUN RESOURCES LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 9.44 Bbl
 
| style="text-align: right;" | 9.44 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2018
+
| 2019
 
| [[BULL RUN RESOURCES LLC]]
 
| [[BULL RUN RESOURCES LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 60.00 Bbl
+
| style="text-align: right;" | 22.22 Bbl
| PUBLIC SEWAGE TREATMENT PLANT
+
| REUSE AT A CONVENTIONAL WELL SITE IN PA
| PA0023213
+
|  
 
|-
 
|-
| 2018
+
| 2019
 
| [[BULL RUN RESOURCES LLC]]
 
| [[BULL RUN RESOURCES LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 2.22 Bbl
 
| style="text-align: right;" | 2.22 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D215BWAR
 
| PAS2D215BWAR
 +
|-
 +
| 2019
 +
| [[BULL RUN RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30.89 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 
|-
 
|-
 
|}
 
|}

Latest revision as of 16:21, 14 May 2020

Well Details

Well ID: 37-083-51860
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Wetmore Township
Operator Name: BULL RUN RESOURCES LLC
Well Pad ID:
Farm/Lease Name: POWELL TRACT 344 21
License Status: ACTIVE
Spud Date:
Permit Date: 2006-12-06
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.675350
Longitude: -78.836939

For data sources see[1][2][3]

Well History

Date Event
2006-12-06 New Permit Application
2007-03-12 Performed Spud Operation
2007-03-15 Drilling Completion
2008-04-28 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 CATALYST ENERGY INC 19185 365 5928 365 0.00 0
2009 CATALYST ENERGY INC 15078.00 365 1752.00 365 0.00 0
2010 CATALYST ENERGY INC 815.5 365 116.83 365 0.00 0
2011 CATALYST ENERGY INC 721.00 365 95.73 365 0.00 0
2012 CATALYST ENERGY INC 711.82 366 79.55 366 249.09 366
2014 CATALYST ENERGY INC 359.86 365 45.00 365 19.25 365
2015 CATALYST ENERGY INC 196.2 182 0.00 0 3.85 182
2016 CATALYST ENERGY INC 17.56 31 0.00 0 1.21 31
2017 CATALYST ENERGY INC 0.00 0 65.98 365 0.00 0
2018 BULL RUN RESOURCES LLC 94.22 180 25.71 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 CATALYST ENERGY INC Brine 8,000.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2008 CATALYST ENERGY INC Brine 400.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009 CATALYST ENERGY INC Brine 1,108.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 CATALYST ENERGY INC Produced Fluid 139.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2010 CATALYST ENERGY INC Produced Fluid 379.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CATALYST ENERGY INC Produced Fluid 43.64 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CATALYST ENERGY INC Produced Fluid 345.36 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012 CATALYST ENERGY INC Produced Fluid 249.09 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 181.58 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 181.58 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 60.93 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 60.93 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016 CATALYST ENERGY INC Produced Fluid 6.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016 CATALYST ENERGY INC Produced Fluid 6.67 Bbl CENT WASTE TRT FAC NPDES PA0102784
2016 CATALYST ENERGY INC Produced Fluid 16.67 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 133.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 CATALYST ENERGY INC Produced Fluid 11.11 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 12.43 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 BULL RUN RESOURCES LLC Produced Fluid 60.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 BULL RUN RESOURCES LLC Produced Fluid 2.22 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 BULL RUN RESOURCES LLC Produced Fluid 9.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 BULL RUN RESOURCES LLC Produced Fluid 22.22 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2019 BULL RUN RESOURCES LLC Produced Fluid 2.22 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 BULL RUN RESOURCES LLC Produced Fluid 30.89 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1609530 Primary Facility 2007-03-20 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References