If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-34163 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.502763,"lon":-79.414957,"icon":""}]} |
Operator Name: XTO ENERGY INC | |
First Permit Date: 2005-02-17 | |
Last Permit Date: 2006-02-03 | |
Spud Date: 2006-06-04 | |
Unconventional: No | |
Horizontal: No | |
Violations: 1 | |
Latitude: 40.502763 | |
Longitude: -79.414957 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 1822.0 | 365.0 | 0.0 | 0.0 | 11.84 | 365.0 |
2012-0 | 2651.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 3043.0 | 363.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 3734.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 4517.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2008-0 | 5659.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2007-0 | 8585.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2006-0 | 3473.0 | 94.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 33.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | PRODUCED FLUID | 24.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR000519462 | ADVANCED WASTE SERVICES OF PA (NEW CASTLE) | NEW CASTLE | PA |
2010-0 | PRODUCED FLUID | 3.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 | CLEARFIELD MUNICIPAL SEWAGE TREATMENT PLANT | CLEARFIELD | PA |
2010-0 | PRODUCED FLUID | 3.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 | JOHNSTOWN SEWAGE TREATMENT PLANT | JOHNSTOWN | PA |
2010-0 | PRODUCED FLUID | 4.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 | PUNXSUTAWNEY BORO STP | PUNXSUTAWNEY | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2012-0 | PRODUCED FLUID | 33.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1780460 | 2009-03-31 | Violation(s) Noted | Well is operating and is in production. Brine Tank located on-site is in sound condition. Several deficiencies were noted while on-site:
1- The lack of vegetation has caused severe erosion and sedimentation. 2- There is off-site transportation of sediment. After addressing the severe erosion ruts, the site should be seeded and mulched and it may help to prevent future erosion problems if a diversion ditch was installed. Spoke with operator representative Dan Rice regarding these deficiencies and the problems will be addressed when an agreement can be reached with the landowner. |
559686 |
1793564 | 2009-04-28 | No Violations Noted | 4/28- The well site was re-visited to check on the progress of a previously issued NOV. Well is operating and is in production. Brine Tank located on-site is in sound condition. No accelerated erosion and sedimentation noted on the access road or well site. The site has recently been seeded and mulched. All deficiencies have been addressed. It is recommended that the NOV be submitted for closure. | |
1797307 | 2009-05-11 | No Violations Noted | Well seems to be in production at the time of inspection. Brine tank is in sound condition. Drilling was completed 06/08/2006. Well site and access road are showing no signs of erosion and sedimentation. The site restoration is complete. |