X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885122608000

Well Details

Well ID: 0885122608000
Loading map...
Location: 00/08-26-088-12W5/0
Location Alias: 00/08-26-88-12 W5M
Location Alias 2: 00/08-26-088-12 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 26
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 8-26-88-12
Operator Name: Surge Energy Inc.
License Number: 0436729
License Date: 2011-09-12
License Status: Amended
Spud Date: 2012-02-28
Final Drill Date: 2012-03-13
Well Total Depth: 3199.00 m
Surface Hole Latitude: 56.659050
Surface Hole Longitude: -115.813197

For data sources see[1][2]

Well History

Date Event
2011-09-12 Obtained License
2012-03-02 Surface Casing Operation Performed
2012-03-04 Lost Circulation Occurred
2012-03-05 Well Log Performed
2012-03-06 Direction Drilling Operation Performed - Deviate
2012-03-07 Direction Drilling Operation Performed - Horizontal
2012-03-07 Well Log Performed
2012-03-09 Intermediate Casing Operation Performed
2012-03-10 Well Log Performed
2012-03-13 Finished Drilling
2012-03-13 Well Log Performed
2012-03-13 Well Structure changed to Drain
2012-03-16 Liner Casing Operation Performed
2012-03-25 Rig Released
2012-04-04 Well Log Performed
2012-05-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-24 Perforation Treatment Performed - Open-Hole Completion
2012-05-25 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-28 Precision Drilling Corporation 186 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-06 1330.00 Deviate (5 - 79 degrees)
2012-03-07 1680.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-24 Open Hole/Barefoot Completion 3191.20 3199.00 0
2012-05-24 Multi-Stage Fracture 3162.10 3162.20 0
2012-05-24 Multi-Stage Fracture 3092.50 3092.60 0
2012-05-24 Multi-Stage Fracture 3036.00 3036.10 0
2012-05-24 Multi-Stage Fracture 2966.20 2966.30 0
2012-05-24 Multi-Stage Fracture 2896.20 2896.30 0
2012-05-24 Multi-Stage Fracture 2839.90 2840.00 0
2012-05-24 Multi-Stage Fracture 2769.90 2770.00 0
2012-05-24 Multi-Stage Fracture 2713.40 2713.50 0
2012-05-24 Multi-Stage Fracture 2643.50 2643.60 0
2012-05-24 Multi-Stage Fracture 2573.60 2573.70 0
2012-05-24 Multi-Stage Fracture 2517.20 2517.30 0
2012-05-24 Multi-Stage Fracture 2447.20 2447.30 0
2012-05-25 Multi-Stage Fracture 2377.20 2377.30 0
2012-05-25 Multi-Stage Fracture 2321.10 2321.20 0
2012-05-25 Multi-Stage Fracture 2251.40 2251.50 0
2012-05-25 Multi-Stage Fracture 2181.50 2181.60 0
2012-05-25 Multi-Stage Fracture 2125.00 2125.10 0
2012-05-25 Multi-Stage Fracture 2055.10 2055.20 0
2012-05-25 Multi-Stage Fracture 1998.60 1998.70 0

For data sources see[6]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-04 Lost Circulation 823.00 823.00
2012-06-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References