X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-36846"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-36846
 
| Well ID: 37-063-36846
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.499277, -79.068333 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.499278, -79.068333 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Indiana County, Pennsylvania|Indiana]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Brush Valley Township, Indiana County, Pennsylvania|Brush Valley Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Indiana_County,_Pennsylvania|Indiana]]
 +
|-
 +
| Municipality: [[Brush Valley Township,_Indiana_County,_Pennsylvania|Brush Valley Township]]
 
|-
 
|-
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[148232|148232]]
+
| Well Pad ID: [[148232]]
 
|-
 
|-
 
| Farm/Lease Name: DICK 1H
 
| Farm/Lease Name: DICK 1H
 
|-
 
|-
| First Permit Date: 2010-04-30
+
| License Status: Plugged OG Well
 
|-
 
|-
| Last Permit Date: 2010-04-30
+
| Spud Date: 01/28/2011
 
|-
 
|-
| Spud Date: 2011-01-28
+
| Permit Date: 4/30/2010
 
|-
 
|-
| Unconventional: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Horizontal: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Well Status: ACTIVE
+
| Latitude: 40.499278
|-
 
| Violations: 0
 
|-
 
| Latitude: 40.499277
 
 
|-
 
|-
 
| Longitude: -79.068333
 
| Longitude: -79.068333
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2010-3
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2010
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2011
| style="text-align:right;" | 0.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
| 2013
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| 2015
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-2
+
| 2017
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" | 0
|-
 
| 2014-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-02
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 352.47
+
| style="text-align: right;" | 352.47 Tons
| Tons
+
| LANDFILL
 +
| 100172
 +
|-
 +
| 2016-2
 +
| Fracturing Fluid Waste (in Barrels) RWC 805
 +
| style="text-align: right;" | 415.02 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016-2
 +
| Fracturing Fluid Waste (in Barrels) RWC 805
 +
| style="text-align: right;" | 110.01 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW001
 +
|-
 +
| 2016-2
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 4.64 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100172
 
| 100172
| ARDEN LANDFILL
 
| WASHINGTON
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1942800
 
| 1942800
| 2011-01-14
+
| Primary Facility
 +
| 01/14/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Id sign ok. Site constructed. Location staked. No open pits. Site snow covered but no apparent problems.
 
| Id sign ok. Site constructed. Location staked. No open pits. Site snow covered but no apparent problems.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1944402
 
| 1944402
| 2011-01-20
+
| Primary Facility
 +
| 01/20/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Marcellus well.  Conductor pipe set.  Site ID sign in place.  E&S plan on site.  Setting up drilling equipment at time of inspection.  
+
| Marcellus well.  Conductor pipe set.  Site ID sign in place.  E&S plan on site.  Setting up drilling equipment at time of inspection.
Approved ESCGP-1 permit on site.  Technical review of ESCGP-1 completed.
 
Site and access road snow covered at time of inspection, although no obvious signs of accelerated erosion were found leaving access road or well site.  Appeared as though all BMP's were in place in accordance with E&S plan, and were properly maintained.  Minor E&S issue discussed with operator representative Matt Barch, and addressed through compliance assistance in technical inspection of ESCGP-1 plan.  No drill pit constructed on site (closed loop system to be utilized).  No frac pit constructed yet.  No violations found.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1944598
 
| 1944598
| 2011-01-19
+
| Primary Facility
 +
| 01/19/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1946175
 
| 1946175
| 2011-01-25
+
| Primary Facility
 +
| 01/25/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1947172
 
| 1947172
| 2011-01-28
+
| Primary Facility
 +
| 01/28/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Marcellus well.  Conductor pipe set.  Site ID sign in place.  E&S plan on site.  Drilling rig in place.  
+
| Marcellus well.  Conductor pipe set.  Site ID sign in place.  E&S plan on site.  Drilling rig in place.
Approved ESCGP-1 permit on site.  Technical review of ESCGP-1 completed.
 
Site and access road snow covered at time of inspection, although no obvious signs of accelerated erosion were found leaving access road or well site.  Appeared as though all BMP's were in place in accordance with E&S plan, and were properly maintained.
 
No drill pit constructed on site (closed loop system to be utilized).  No frac pit constructed yet.  No violations found.
 
No signs of any spills or discharges.  No E&S issues found.  No violations found.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1947871
 
| 1947871
| 2011-02-04
+
| Primary Facility
 +
| 02/04/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1947880
 
| 1947880
| 2011-02-02
+
| Primary Facility
 +
| 02/02/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1950400
 
| 1950400
| 2011-02-15
+
| Primary Facility
 +
| 02/15/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Marcellus well.  Site ID sign in place.  E&S plan on site.  BJ service company on site for cementing.  
+
| Marcellus well.  Site ID sign in place.  E&S plan on site.  BJ service company on site for cementing.
Approved ESCGP-1 permit on site.  Technical review of ESCGP-1 completed.
 
Site and access road snow covered at time of inspection, although no obvious signs of accelerated erosion were found leaving access road or well site.  Appeared as though all BMP's were in place in accordance with E&S plan, and were properly maintained.
 
Drill cuttings and fluids being contained in above ground tanks  (closed loop system being used).  No frac pit constructed. 
 
No violations found.  No signs of any spills or discharges.  No E&S issues found.  No violations found.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1953155
 
| 1953155
| 2011-02-24
+
| Primary Facility
 +
| 02/24/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1955295
 
| 1955295
| 2011-03-02
+
| Primary Facility
 +
| 03/02/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Marcellus well.  Site ID sign in place.  E&S plan on site.  Drilling taking place at time of inspection.  
+
| Marcellus well.  Site ID sign in place.  E&S plan on site.  Drilling taking place at time of inspection.
Approved ESCGP-1 permit on site.  Technical review of ESCGP-1 completed.
 
Drill cuttings and fluids being contained in above ground tanks  (closed loop system being used).  No frac pit constructed.
 
Access road was stabilized with rock.  Rock installed in all ditch lines, and culvert outlets.  No signs of accelerated erosion on roadway.
 
BMP's installed on site in accordance with E&S plan.
 
*  Some minor repairs are needed to the BMP's, in particular to the sediment trap on the far side of the site.  This was discussed with on-site   
 
    company representative Don Henson, as well as company rep Matt Barch.  Both indicated the concerns would be immediately
 
    addressed.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1956869
 
| 1956869
| 2011-03-09
+
| Primary Facility
 +
| 03/09/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Marcellus well.  Site ID sign in place.  E&S plan on site.  Drilling completed, currently drilling second well on same pad.  
+
| Marcellus well.  Site ID sign in place.  E&S plan on site.  Drilling completed, currently drilling second well on same pad.
Approved ESCGP-1 permit on site.  Technical review of ESCGP-1 completed.
 
Access road was stabilized with rock.  Rock installed in all ditch lines, and culvert outlets.  No signs of accelerated erosion on roadway.
 
BMP's installed on site in accordance with E&S plan, and adequately maintained. 
 
Site is stabilized with rock.  Perimeter of site seeded/mulched, and erosion blankets installed.
 
Minor repairs have been completed to the sediment trap on the far side of the site in response to compliance assistance inspection of 3/2/11.  Site is in compliance.  No E&S issues found.  No violations found.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1965133
 
| 1965133
| 2011-03-25
+
| Primary Facility
 +
| 03/25/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Marcellus well.  Site ID sign in place.  E&S plan on site.  Drilling recently completed.  Not equipped for production.  
+
| Marcellus well.  Site ID sign in place.  E&S plan on site.  Drilling recently completed.  Not equipped for production.
Approved ESCGP-1 permit on site.  Technical review of ESCGP-1 completed.
 
Access road was stabilized with rock.  Rock installed in all ditch lines, and culvert outlets.  No signs of accelerated erosion on roadway.
 
BMP's installed on site in accordance with E&S plan, and adequately maintained. 
 
Site is stabilized with rock.  Perimeter of site seeded/mulched, and erosion blankets installed.
 
No impoundments/pits on site.
 
No E&S issues found.  No violations found.  No ev idence of any spills or discharges.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1979929
 
| 1979929
| 2011-06-08
+
| Primary Facility
 +
| 06/08/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2047593
 
| 2047593
| 2012-03-02
+
| Primary Facility
 +
| 03/02/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2121806
 
| 2121806
| 2012-03-02
+
| Primary Facility
 +
| 03/02/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2126972
 
| 2126972
| 2012-12-06
+
| Primary Facility
 +
| 12/06/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, well sign, ES plan, and ESCGP-1 present. Access road stable. Well site gated.  Multi well pad. Site is surrounding by wire fence in order to prevent third party access. Drilling completed 2/24/11. Pad adequately rocked. Wells drilled, not yet fraced nor equipped for production.  Site is temporarily stabilized. No ES concerns noted.  Operator has plans to permanently restore well site March 2013, a letter has been submitted discussing restoration efforts and timeline to Alan Eichler Program Manager OG SWRO.  Hence prior arrangements for restoration to PCSM standards have been made no violations are currently noted; although operator should continue to closely monitor and maintain site and access road until final permanent restoration is achieved as outlined in memo. Department will be notified up commencemnt of final restoration activities. Chevron EHS personnel, Curtis Small, OGI Rick Hoover, and Environmental Trainee Samantha Foulk on site during inspection.
 
| At the time of inspection, well sign, ES plan, and ESCGP-1 present. Access road stable. Well site gated.  Multi well pad. Site is surrounding by wire fence in order to prevent third party access. Drilling completed 2/24/11. Pad adequately rocked. Wells drilled, not yet fraced nor equipped for production.  Site is temporarily stabilized. No ES concerns noted.  Operator has plans to permanently restore well site March 2013, a letter has been submitted discussing restoration efforts and timeline to Alan Eichler Program Manager OG SWRO.  Hence prior arrangements for restoration to PCSM standards have been made no violations are currently noted; although operator should continue to closely monitor and maintain site and access road until final permanent restoration is achieved as outlined in memo. Department will be notified up commencemnt of final restoration activities. Chevron EHS personnel, Curtis Small, OGI Rick Hoover, and Environmental Trainee Samantha Foulk on site during inspection.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2160134
 
| 2160134
| 2013-04-16
+
| Primary Facility
 +
| 04/16/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
| 2189111
 +
| Primary Facility
 +
| 07/15/2013
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Multi-well pad. Marcellus. At time of inspection, well 1H drilled, not yet equipped for production. Date of TD was 2/24/2011.
 
|-
 
|-
| 2189111
+
| 2248860
| 2013-07-15
+
| Primary Facility
 +
| 02/26/2014
 +
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
| Multi-well pad. Marcellus. At time of inspection, well 1H drilled, not yet equipped for production. Date of TD was 2/24/2011.
+
| Multi-well pad. Marcellus. Regulatory inactive status.
Site ID sign, E&S plan, PPC plan, ESCGP-1 all on-site. Site gated. Access road in good condition. Well site surrounded by chain-link fence to discourage third party access.
 
Pad stabilized, adequately rocked with vegetative growth observed. No accelerated erosion or sedimentation issues observed.
 
Wellhead surrounded by orange security fence. Well tag present, legible.
 
Poly tank on secondary containment, water accumulation noted. Department recommends Operator empty containment as per current regulations.
 
 
 
Spoke to Chevron rep Curtis Small via phone on 7/8/2013 who informed Department that ditch above well site filled in, not needed due to topography, on-site conditions, and vegetative stabilization. At time of inspection, no potential erosion or sedimentation issues were observed as a result of this alteration. Department rep Samantha Foulk field-approved this change to plan.
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 2267529
 +
| Primary Facility
 +
| 04/18/2014
 +
| Routine/Complete Inspection
 +
| In Compliance with Policy
 +
| Multi-well pad. Marcellus. Regulatory inactive status.
 
|-
 
|-
| 2248860
+
| 2401962
| 2014-02-26
+
| Primary Facility
 +
| 08/17/2015
 +
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Multi-well pad. Marcellus. Regulatory inactive status.
 
| Multi-well pad. Marcellus. Regulatory inactive status.
 
+
|-
RTPT. At time of inspection, well 1H drilled, not yet equipped for production. 2H also drilled, not yet equipped for production. According to records, drilling for 1H occurred 1/28/2011-2/24/2011.
+
| 2473069
+
| Primary Facility
Site ID sign present, in compliance with Act 9 standards. ERP, E&S plan, PPC plan, ESCGP-1, drilling permit all on-site. Site gated. Well site surrounded by fence to discourage third party access.
+
| 2016-03-31
+
| Routine/Partial Inspection
Wellhead surrounded by gate and orange security fence. Well tag present, legible. Poly tank on secondary containment, sound.
+
| In Compliance with Policy
 
+
| On-site inspection as requested by Operator representative Curtis Small to discuss requirements pursuant to well plugging.The Operator is planning to potentially plug the two wells (063-36846, 063-36976) located on this pad. Instead of restoring the site to approximate original contours in accordance with current regulations, the landowner wishes for the well pad and access road to remain as is. The Department recommends the landowner obtain an NPDES permit from the Indiana County Conservation District for this location upon plugging of the well. The Department recommends that the Operator provide a copy of this permit to the Department to document the transfer of responsibility for this location in lieu of restoring the site to approximate original contours.
Unable to adequately inspect access road and well site for erosion and sedimentation concerns due to snow-cover. Per previous agreement with Department, restoration activities were scheduled to commence March 30, 2013. A follow-up inspection will be conducted in the spring to ensure site is properly restored.
+
|-
|  
+
| 2525335
|  
+
| Primary Facility
|  
+
| 2016-09-26
 +
| Routine/Complete Inspection
 +
| In Compliance with Policy
 +
| Inspection conducted in response to Notice of Intent to Plug a Well received by Department on 8-17-16.
 +
At time of inspection no E&S issues observed on gated access road. Well pad rocked, no E&S issues.  
 +
It appears well plugging has not been completed. Well head has been removed however erected monument not yet installed. According to OGI J. Branan Operator intends to install monument week of 10-3-16.
 +
Two roll-off boxes on site. Brine tank on site.
 +
Because of incomplete plugging, Inspection being refered to OGI for follow up.
 +
|-
 +
| 2612841
 +
| Primary Facility
 +
| 2017-07-06
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| site reclaimed and plugged well
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 00:25, 15 July 2019

Well Details

Well ID: 37-063-36846
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Brush Valley Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148232
Farm/Lease Name: DICK 1H
License Status: Plugged OG Well
Spud Date: 01/28/2011
Permit Date: 4/30/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.499278
Longitude: -79.068333

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-1 Drill Cuttings (in Tons) 352.47 Tons LANDFILL 100172
2016-2 Fracturing Fluid Waste (in Barrels) RWC 805 415.02 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-2 Fracturing Fluid Waste (in Barrels) RWC 805 110.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016-2 Synthetic Liner Materials (in Tons) RWC 806 4.64 Tons LANDFILL 100172

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1942800 Primary Facility 01/14/2011 Routine/Complete Inspection No Violations Noted Id sign ok. Site constructed. Location staked. No open pits. Site snow covered but no apparent problems.
1944402 Primary Facility 01/20/2011 Routine/Complete Inspection No Violations Noted Marcellus well. Conductor pipe set. Site ID sign in place. E&S plan on site. Setting up drilling equipment at time of inspection.
1944598 Primary Facility 01/19/2011 Drilling/Alteration No Violations Noted
1946175 Primary Facility 01/25/2011 Drilling/Alteration No Violations Noted
1947172 Primary Facility 01/28/2011 Routine/Complete Inspection No Violations Noted Marcellus well. Conductor pipe set. Site ID sign in place. E&S plan on site. Drilling rig in place.
1947871 Primary Facility 02/04/2011 Drilling/Alteration No Violations Noted
1947880 Primary Facility 02/02/2011 Drilling/Alteration No Violations Noted
1950400 Primary Facility 02/15/2011 Routine/Complete Inspection No Violations Noted Marcellus well. Site ID sign in place. E&S plan on site. BJ service company on site for cementing.
1953155 Primary Facility 02/24/2011 Drilling/Alteration No Violations Noted
1955295 Primary Facility 03/02/2011 Routine/Complete Inspection No Violations Noted Marcellus well. Site ID sign in place. E&S plan on site. Drilling taking place at time of inspection.
1956869 Primary Facility 03/09/2011 Routine/Complete Inspection No Violations Noted Marcellus well. Site ID sign in place. E&S plan on site. Drilling completed, currently drilling second well on same pad.
1965133 Primary Facility 03/25/2011 Routine/Complete Inspection No Violations Noted Marcellus well. Site ID sign in place. E&S plan on site. Drilling recently completed. Not equipped for production.
1979929 Primary Facility 06/08/2011 Routine/Complete Inspection No Violations Noted
2047593 Primary Facility 03/02/2012 Routine/Complete Inspection No Violations Noted
2121806 Primary Facility 03/02/2012 Routine/Complete Inspection No Violations Noted
2126972 Primary Facility 12/06/2012 Routine/Complete Inspection No Violations Noted At the time of inspection, well sign, ES plan, and ESCGP-1 present. Access road stable. Well site gated. Multi well pad. Site is surrounding by wire fence in order to prevent third party access. Drilling completed 2/24/11. Pad adequately rocked. Wells drilled, not yet fraced nor equipped for production. Site is temporarily stabilized. No ES concerns noted. Operator has plans to permanently restore well site March 2013, a letter has been submitted discussing restoration efforts and timeline to Alan Eichler Program Manager OG SWRO. Hence prior arrangements for restoration to PCSM standards have been made no violations are currently noted; although operator should continue to closely monitor and maintain site and access road until final permanent restoration is achieved as outlined in memo. Department will be notified up commencemnt of final restoration activities. Chevron EHS personnel, Curtis Small, OGI Rick Hoover, and Environmental Trainee Samantha Foulk on site during inspection.
2160134 Primary Facility 04/16/2013 Routine/Complete Inspection No Violations Noted
2189111 Primary Facility 07/15/2013 Routine/Complete Inspection No Violations Noted Multi-well pad. Marcellus. At time of inspection, well 1H drilled, not yet equipped for production. Date of TD was 2/24/2011.
2248860 Primary Facility 02/26/2014 Routine/Partial Inspection No Violations Noted Multi-well pad. Marcellus. Regulatory inactive status.
2267529 Primary Facility 04/18/2014 Routine/Complete Inspection In Compliance with Policy Multi-well pad. Marcellus. Regulatory inactive status.
2401962 Primary Facility 08/17/2015 Routine/Partial Inspection No Violations Noted Multi-well pad. Marcellus. Regulatory inactive status.
2473069 Primary Facility 2016-03-31 Routine/Partial Inspection In Compliance with Policy On-site inspection as requested by Operator representative Curtis Small to discuss requirements pursuant to well plugging.The Operator is planning to potentially plug the two wells (063-36846, 063-36976) located on this pad. Instead of restoring the site to approximate original contours in accordance with current regulations, the landowner wishes for the well pad and access road to remain as is. The Department recommends the landowner obtain an NPDES permit from the Indiana County Conservation District for this location upon plugging of the well. The Department recommends that the Operator provide a copy of this permit to the Department to document the transfer of responsibility for this location in lieu of restoring the site to approximate original contours.
2525335 Primary Facility 2016-09-26 Routine/Complete Inspection In Compliance with Policy Inspection conducted in response to Notice of Intent to Plug a Well received by Department on 8-17-16.

At time of inspection no E&S issues observed on gated access road. Well pad rocked, no E&S issues. It appears well plugging has not been completed. Well head has been removed however erected monument not yet installed. According to OGI J. Branan Operator intends to install monument week of 10-3-16. Two roll-off boxes on site. Brine tank on site. Because of incomplete plugging, Inspection being refered to OGI for follow up.

2612841 Primary Facility 2017-07-06 Routine/Complete Inspection No Violations Noted site reclaimed and plugged well

For data sources see[6]

References