X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-27747"

m
m
Line 104: Line 104:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 109: Line 110:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2019-M01
+
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 17.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ORDER 2016-29
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 29.82 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| ORDER 2016-415
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 8.33 Bbl
+
| style="text-align: right;" | 26.66 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2019-M01
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 18.67 Bbl
+
| Produced Fluid (in Barrels) RWC 802
| SURFACE IMPOUNDMENT
+
| style="text-align: right;" | 190.83 Bbl
| 95-7-37312-19
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ORDER 2016-29
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.19 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 
|-
 
|-
| 2019-M01
+
| 2019
 +
| [[CNX GAS CO LLC]]
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 4.17 Bbl
+
| style="text-align: right;" | 180.34 Bbl
| SURFACE IMPOUNDMENT
 
| 95-7-37312-21
 
|-
 
| 2019-M01
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 2.50 Bbl
 
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2019-M02
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 158.95 Tons
 
| LANDFILL
 
| 06-08438
 
|-
 
| 2019-M02
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 248.95 Tons
 
| LANDFILL
 
| 100172
 
|-
 
| 2019-M02
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 86.67 Bbl
+
| style="text-align: right;" | 180.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2019-M02
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 2.50 Bbl
+
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 587.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| ODNR 2015-29
+
|  
 
|-
 
|-
| 2019-M02
+
| 2019
 +
| [[CNX GAS CO LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 15.00 Bbl
+
| style="text-align: right;" | 32.50 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
| ORDER 2016-29
+
| 95-7-37312-19
 
|-
 
|-
| 2019-M02
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 15.17 Bbl
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 129.17 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW019
+
| ODNR 2015-29
 
|-
 
|-
| 2019-M02
+
| 2019
 +
| [[CNX GAS CO LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 20.83 Bbl
 
| style="text-align: right;" | 20.83 Bbl
Line 175: Line 187:
 
| 95-7-37312-17
 
| 95-7-37312-17
 
|-
 
|-
| 2019-M02
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 29.82 Bbl
+
| Drill Cuttings (in Tons) RWC 810
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 596.73 Tons
| ORDER 2016-415
+
| LANDFILL
 +
| 100172
 
|-
 
|-
| 2019-M02
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 743.17 Bbl
+
| Drilling Fluid Waste (in Barrels) RWC 803
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 4.17 Bbl
|
+
| SURFACE IMPOUNDMENT
|-
+
| 95-7-37312-21
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 129.17 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 190.83 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
 
|-
 
|-
| 2019-M02
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 15.19 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
|-
 
| 2019-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 16.67 Bbl
 
| style="text-align: right;" | 16.67 Bbl
Line 211: Line 208:
 
| 95-7-37312-17
 
| 95-7-37312-17
 
|-
 
|-
| 2019-M02
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 33.33 Bbl
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| SURFACE IMPOUNDMENT
+
| style="text-align: right;" | 15.17 Bbl
| 95-7-37312-19
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 
|-
 
|-
| 2019-M03
+
| 2019
 +
| [[CNX GAS CO LLC]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
| style="text-align: right;" | 73.64 Tons
+
| style="text-align: right;" | 232.59 Tons
 
| LANDFILL
 
| LANDFILL
 
| 06-08438
 
| 06-08438
 
|-
 
|-
| 2019-M03
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 347.78 Tons
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| LANDFILL
+
| style="text-align: right;" | 20.83 Bbl
| 100172
 
|-
 
| 2019-M03
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 587.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|
 
|-
 
| 2019-M03
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 18.33 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2019-M03
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 74.50 Bbl
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 743.17 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| ORDER 2016-29
+
|  
 
|-
 
|-
| 2019-M03
+
| 2019
 +
| [[CNX GAS CO LLC]]
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 18.17 Bbl
 
| style="text-align: right;" | 18.17 Bbl
Line 253: Line 243:
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2019-M03
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 161.67 Bbl
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 33.33 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2019-M03
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 93.33 Bbl
+
| Drilling Fluid Waste (in Barrels) RWC 803
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 74.50 Bbl
|
 
|-
 
| 2019-M03
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 18.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
|-
 
| 2019-M03
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 2.50 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
| ORDER 2016-29
|-
 
| 2019-M03
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 30.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
 
|-
 
|-
 
|}
 
|}

Revision as of 16:42, 19 August 2019

Well Details

Well ID: 37-059-27747
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Richhill Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 155377
Farm/Lease Name: SILVER FOX FARMS LLC RHL71EHSM
License Status: Active
Spud Date: 2019-01-25
Permit Date: 2018-11-13
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.913922
Longitude: -80.478113

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 17.50 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 29.82 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 26.66 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 190.83 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 15.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 180.34 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 180.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 587.50 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 32.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 129.17 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 20.83 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Drill Cuttings (in Tons) RWC 810 596.73 Tons LANDFILL 100172
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 4.17 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 16.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 15.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Drill Cuttings (in Tons) RWC 810 232.59 Tons LANDFILL 06-08438
2019 CNX GAS CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 20.83 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 743.17 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 18.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid (in Barrels) RWC 802 33.33 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Drilling Fluid Waste (in Barrels) RWC 803 74.50 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2833852 Primary Facility 2019-01-24 Routine/Complete Inspection No Violations Noted On January 24, 2019, the Department performed an inspection of the CNX, RHL71 well pad site. The site is located in Richhill Twp., Greene Co. The inspection was related to a request by the operator for pre-operational inspection prior to the commencement of drilling operations on the well site.

The operator has completed construction of the access road and is stoning the well pad. The operator has installed all the E&S BMPs which appear in good condition and functional. The operator has not finalized the permanent stabilization on the well pad fill slopes, but is was working on the stabilization and will complete as weather permits. The operator has indicated that areas on the well pad fill slopes will be hydro seeded and stabilized as weather permits. The operator has installed and stabilized the PCSM structures.

6 cellars have been installed on the pad for conductor set and the start of drilling operations, after the pre-operational inspection. 6 wells have been permitted for the site and all permits a

2836434 Primary Facility 2019-02-06 Drilling/Alteration No Violations Noted The well was spud on 1/26/2019. The operator drilled a 32" hole to 100' and set and cemented a 26" conductor pipe at 100'. Conductor pipe cemented from the seat to the surface through tubing.

For data sources see[6]

References