X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-34093

Well Details

Well ID: 37-063-34093
Loading map...
County: Indiana
Municipality: Brush Valley Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: PENROSE 1
First Permit Date: 2005-01-05
Last Permit Date: 2005-01-05
Spud Date: 2005-02-14
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.48224
Longitude: -79.097624

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2005-0 7181.0 160.0 0.0 0.0 0.0 0.0
2006-0 5384.0 365.0 0.0 0.0 0.0 0.0
2007-0 1730.0 365.0 0.0 0.0 0.0 0.0
2008-0 2041.0 365.0 0.0 0.0 0.0 0.0
2010-0 1835.0 365.0 0.0 0.0 0.0 0.0
2011-0 1757.4 365.0 0.0 0.0 0.0 0.0
2012-0 1295.0 365.0 0.0 0.0 0.0 0.0
2013-0 747.0 335.0 0.0 0.0 0.0 0.0
2014-0 754.0 274.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2005-0 BRINE 60.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2008-0 BRINE 20.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-0 PRODUCED FLUID 20.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-0 PRODUCED FLUID 10.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2012-0 PRODUCED FLUID 10.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1426561 2005-02-17 No Violations Noted Dallas-Morris waiting on cement at time of inspection. Pit, Notif. and E&S OK.

For data sources see[3]

References