X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-36434"

m
m
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-36434
 
| Well ID: 37-063-36434
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.510643, -79.186638 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.510643, -79.186639 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 
|-
 
|-
| County: [[Indiana County, Pennsylvania|Indiana]]
+
| County: [[Indiana_County,_Pennsylvania|Indiana]]
 
|-
 
|-
| Municipality: [[Center Township, Indiana County, Pennsylvania|Center Township]]
+
| Municipality: [[Center Township,_Indiana_County,_Pennsylvania|Center Township]]
 
|-
 
|-
| Operator Name: [[XTO ENERGY INC|XTO ENERGY INC]]
+
| Operator Name: [[XTO ENERGY INC]]
 
|-
 
|-
 
| Well Pad ID: [[147585]]
 
| Well Pad ID: [[147585]]
Line 14: Line 19:
 
| Farm/Lease Name: HOMER CITY POWER PLANT 8422H
 
| Farm/Lease Name: HOMER CITY POWER PLANT 8422H
 
|-
 
|-
| First Permit Date: 2009-02-09
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2009-02-09
+
| Spud Date: 2009-09-11
 
|-
 
|-
| Spud Date: 2009-09-11
+
| Permit Date: 2009-02-09
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: 2
+
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.510643
 
| Latitude: 40.510643
 
|-
 
|-
| Longitude: -79.186638
+
| Longitude: -79.186639
|-
 
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Inspection Data ==
+
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Date
!scope="col" | DATE
+
!scope="col" | Event
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
 
|-
 
|-
| 1835933
+
| 2009-02-09
| 2009-10-01
+
| New Permit Application
| No Violations Noted
 
| MARCELLUS - drilling @ 7,237ft/E&S ok/ID&pit ok
 
|  
 
 
|-
 
|-
 +
| 2009-09-11
 +
| Performed Spud Operation
 
|-
 
|-
| 1840492
+
| 2009-10-25
| 2009-10-27
+
| Drilling Completion
| No Violations Noted
 
| Marcellus well.  Drilling crew rigging down and removing equipment at time of inspection.  Well head only on site.
 
Site ID sign in place.  E&S plan on site.
 
Access road is stabilized with rock.  No signs of accelerated erosion on access road.  Access road entrance is rocked.
 
No signs of accelerated erosion leaving well site.
 
Frac pit appeared sound with proper compaction, embankment width, slopes, freeboard, etc..
 
Drill pit appeared sound.  Freeboard was nearing the minimum 2' allowed.  Contacted operator representative Ben Kissel about this as well as on-site personnell.
 
Additional BMP's need to be installed in order to prevent any erosion/sedimentation issues, as reflected on the E&S plan on site.  Spoke to Mr. Kissel about this who then requested an on site meeting
 
 
 
|
 
 
|-
 
|-
 +
| 2009-12-10
 +
| Perforation
 
|-
 
|-
| 1840500
+
| 2011-01-24
| 2009-10-28
+
| DEVIATED
| No Violations Noted
 
| Marcellus well.  Drilling crew rigging down and removing equipment at time of inspection.  Well head only on site.
 
Site ID sign in place.  E&S plan on site.  Access road, site, and pits ok.
 
Inspection conducted with operator representative Ben Kissel, site construction manager, and consultants in order to address concerns found during the inspection of this site on 10/27/09.
 
Fluids had been removed from the drill pit to ensure 2' freeboard.
 
Discussed additional BMP's needed to be installed in order to prevent any erosion/sedimentation issues, and to reflect the E&S plan on site.  Mr. Kissel indicated that additional BMP's would be installed.  Please contact this office upon completion.
 
 
 
|  
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 1943220
+
|}-->
| 2011-01-03
+
<!--==== Fluid Composition Data ====
| Violation(s) Noted
+
{| class="wikitable sortable" width="95%"
| Marcellus well.  Well is equipped for production.  Drilling completed 10/25/2009.
+
!scope="col" | Job Number
Site ID sign and well tag in place.  ESCGP-1 approval, permit and E&S plan on site.
+
!scope="col" | Trade Name
Access road was stabilized, with no signs of accelerated erosion.
+
!scope="col" | Supplier
Inspection revealed the following deficiencies:
+
!scope="col" | Purpose
  1) Failure to restore site and impoundment within 9 months of completion of drilling.  Large impoundment on site has not been backfilled and restored. Not permitted as centralized impoundment. Many disturbed areas around the site and production equipment are not vegetated.  Rock pad is sediment laden, and does not appear to be constructed of durable rock. 2) Failure to minize accelerated erosion, implement and maintain E&S controls, and stabilize site.  Nearly all of the silt fence that was installed is collapsed. Some of the BMP's shown on ESCGP-1 were not installed. Evidence of erosion/sedimentation found on banks and around equipment. Impoundment fluids must be removed and properly disposed of. Site, pad, impoundment must be properly restored.  Temporary BMP's mainta
+
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
  
| 603070
+
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
|-
+
|}-->
| 1943220
 
| 2011-01-03
 
| Violation(s) Noted
 
| Marcellus well.  Well is equipped for production.  Drilling completed 10/25/2009.
 
Site ID sign and well tag in place.  ESCGP-1 approval, permit and E&S plan on site.
 
Access road was stabilized, with no signs of accelerated erosion.
 
Inspection revealed the following deficiencies:
 
  1)  Failure to restore site and impoundment within 9 months of completion of drilling.  Large impoundment on site has not been backfilled and restored. Not permitted as centralized impoundment. Many disturbed areas around the site and production equipment are not vegetated.  Rock pad is sediment laden, and does not appear to be constructed of durable rock. 2) Failure to minize accelerated erosion, implement and maintain E&S controls, and stabilize site.  Nearly all of the silt fence that was installed is collapsed. Some of the BMP's shown on ESCGP-1 were not installed. Evidence of erosion/sedimentation found on banks and around equipment. Impoundment fluids must be removed and properly disposed of. Site, pad, impoundment must be properly restored.  Temporary BMP's mainta
 
  
| 603071
+
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
 +
| 2009
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2043141
+
| 2010
| 2012-02-02
+
| [[XTO ENERGY INC]]
| Outstanding Violations - No Viols Req'd
+
| style="text-align: right;" | 168,445.50
| During this inspection, well drilled and equipped for prodcution. Well sign ES plan present. According to records drilling completed on 10/25/09. Prevoius violations issed on 1/03/11 by WQS Curtis Small for failure to restore site and impoundment within nine months of completion of drilling.  At the time of this inspection, "frac pond" still located on well site and currently full of water. Line of "frac pond" appears structurally compromised with various holes. Site has been seeded/mulch with minimal growth, does not appear to be at least 70% unfiorm vegeatative cover. Share access road, could be maintained as mud and rutting apepars to be a concern. Minor E/S issues noted on site due to lack of vegettative stabilization. No temporary bmp's observed. 
+
| style="text-align: right;" | 273
 
+
| style="text-align: right;" | 0.00
Department is requested written response on  what restoration efforts are being planned for i"frac pond" as well as time of when these events will commence.  
+
| style="text-align: right;" | 0
 
+
| style="text-align: right;" | 0.00
During this inspection, no new violations noted previously issued violations ongoing.
+
| style="text-align: right;" | 0
 
 
|  
 
 
|-
 
|-
 +
| 2011
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 159,996.00
 +
| style="text-align: right;" | 363
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2071675
+
| 2012
| 2012-05-09
+
| [[XTO ENERGY INC]]
| Outstanding Violations - No Viols Req'd
+
| style="text-align: right;" | 132,232.00
| During this inspection, well drilled and equipped for production. Well sign ES plan present. Two brine tanks located onsite located with metal secondary containment. Site has been seeded/mulch with growth.No accelerated erosion or sedimentation concerns noted at this time. According to records drilling completed on 10/25/09.  At the time of this inspection, "frac pond" still located on well site and currently full of water. Liner of "frac pond"  appears to have been repaired since last inspection- holes appear to have been patched.  Since last inspection department noted settling of "sandy" material-possibly indicating flowback material??? Operator claims pit is being used for freshwater only. Department has a meeting planned for May 11 with operator to discuss outstanding violations at this location.  Department had requested written response on what restoration efforts are being planned for i"frac pond" as well as time of when these events will commence. Dept requesting sample anlaysis and disposal records for materials disposed of from this site
+
| style="text-align: right;" | 366
|  
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 121,082.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2089729
+
| 2014
| 2012-08-01
+
| [[XTO ENERGY INC]]
| Outstanding Violations - No Viols Req'd
+
| style="text-align: right;" | 91,078.00
| At the time of this inspection, well ID sign, ES plan, ESCGP-1 present. Inspection follow up on reclamation and relining of impoundment as per agreement with department. Impoundment currently lined with minimal fluid, as operator actively pumping fluids out and hauling off site to an approval facility. Six roll off boxes located onsite in preparation for removal of impoundment liner and any contaminants that may have entered grounds of the commonwealth due to structural deficiencies in liner.  At the time of this inspection, no new violations noted. A follow up inspection will be conducted when liner has been successfully removed and samples collected prior to relining impoundment for re-use as freshwater impoundment
+
| style="text-align: right;" | 365
 
+
| style="text-align: right;" | 0.00
NO NEW VIOLS, OUSTANDING VIOLS EXIST B/C IMPOUNDMENT NOT YET RELINED AS PER (WRITTEN) AGREEMENT BTW OPR AND DEPT
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 94,462.00
 +
| style="text-align: right;" | 261
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2090948
+
| 2016
| 2012-08-01
+
| [[XTO ENERGY INC]]
| No Violations Noted
+
| style="text-align: right;" | 89,143.00
| WELL TAG PRESENT. TANKS OK. NO ACC ES. NO IW OPERATOR REMOVED LINER FROM IMPOUNDMENT, AWAITING OPERATOR RESPONSE ON SAMPLING RESULTS BENEATH LINER- ONCE SAMPLES ARE CONFIRMED WITHIN "LIMITS" OPERATOR WILL RELINE IMPOUNDMENT AND UTLIZED AS FRESHWATER.
+
| style="text-align: right;" | 328
 
+
| style="text-align: right;" | 0.00
RESULT PENDING UNTIL FINAL CONFIRMATION OF SAMPLE RESULTS.
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 76,954.00
 +
| style="text-align: right;" | 315
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2109943
+
| 2018
| 2012-10-16
+
| [[XTO ENERGY INC]]
| No Violations Noted
+
| style="text-align: right;" | 74,907.52
| At the time of this inspection, well ID sign, ES plan, ESCGP-1 present. Inspection follow up on reclamation and relining of impoundment as per agreement with department. It appears that impoundment has been successfully relined, minimal "fluids" present in freshwater impoundment, possibly that of precipitation. Areas previously disturbed have been seeded and mulch with observed growth. No accelerated erosion or sedimentation issues noted. It appears that operator has responded to previously issued notice of violation and no new violations are noted. 
+
| style="text-align: right;" | 335
 
+
| style="text-align: right;" | 0.00
Accompanied by Environmental Trainee Samantha Foulk during this inspection.
+
| style="text-align: right;" | 0
 
+
| style="text-align: right;" | 0.00
|  
+
| style="text-align: right;" | 0
|-
 
 
|-
 
|-
| 2136165
+
| 2019
| 2013-01-31
+
| [[XTO ENERGY INC]]
| No Violations Noted
+
| style="text-align: right;" | 71,056.70
| At the time of this inspection, well ID sign, ES plan, ESCGP-1 present. Drilling completed 10/25/09, well currently in production. As per previous agreement (w/ dept.) operator has relined freshwater impoundment.  All previously disturbed areas on and surrounding well site have been permanently stabilized with rock and/or vegetative growth. No accelerated erosion or sedimentation issues noted at the time of this inspection. Recommend that operator remove water (as per regulations) from metal containment dike surrounding production equipment and brine tank.  Shared access road stable.  No violations noted at the time of this inspection.  
+
| style="text-align: right;" | 347
 
+
| style="text-align: right;" | 0.00
 
+
| style="text-align: right;" | 0
Accompanied by Environmental Trainee Samantha Foulk and OGI Rick Hoover.  
+
| style="text-align: right;" | 0.00
 
+
| style="text-align: right;" | 0
|  
 
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Waste Type
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Quantity
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Disposal Method
!scope="col" | OIL QUANTITY
+
!scope="col" | Waste Facility ID
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2010
| style="text-align:right;" | 64719.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 184.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 4,260.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0095273
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2010
 +
| [[XTO ENERGY INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 885.50 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 
|-
 
|-
| 2012-1
+
| 2010
| style="text-align:right;" | 67513.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 182.0
+
| Drilling Fluid Waste
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 3,875.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0095273
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 459.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 
|-
 
|-
| 2011-2
+
| 2011
| style="text-align:right;" | 71697.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 182.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 776.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| 34-133-24096
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
|-
 +
| 2011
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 148.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
|-
 +
| 2011
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 682.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095273
 
|-
 
|-
| 2011-1
+
| 2012
| style="text-align:right;" | 88299.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 181.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 228.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| 34-133-24096
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 111.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 114
 
|-
 
|-
| 2010-2
+
| 2012
| style="text-align:right;" | 104993.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 183.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 111.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| 0114
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2012
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 111.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-20114
 
|-
 
|-
| 2010-3
+
| 2012
| style="text-align:right;" | 126905.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 180.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 2,456.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0254185
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 487.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 
|-
 
|-
| 2009-0
+
| 2013
| style="text-align:right;" | 0.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 0.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 503.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE TRANSFER FACILITY
| style="text-align:right;" | 0.0
+
| 101674
| style="text-align:right;" | 0.0
 
 
|-
 
|-
|}
+
| 2013
== Waste Data ==
+
| [[XTO ENERGY INC]]
{| class="wikitable sortable" width="95%"
+
| Produced Fluid
!scope="col" | PERIOD
+
| style="text-align: right;" | 100.00 Bbl
!scope="col" | TYPE
+
| CENT WASTE TRT FAC NPDES
!scope="col" | QUANTITY
+
| PA0254185
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
| 2013
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 1651.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 100.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0254185
 
| PA0254185
| RESERVED ENVIRONMENTAL SERVICES
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 93.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 550.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 648.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 53.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2012-2
+
| 2016
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 111.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 394.00 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| 34-37-133-20114
+
| WMGR123NW009
| SALTY'S DISPOSAL - WILCOX #1
 
| ROOTSTOWN
 
| OH
 
 
|-
 
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 308.49 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2012-2
+
| 2017
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 114.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 13.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-37-133-24096
+
| 34-133-24189
| SALTYS DISPOSAL - GROSELLE INECTION WELL # 2
 
| GARRETTSVILLE
 
| OH
 
 
|-
 
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 313.41 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2010-3
+
| 2018
| DRILLING FLUID WASTE
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 7750.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 517.10 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROCESSING FACILITY
| PA0095273
+
| WMGR123NW009
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 
|-
 
|-
| 2010-3
+
| 2019
| PRODUCED FLUID
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 4640.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 461.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROCESSING FACILITY
| PA0095273
+
| WMGR123NW009
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 79.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2010-3
+
|}
| DRILLING FLUID WASTE
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 1771.0
+
| title =Oil and Gas Waste Reports
| Bbl
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| date = 2019-03-31
| PA0091472
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| TUNNELTON LIQUIDS COMPANY
+
| accessdate = 2019-05-21 }}</ref>
| SALTSBURG
+
== Inspection Data ==
| PA
+
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 +
| 1835933
 +
| Primary Facility
 +
| 2009-10-01
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| MARCELLUS - drilling @ 7,237ft/E&S ok/ID&pit ok
 
|-
 
|-
| 2010-2
+
| 1840492
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 1940.0
+
| 2009-10-27
| Bbl
+
| Routine/Complete Inspection
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PA0095273
+
| Marcellus well.  Drilling crew rigging down and removing equipment at time of inspection.  Well head only on site.
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 +
| 1840500
 +
| Primary Facility
 +
| 2009-10-28
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Marcellus well.  Drilling crew rigging down and removing equipment at time of inspection.  Well head only on site.
 
|-
 
|-
| 2011-1
+
| 1943220
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 682.0
+
| 2011-01-03
| Bbl
+
| Site Restoration
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| Violation(s) Noted
| PA0095273
+
| Marcellus well.  Well is equipped for production.  Drilling completed 10/25/2009.
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 +
| 2043141
 +
| Primary Facility
 +
| 2012-02-02
 +
| Routine/Complete Inspection
 +
| Outstanding Violations - No Viols Req'd
 +
| During this inspection, well drilled and equipped for prodcution. Well sign ES plan present. According to records drilling completed on 10/25/09. Prevoius violations issed on 1/03/11 by WQS Curtis Small for failure to restore site and impoundment within nine months of completion of drilling.  At the time of this inspection, "frac pond" still located on well site and currently full of water. Line of "frac pond"  appears structurally compromised with various holes.  Site has been seeded/mulch with minimal growth, does not appear to be at least 70% unfiorm vegeatative cover. Share access road, could be maintained as mud and rutting apepars to be a concern. Minor E/S issues noted on site due to lack of vegettative stabilization. No temporary bmp's observed.
 
|-
 
|-
| 2011-1
+
| 2071675
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 122.0
+
| 2012-05-09
| Bbl
+
| Follow-up Inspection
| INJECTION DISPOSAL WELL
+
| Outstanding Violations - No Viols Req'd
| 34-37-133-24096
+
| During this inspection, well drilled and equipped for production. Well sign ES plan present. Two brine tanks located onsite located with metal secondary containment. Site has been seeded/mulch with growth.No accelerated erosion or sedimentation concerns noted at this time. According to records drilling completed on 10/25/09.  At the time of this inspection, "frac pond" still located on well site and currently full of water. Liner of "frac pond"  appears to have been repaired since last inspection- holes appear to have been patched.  Since last inspection department noted settling of "sandy" material-possibly indicating flowback material??? Operator claims pit is being used for freshwater only. Department has a meeting planned for May 11 with operator to discuss outstanding violations at this location.  Department had requested written response on what restoration efforts are being planned for i"frac pond" as well as time of when these events will commence. Dept requesting sample anlaysis and disposal records for materials disposed of from this site
| SALTYS DISPOSAL - GROSELLE INECTION WELL # 2
 
| GARRETTSVILLE
 
| OH
 
 
|-
 
|-
 +
| 2089729
 +
| Primary Facility
 +
| 2012-08-01
 +
| Follow-up Inspection
 +
| Outstanding Violations - No Viols Req'd
 +
| At the time of this inspection, well ID sign, ES plan, ESCGP-1 present. Inspection follow up on reclamation and relining of impoundment as per agreement with department. Impoundment currently lined with minimal fluid, as operator actively pumping fluids out and hauling off site to an approval facility. Six roll off boxes located onsite in preparation for removal of impoundment liner and any contaminants that may have entered grounds of the commonwealth due to structural deficiencies in liner.  At the time of this inspection, no new violations noted. A follow up inspection will be conducted when liner has been successfully removed and samples collected prior to relining impoundment for re-use as freshwater impoundment
 
|-
 
|-
| 2011-1
+
| 2090948
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 111.0
+
| 2012-08-01
| Bbl
+
| Follow-up Inspection
| INJECTION DISPOSAL WELL
+
| No Violations Noted
| 34-37-133-21076
+
| WELL TAG PRESENT. TANKS OK. NO ACC ES. NO IW OPERATOR REMOVED LINER FROM IMPOUNDMENT, AWAITING OPERATOR RESPONSE ON SAMPLING RESULTS BENEATH LINER- ONCE SAMPLES ARE CONFIRMED WITHIN "LIMITS" OPERATOR WILL RELINE IMPOUNDMENT AND UTLIZED AS FRESHWATER.
| SALTYS DISPOSAL - MYERS INECTION WELL #1
 
| PARIS
 
| OH
 
 
|-
 
|-
 +
| 2109943
 +
| Primary Facility
 +
| 2012-10-16
 +
| Compliance Evaluation
 +
| No Violations Noted
 +
| At the time of this inspection, well ID sign, ES plan, ESCGP-1 present. Inspection follow up on reclamation and relining of impoundment as per agreement with department. It appears that impoundment has been successfully relined, minimal "fluids" present in freshwater impoundment, possibly that of precipitation. Areas previously disturbed have been seeded and mulch with observed growth. No accelerated erosion or sedimentation issues noted. It appears that operator has responded to previously issued notice of violation and no new violations are noted.
 
|-
 
|-
| 2011-1
+
| 2136165
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 148.0
+
| 2013-01-31
| Bbl
+
| Routine/Complete Inspection
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PA0091472
+
| At the time of this inspection, well ID sign, ES plan, ESCGP-1 present. Drilling completed 10/25/09, well currently in production. As per previous agreement (w/ dept.) operator has relined freshwater impoundment.  All previously disturbed areas on and surrounding well site have been permanently stabilized with rock and/or vegetative growth. No accelerated erosion or sedimentation issues noted at the time of this inspection. Recommend that operator remove water (as per regulations) from metal containment dike surrounding production equipment and brine tank.  Shared access road stable.  No violations noted at the time of this inspection.
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
 +
| 2206734
 +
| Primary Facility
 +
| 2013-08-22
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Marcellus. At time of inspection, well equipped for production. According to records, date of TD was 10/25/2009. Wellhead surrounded by fence. Well tag present, legible.
 
|-
 
|-
| 2011-2
+
| 2232662
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 100.0
+
| 2012-05-11
| Bbl
+
| Administrative/File Review
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| Outstanding Violations - No Viols Req'd
| PA0254185
+
| On site meeting with operator to discuss resotration of well site, mainly freshwater pond located on well site.  Paper inspection report.
| RESERVED ENVIRONMENTAL SERVICES
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2489581
 +
| Primary Facility
 +
| 2016-05-25
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of this inspection, well drilled and appears equipped for production. According to records, drilling occurred 09/11/2009-10/25/2009. Well surrounded by fence, well tag affixed to fence. Department recommends Operator install well tag on well in a legible, visible, and permanent manner as per current regulations. Brine tank appears sound and is located within a lined, metal secondary containment unit.
 +
Access road stabilized.
 +
Site ID sign present, in compliance with Act 9 standards. ERP on-site.
 +
Inspection conducted with WQS Cindy Witham.
 
|-
 
|-
| 2011-2
+
| 2502628
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 654.0
+
| 2016-07-18
| Bbl
+
| Routine/Complete Inspection
| INJECTION DISPOSAL WELL
+
| No Violations Noted
| 34-37-133-24096
+
| Single-well Marcellus site. Well appears equipped for production.
| SALTYS DISPOSAL - GROSELLE INECTION WELL # 2
+
At time of inspection site ID sign, well permit, E&S plan, ESCGP, and PPC plan all on site. No E&S issues observed in relation to access road or well pad. Well tag present. Brine tank located in secondary containment appears structurally sound.
| GARRETTSVILLE
 
| OH
 
 
|-
 
|-
 +
| 2519645
 +
| Primary Facility
 +
| 2016-09-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Marcellus site.
 +
At time of inspection Site ID sign, PPC plan, E&S plan, Well permit, and ESCGP on site.
 +
No E&S issues observed on access road. Well pad rocked, no E&S issues observed.
 +
It appears well is equipped for production. Well head surrounded by fence. Well tag present and legible.
 +
Brine tank located in secondary containment appears structurally sound.
 +
The NOT for the ESCGP-1 associated with this well site (ESX09-063-0005) has been approved at the time of this inspection.
 
|-
 
|-
| 2011-2
+
|}
| PRODUCED FLUID
+
==== Violations Commited ====
| style="text-align:right;" | 348.0
+
{| class="wikitable sortable" width="95%"
| Bbl
+
!scope="col" | Inspection ID
| INJECTION DISPOSAL WELL
+
!scope="col" | Violation ID
| 34-37-133-21076
+
!scope="col" | Violation Date
| SALTYS DISPOSAL - MYERS INECTION WELL #1
+
!scope="col" | Date Resolved
| PARIS
+
!scope="col" | Violation Code
| OH
+
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
 +
| 1943220
 +
| 603070
 +
| 01/03/2011
 +
| 2011-01-03
 +
| 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
 +
| Environmental Health & Safety
 +
|
 
|-
 
|-
| 2012-1
+
| 1943220
| PRODUCED FLUID
+
| 603071
| style="text-align:right;" | 114.0
+
| 01/03/2011
| Bbl
+
| 2011-01-03
| INJECTION DISPOSAL WELL
+
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
| 34-37-133-24096
+
| Environmental Health & Safety
| GROSELLE #2 - SALTYS DISPOSAL WELLS LP
+
|  
| GARRETTSVILLE
 
| OH
 
 
|-
 
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 2012-1
+
| 603070
| PRODUCED FLUID
+
| 266907
| style="text-align:right;" | 805.0
+
| NOV - Notice of Violation
| Bbl
+
| Comply/Closed
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
|
| PA0254185
+
| 2012-10-16
| RESERVED ENVIRONMENTAL SERVICES
+
| style="text-align: right;" |  
| MOUNT PLEASANT
+
| style="text-align: right;" |  
| PA
 
 
|-
 
|-
|-
+
| 603071
| 2012-1
+
| 266907
| PRODUCED FLUID
+
| NOV - Notice of Violation
| style="text-align:right;" | 111.0
+
| Comply/Closed
| Bbl
+
|
| INJECTION DISPOSAL WELL
+
| 2012-10-16
| 0114
+
| style="text-align: right;" |  
| WILCOX #1
+
| style="text-align: right;" |  
| ROOTSTOWN
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 05:32, 16 May 2020

Well Details

Well ID: 37-063-36434
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Center Township
Operator Name: XTO ENERGY INC
Well Pad ID: 147585
Farm/Lease Name: HOMER CITY POWER PLANT 8422H
License Status:
Spud Date: 2009-09-11
Permit Date: 2009-02-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.510643
Longitude: -79.186639

For data sources see[1][2][3]

Well History

Date Event
2009-02-09 New Permit Application
2009-09-11 Performed Spud Operation
2009-10-25 Drilling Completion
2009-12-10 Perforation
2011-01-24 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2010 XTO ENERGY INC 168,445.50 273 0.00 0 0.00 0
2011 XTO ENERGY INC 159,996.00 363 0.00 0 0.00 0
2012 XTO ENERGY INC 132,232.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 121,082.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 91,078.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 94,462.00 261 0.00 0 0.00 0
2016 XTO ENERGY INC 89,143.00 328 0.00 0 0.00 0
2017 XTO ENERGY INC 76,954.00 315 0.00 0 0.00 0
2018 XTO ENERGY INC 74,907.52 335 0.00 0 0.00 0
2019 XTO ENERGY INC 71,056.70 347 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 XTO ENERGY INC Produced Fluid 4,260.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 XTO ENERGY INC Drilling Fluid Waste 885.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 XTO ENERGY INC Drilling Fluid Waste 3,875.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 XTO ENERGY INC Produced Fluid 459.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2011 XTO ENERGY INC Produced Fluid 776.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011 XTO ENERGY INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 XTO ENERGY INC Produced Fluid 148.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 XTO ENERGY INC Produced Fluid 682.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 XTO ENERGY INC Produced Fluid 228.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 XTO ENERGY INC Produced Fluid 111.00 Bbl INJECTION DISPOSAL WELL 114
2012 XTO ENERGY INC Produced Fluid 111.00 Bbl INJECTION DISPOSAL WELL 0114
2012 XTO ENERGY INC Produced Fluid 111.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012 XTO ENERGY INC Produced Fluid 2,456.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 487.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 503.00 Bbl RESIDUAL WASTE TRANSFER FACILITY 101674
2013 XTO ENERGY INC Produced Fluid 100.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 100.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 93.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Produced Fluid 550.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 648.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 53.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XTO ENERGY INC Produced Fluid 394.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 308.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 13.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 313.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 517.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 461.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 79.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1835933 Primary Facility 2009-10-01 Drilling/Alteration No Violations Noted MARCELLUS - drilling @ 7,237ft/E&S ok/ID&pit ok
1840492 Primary Facility 2009-10-27 Routine/Complete Inspection No Violations Noted Marcellus well. Drilling crew rigging down and removing equipment at time of inspection. Well head only on site.
1840500 Primary Facility 2009-10-28 Routine/Complete Inspection No Violations Noted Marcellus well. Drilling crew rigging down and removing equipment at time of inspection. Well head only on site.
1943220 Primary Facility 2011-01-03 Site Restoration Violation(s) Noted Marcellus well. Well is equipped for production. Drilling completed 10/25/2009.
2043141 Primary Facility 2012-02-02 Routine/Complete Inspection Outstanding Violations - No Viols Req'd During this inspection, well drilled and equipped for prodcution. Well sign ES plan present. According to records drilling completed on 10/25/09. Prevoius violations issed on 1/03/11 by WQS Curtis Small for failure to restore site and impoundment within nine months of completion of drilling. At the time of this inspection, "frac pond" still located on well site and currently full of water. Line of "frac pond" appears structurally compromised with various holes. Site has been seeded/mulch with minimal growth, does not appear to be at least 70% unfiorm vegeatative cover. Share access road, could be maintained as mud and rutting apepars to be a concern. Minor E/S issues noted on site due to lack of vegettative stabilization. No temporary bmp's observed.
2071675 Primary Facility 2012-05-09 Follow-up Inspection Outstanding Violations - No Viols Req'd During this inspection, well drilled and equipped for production. Well sign ES plan present. Two brine tanks located onsite located with metal secondary containment. Site has been seeded/mulch with growth.No accelerated erosion or sedimentation concerns noted at this time. According to records drilling completed on 10/25/09. At the time of this inspection, "frac pond" still located on well site and currently full of water. Liner of "frac pond" appears to have been repaired since last inspection- holes appear to have been patched. Since last inspection department noted settling of "sandy" material-possibly indicating flowback material??? Operator claims pit is being used for freshwater only. Department has a meeting planned for May 11 with operator to discuss outstanding violations at this location. Department had requested written response on what restoration efforts are being planned for i"frac pond" as well as time of when these events will commence. Dept requesting sample anlaysis and disposal records for materials disposed of from this site
2089729 Primary Facility 2012-08-01 Follow-up Inspection Outstanding Violations - No Viols Req'd At the time of this inspection, well ID sign, ES plan, ESCGP-1 present. Inspection follow up on reclamation and relining of impoundment as per agreement with department. Impoundment currently lined with minimal fluid, as operator actively pumping fluids out and hauling off site to an approval facility. Six roll off boxes located onsite in preparation for removal of impoundment liner and any contaminants that may have entered grounds of the commonwealth due to structural deficiencies in liner. At the time of this inspection, no new violations noted. A follow up inspection will be conducted when liner has been successfully removed and samples collected prior to relining impoundment for re-use as freshwater impoundment
2090948 Primary Facility 2012-08-01 Follow-up Inspection No Violations Noted WELL TAG PRESENT. TANKS OK. NO ACC ES. NO IW OPERATOR REMOVED LINER FROM IMPOUNDMENT, AWAITING OPERATOR RESPONSE ON SAMPLING RESULTS BENEATH LINER- ONCE SAMPLES ARE CONFIRMED WITHIN "LIMITS" OPERATOR WILL RELINE IMPOUNDMENT AND UTLIZED AS FRESHWATER.
2109943 Primary Facility 2012-10-16 Compliance Evaluation No Violations Noted At the time of this inspection, well ID sign, ES plan, ESCGP-1 present. Inspection follow up on reclamation and relining of impoundment as per agreement with department. It appears that impoundment has been successfully relined, minimal "fluids" present in freshwater impoundment, possibly that of precipitation. Areas previously disturbed have been seeded and mulch with observed growth. No accelerated erosion or sedimentation issues noted. It appears that operator has responded to previously issued notice of violation and no new violations are noted.
2136165 Primary Facility 2013-01-31 Routine/Complete Inspection No Violations Noted At the time of this inspection, well ID sign, ES plan, ESCGP-1 present. Drilling completed 10/25/09, well currently in production. As per previous agreement (w/ dept.) operator has relined freshwater impoundment. All previously disturbed areas on and surrounding well site have been permanently stabilized with rock and/or vegetative growth. No accelerated erosion or sedimentation issues noted at the time of this inspection. Recommend that operator remove water (as per regulations) from metal containment dike surrounding production equipment and brine tank. Shared access road stable. No violations noted at the time of this inspection.
2206734 Primary Facility 2013-08-22 Routine/Complete Inspection No Violations Noted Marcellus. At time of inspection, well equipped for production. According to records, date of TD was 10/25/2009. Wellhead surrounded by fence. Well tag present, legible.
2232662 Primary Facility 2012-05-11 Administrative/File Review Outstanding Violations - No Viols Req'd On site meeting with operator to discuss resotration of well site, mainly freshwater pond located on well site. Paper inspection report.
2489581 Primary Facility 2016-05-25 Routine/Partial Inspection No Violations Noted At the time of this inspection, well drilled and appears equipped for production. According to records, drilling occurred 09/11/2009-10/25/2009. Well surrounded by fence, well tag affixed to fence. Department recommends Operator install well tag on well in a legible, visible, and permanent manner as per current regulations. Brine tank appears sound and is located within a lined, metal secondary containment unit.

Access road stabilized. Site ID sign present, in compliance with Act 9 standards. ERP on-site. Inspection conducted with WQS Cindy Witham.

2502628 Primary Facility 2016-07-18 Routine/Complete Inspection No Violations Noted Single-well Marcellus site. Well appears equipped for production.

At time of inspection site ID sign, well permit, E&S plan, ESCGP, and PPC plan all on site. No E&S issues observed in relation to access road or well pad. Well tag present. Brine tank located in secondary containment appears structurally sound.

2519645 Primary Facility 2016-09-13 Routine/Complete Inspection No Violations Noted Marcellus site.

At time of inspection Site ID sign, PPC plan, E&S plan, Well permit, and ESCGP on site. No E&S issues observed on access road. Well pad rocked, no E&S issues observed. It appears well is equipped for production. Well head surrounded by fence. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. The NOT for the ESCGP-1 associated with this well site (ESX09-063-0005) has been approved at the time of this inspection.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1943220 603070 01/03/2011 2011-01-03 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging Environmental Health & Safety
1943220 603071 01/03/2011 2011-01-03 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
603070 266907 NOV - Notice of Violation Comply/Closed 2012-10-16
603071 266907 NOV - Notice of Violation Comply/Closed 2012-10-16

For data sources see[7]

References