X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-27710

Well Details

Well ID: 37-059-27710
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Richhill Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 155376
Farm/Lease Name: BRADDOCK RHL99CHSM
License Status:
Spud Date:
Permit Date: 2018-08-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.920921
Longitude: -80.450368

For data sources see[1][2][3]

Well History

Date Event
2018-08-01 New Permit Application
2019-01-11 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 CNX GAS CO LLC Drill Cuttings 357.47 Tons LANDFILL 06-08438
2019 CNX GAS CO LLC Produced Fluid 106.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Drilling Fluid Waste 55.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Other Oil & Gas Wastes 12.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Other Oil & Gas Wastes 161.88 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Drilling Fluid Waste 767.38 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Drilling Fluid Waste 55.75 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Drilling Fluid Waste 212.50 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Other Oil & Gas Wastes 23.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Other Oil & Gas Wastes 30.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Other Oil & Gas Wastes 3.75 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Other Oil & Gas Wastes 94.89 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Drilling Fluid Waste 388.65 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Drilling Fluid Waste 130.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Drill Cuttings 1,244.23 Tons LANDFILL 100172
2019 CNX GAS CO LLC Synthetic Liner Materials 5.16 Tons LANDFILL 100172
2019 CNX GAS CO LLC Other Oil & Gas Wastes 314.38 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Drilling Fluid Waste 13.75 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2019 CNX GAS CO LLC Produced Fluid 205.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 37.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 12.75 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2019 CNX GAS CO LLC Drilling Fluid Waste 42.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 116.88 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2826112 Primary Facility 2019-01-09 Preoperation Inspection No Violations Noted On January 9, 2019, the Department performed an inspection of the CNX, RHL99 well pad site. The site is located in Richhill Twp., Greene Co. The inspection was related to a request by the operator for pre-operational inspection prior to the commencement of drilling operations on the well site.

The operator has completed construction of the access road and well pad. The operator has installed all the E&S BMPs which appear in good condition and functional. The operator has finalized the permanent stabilization on the well pad fill slopes. The operator had begin hydro seeding the site the previous day, which has been impacted to a rainfall event. The operator has indicated that areas on the well pad fill slopes will be hydro seeded a second time. The operator has installed and stabilized the PCSM structures.

8 cellars have been set on the pad for conductor set for the start of drilling operations, after the pre-operational inspection. 5 wells have been permitted on the site at time of inspection and 3 new

2830005 Primary Facility 2019-01-22 Drilling/Alteration No Violations Noted The well was spud on 1/16/2019. The operator augered a 32" borehole to 100 feet. 100 feet of 26" welded conductor pipe was set at 100 feet and cemented to the surface through tubing. A cylindrical steel well cellar has been installed. The operator is currently on site drilling mouseholes.

For data sources see[7]

References