X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26958

Well Details

Well ID: 37-059-26958
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Franklin Township
Operator Name: EQT PROD CO
Well Pad ID: 153044
Farm/Lease Name: STROPE 593170
License Status:
Spud Date: 2016-07-14
Permit Date: 2015-11-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.924528
Longitude: -80.130089

For data sources see[1][2][3]

Well History

Date Event
Deviated
2015-11-20 New Permit Application
2016-07-13 Performed Spud Operation
2017-02-08 MOD
2017-04-09 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-26 2017-09-08 7,999 8,691,440 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SFR-451 Clariant Friction Reducer Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Listed Below
AP Breaker Universal Breaker Listed Below
Sand (Proppant) Universal Proppant Listed Below
WGA-7 SLR Universal Gelling Agent Listed Below
Unihib-G GeoSafe Acid Corrosion Inhibitor Listed Below
Scale Hib-A21 Universal Scale Inhibitor Listed Below
FR-13 Clariant Friction Reducer Listed Below
MX-5-3886 Multi-Chem Bacteria Treatment Listed Below
Alcohols, C10-16, Ethoxylated 68002-97-1 5 0.000981879 838.572
Alcohols, C10-16, Ethoxylated 0068002-97-1 50 0.00007672 65.519
Alcohols, C12-16, Ethoxylated 68551-12-2 5 0.000981879 838.572
Ammonium Acetate 631-61-8 10 0.00196376 1677.15
Amine Triphosphate Proprietary 30 0.00704842 6019.7
Ammonium Persulfate 7727-54-0 100 0.00001075 9.18
Distillates (Petoleum), Hydrotreated Light 64742-47-8 55 0.00005589 47.733
Formaldehyde 0000050-00-0 1 0.00000153 1.31
Butyl Diglycol 0000112-34-5 75 0.0147282 12578.6
Calcium Nitrate.4H2O 13477-34-4 100 0.0560758 47891.4
Methanol 0000067-56-1 5 0.00000767 6.552
Thiourea 0000062-56-6 1 0.00000153 1.31
Hydrochloric Acid 7647-01-0 15 0.0245543 20970.6
Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.00704842 6019.7
Methanol 0000067-56-1 5 0.00000767 6.552
Alcohols, C12-14, Ethoxylated 68439-50-9 5 0.000981879 838.572
Alcohols, C12-16, Ethoxylated 68551-12-2 5 0.000981879 838.572
Alcohols, C10-16, 6 EO 68002-97-1 10 0.00535138 4570.34
Contains no hazardous substances
in concentrations above
cut-off values according to the competent authority
Proprietary 100 0.00485658 4147.76
Alcohols, C10-16, Ethoxylated 0068002-97-1 50 0.00007672 65.519
Distillates (Petoleum), Hydrotreated Light 64742-47-8 55 0.00005589 47.733
Formaldehyde 0000050-00-0 1 0.00000153 1.31
Alcohols, C12-14, Ethoxylated 68439-50-9 5 0.000981879 838.572
Sodium Phosphate, Tribasic 7601-54-9 5 0.00117474 1003.28
Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.00704842 6019.7
Thiourea 0000062-56-6 1 0.00000153 1.31
Ethylene Glycol 107-21-1 5 0.00117474 1003.28
Ammonium Acetate 631-61-8 10 0.00196376 1677.15
Guar Gum 9000-30-0 55 0.00008439 72.071
Guar Gum 9000-30-0 55 0.00008439 72.071
Butyl Diglycol 0000112-34-5 75 0.0147282 12578.6
Hydrocarbons C9-C16 64742-47-8 50 0.0267569 22851.7
Silica Substrate 14808-60-7 100 14.7535 12,600,200.0
Alcohols, C10-16, Ethoxylated 68002-97-1 5 0.000981879 838.572
Water Universal Carrier/Base Fluid Water 7732-18-5 100 84.925 72,530,100.0
Hydrochloric Acid (15%) Universal Acidizing Listed Below
MX-8-4543 Multi-Chem Bacteria Treatment Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 EQT PROD CO 0.00 0 0.00 0 0.00 0
2017 EQT PROD CO 445,844.00 62 0.00 0 0.00 0
2018 EQT PROD CO 1,250,693.00 329 0.00 0 0.00 0
2019 EQT PROD CO 749,997.00 342 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 EQT PROD CO Drilling Fluid Waste 1,560.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Drilling Fluid Waste 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2016 EQT PROD CO Drill Cuttings 595.31 Tons LANDFILL 100419
2017 EQT PROD CO Produced Fluid 75.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Produced Fluid 2,265.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Other Oil & Gas Wastes 350.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 5.07 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2017 EQT PROD CO Produced Fluid 514.03 Bbl RESIDUAL WASTE PROCESSING FACILITY
2017 EQT PROD CO Drilling Fluid Waste 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 1,770.60 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Drilling Fluid Waste 780.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Drill Cuttings 448.56 Tons LANDFILL 100419
2017 EQT PROD CO Produced Fluid 28.73 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 EQT PROD CO Produced Fluid 94.08 Bbl INJECTION DISPOSAL WELL 34-009-23823
2018 EQT PROD CO Produced Fluid 3,157.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Other Oil & Gas Wastes 58.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 46.18 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Other Oil & Gas Wastes 711.57 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 2,707.63 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 1,085.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EQT PROD CO Produced Fluid 1.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Produced Fluid 193.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 847.47 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 6.47 Bbl INJECTION DISPOSAL WELL 34-157-25511
2019 EQT PROD CO Other Oil & Gas Wastes 6.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 6.47 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 EQT PROD CO Other Oil & Gas Wastes 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Produced Fluid 92.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Other Oil & Gas Wastes 271.40 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2502184 Primary Facility 2016-07-18 Drilling/Alteration No Violations Noted Well spud on 7/13/2016. Operator drilled a 30-inch borehole and set 26-inch conductor pipe at 40 ft. Conductor pipe cemented in place. Well cellar in place.
2502316 Primary Facility 2016-06-24 Preoperation Inspection No Violations Noted Preoperational inspection conducted on June 24, 2016. No violations noted.
2520621 Primary Facility 2016-08-29 Drilling/Alteration No Violations Noted Operator drilled 24-inch borehole to 531’ and set 481’ of 18 5/8” surface casing. Surface casing was cemented to the surface by the displacement method on 8/23/16. 50 bbls of cement was circulated to the surface. Full circulation through cement job. Operator drilled 17 ½-inch hole to 737’. Operator encountered coal mine void 633’-639’. Coal protective casing was set at 687’ and a cement basket was placed at 599’. Operator cemented 13 3/8” coal protective casing string on 8/24/2016. Coal protective casing was cemented to the surface by the displacement method. 15 bbls of cement was circulated to the surface. Operator currently drilling ahead @ 2,632’
2520626 Primary Facility 2016-09-08 Drilling/Alteration No Violations Noted Intermediate casing (9 5/8”) with CAP set and cemented on 9/2/16. 50 bbls cement circulated to the surface. CAP installed 1,350’ – 1,360’. CAP operated as designed. Operator ran segmented bond tool to verify CAP operation and evaluate cement job. Top hole portion of borehole drilled to 6,274’ TVD / TMD.

For data sources see[8]

References