X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-065-25280"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-065-25280
 
| Well ID: 37-065-25280
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.930944, -79.132699 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.930944, -79.132699 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: MCGREGOR 1
 
| Farm/Lease Name: MCGREGOR 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2005-06-21
+
| Spud Date: 2005-06-22
 
|-
 
|-
 
| Permit Date: 2005-05-09
 
| Permit Date: 2005-05-09
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.930944
 
| Latitude: 40.930944
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2005-05-09
 +
| New Permit Application
 +
|-
 +
| 2005-06-21
 +
| Performed Spud Operation
 +
|-
 +
| 2005-06-25
 +
| Drilling Completion
 +
|-
 +
| 2005-06-30
 +
| Perforation
 +
|-
 +
| 2005-11-21
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2005
 
| 2005
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| style="text-align: right;" | 8,686.00
+
| style="text-align: right;" | 8686
 
| style="text-align: right;" | 56
 
| style="text-align: right;" | 56
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 146:
 
| 2007
 
| 2007
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| style="text-align: right;" | 22,661.00
+
| style="text-align: right;" | 22661.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 114: Line 155:
 
| 2008
 
| 2008
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| style="text-align: right;" | 14,320.00
+
| style="text-align: right;" | 14320.00
 
| style="text-align: right;" | 284
 
| style="text-align: right;" | 284
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 123: Line 164:
 
| 2009
 
| 2009
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| style="text-align: right;" | 13,725.00
+
| style="text-align: right;" | 13725.00
 
| style="text-align: right;" | 348
 
| style="text-align: right;" | 348
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 206: Line 247:
 
| style="text-align: right;" | 5,621.00
 
| style="text-align: right;" | 5,621.00
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 354
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[JR RESOURCES LP]]
 +
| style="text-align: right;" | 5,660.00
 +
| style="text-align: right;" | 361
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 264: Line 314:
 
| 2010
 
| 2010
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 271: Line 321:
 
| 2011
 
| 2011
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 35.00 Bbl
 
| style="text-align: right;" | 35.00 Bbl
 
| Road Spreading
 
| Road Spreading
Line 278: Line 328:
 
| 2012
 
| 2012
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 285: Line 335:
 
| 2013
 
| 2013
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0020346
 
| PA0020346
 +
|-
 +
| 2015
 +
| [[JR RESOURCES LP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0028428
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[JR RESOURCES LP]]
 
| [[JR RESOURCES LP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT

Latest revision as of 19:10, 16 May 2020

Well Details

Well ID: 37-065-25280
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: Porter Township
Operator Name: JR RESOURCES LP
Well Pad ID:
Farm/Lease Name: MCGREGOR 1
License Status: ACTIVE
Spud Date: 2005-06-22
Permit Date: 2005-05-09
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.930944
Longitude: -79.132699

For data sources see[1][2][3]

Well History

Date Event
2005-05-09 New Permit Application
2005-06-21 Performed Spud Operation
2005-06-25 Drilling Completion
2005-06-30 Perforation
2005-11-21 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2005 JR RESOURCES LP 8686 56 0.00 0 0.00 0
2006 JR RESOURCES LP 34,005.00 365 0.00 0 0.00 0
2007 JR RESOURCES LP 22661.00 365 0.00 0 0.00 0
2008 JR RESOURCES LP 14320.00 284 0.00 0 0.00 0
2009 JR RESOURCES LP 13725.00 348 0.00 0 0.00 0
2010 JR RESOURCES LP 11,598.00 360 0.00 0 0.00 0
2011 JR RESOURCES LP 10,701.00 362 0.00 0 0.00 0
2012 JR RESOURCES LP 9,720.00 353 0.00 0 0.00 0
2013 JR RESOURCES LP 7,908.00 349 0.00 0 0.00 0
2014 JR RESOURCES LP 7,488.00 356 0.00 0 0.00 0
2015 JR RESOURCES LP 6,892.00 347 0.00 0 0.00 0
2016 JR RESOURCES LP 6,470.00 363 0.00 0 0.00 0
2017 JR RESOURCES LP 6,584.00 358 0.00 0 0.00 0
2018 JR RESOURCES LP 5,621.00 354 0.00 0 0.00 0
2019 JR RESOURCES LP 5,660.00 361 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2005 JR RESOURCES LP Brine 80.00 Bbl Municipal Sewage Treatment Plant PA0095443
2006 JR RESOURCES LP Brine 80.00 Bbl Road Spreading
2006 JR RESOURCES LP Brine 160.00 Bbl Municipal Sewage Treatment Plant PARW00000008
2008 JR RESOURCES LP Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2009 JR RESOURCES LP Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt
2010 JR RESOURCES LP Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2011 JR RESOURCES LP Produced Fluid 35.00 Bbl Road Spreading
2012 JR RESOURCES LP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2013 JR RESOURCES LP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2015 JR RESOURCES LP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2017 JR RESOURCES LP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1450911 Primary Facility 2005-05-24 Drilling/Alteration No Violations Noted
1458423 Primary Facility 2005-06-21 Drilling/Alteration No Violations Noted
1459693 Primary Facility 2005-06-27 Drilling/Alteration No Violations Noted
2739838 Primary Facility 2018-06-11 Routine/Complete Inspection No Violations Noted This well was drilled in an agricultural area off of Dinger Road in June 2005. No violations were noted during this inspection.

For data sources see[7]

References