If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26924 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.802419,"lon":-80.046825,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Greene Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 152262 | |
Farm/Lease Name: COMMONWEALTH 496 7H | |
License Status: Active | |
Spud Date: 09/13/2015 | |
Permit Date: 7/6/2015 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 39.802419 | |
Longitude: -80.046825 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2018-04 | Drill Cuttings (in Tons) RWC 810 | 118.93 Tons | LANDFILL | 100172 |
2018-04 | Drilling Fluid Waste (in Barrels) RWC 803 | 552.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 7.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-05 | Drill Cuttings (in Tons) RWC 810 | 241.19 Tons | LANDFILL | 100172 |
2018-05 | Drilling Fluid Waste (in Barrels) RWC 803 | 811.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-05 | Drilling Fluid Waste (in Barrels) RWC 803 | 503.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-06 | Drill Cuttings (in Tons) RWC 810 | 114.89 Tons | LANDFILL | 100172 |
2018-06 | Drilling Fluid Waste (in Barrels) RWC 803 | 1,135.78 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-06 | Drilling Fluid Waste (in Barrels) RWC 803 | 81.37 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-06 | Drilling Fluid Waste (in Barrels) RWC 803 | 46.25 Bbl | REUSE (AT WELL PAD) | |
2018-06 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 2.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-07 | Drill Cuttings (in Tons) RWC 810 | 74.54 Tons | LANDFILL | 100172 |
2018-07 | Drilling Fluid Waste (in Barrels) RWC 803 | 71.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-07 | Drilling Fluid Waste (in Barrels) RWC 803 | 90.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-07 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 7.50 Bbl | REUSE (AT WELL PAD) | |
2018-07 | Synthetic Liner Materials (in Tons) RWC 806 | 2.39 Tons | LANDFILL | 100172 |
2018-08 | Drill Cuttings (in Tons) RWC 810 | 129.80 Tons | LANDFILL | 100172 |
2018-08 | Drilling Fluid Waste (in Barrels) RWC 803 | 120.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-08 | Drilling Fluid Waste (in Barrels) RWC 803 | 32.90 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2018-08 | Drilling Fluid Waste (in Barrels) RWC 803 | 6.25 Bbl | REUSE (AT WELL PAD) | |
2018-08 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2018-08 | Synthetic Liner Materials (in Tons) RWC 806 | 0.39 Tons | LANDFILL | 100172 |
2018-08 | Synthetic Liner Materials (in Tons) RWC 806 | 1.26 Tons | LANDFILL | 100663 |
2018-09 | Drill Cuttings (in Tons) RWC 810 | 35.32 Tons | LANDFILL | 100172 |
2018-09 | Drilling Fluid Waste (in Barrels) RWC 803 | 51.42 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-09 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 42.87 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-09 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 13.75 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-11 | Drill Cuttings (in Tons) RWC 810 | 67.00 Tons | LANDFILL | 100172 |
2018-11 | Drill Cuttings (in Tons) RWC 810 | 7.80 Tons | LANDFILL | 100663 |
2018-11 | Drilling Fluid Waste (in Barrels) RWC 803 | 49.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-11 | Drilling Fluid Waste (in Barrels) RWC 803 | 27.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-11 | Drilling Fluid Waste (in Barrels) RWC 803 | 14.34 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2018-11 | Produced Fluid (in Tons) RWC 802 | 3.16 Tons | LANDFILL | 100172 |
2018-11 | Synthetic Liner Materials (in Tons) RWC 806 | 0.58 Tons | LANDFILL | 100663 |
2018-12 | Drill Cuttings (in Tons) RWC 810 | 113.34 Tons | LANDFILL | 100172 |
2018-12 | Drill Cuttings (in Tons) RWC 810 | 78.31 Tons | LANDFILL | 100663 |
2018-12 | Drilling Fluid Waste (in Barrels) RWC 803 | 82.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-12 | Drilling Fluid Waste (in Barrels) RWC 803 | 52.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-12 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 11.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-12 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 0.86 Tons | LANDFILL | 100663 |
2018-12 | Synthetic Liner Materials (in Tons) RWC 806 | 0.32 Tons | LANDFILL | 100172 |
2018-12 | Synthetic Liner Materials (in Tons) RWC 806 | 0.73 Tons | LANDFILL | 100663 |
2019-01 | Drill Cuttings (in Tons) RWC 810 | 130.08 Tons | LANDFILL | 100172 |
2019-01 | Drill Cuttings (in Tons) RWC 810 | 81.37 Tons | LANDFILL | 100663 |
2019-01 | Drilling Fluid Waste (in Barrels) RWC 803 | 41.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019-01 | Drilling Fluid Waste (in Barrels) RWC 803 | 93.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019-01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 12.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019-01 | Synthetic Liner Materials (in Tons) RWC 806 | 0.57 Tons | LANDFILL | 100663 |
2019-02 | Drill Cuttings (in Tons) RWC 810 | 123.87 Tons | LANDFILL | 100172 |
2019-02 | Drill Cuttings (in Tons) RWC 810 | 179.53 Tons | LANDFILL | 100663 |
2019-02 | Drilling Fluid Waste (in Barrels) RWC 803 | 28.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019-02 | Drilling Fluid Waste (in Barrels) RWC 803 | 34.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019-02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 6.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019-02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 13.75 Bbl | REUSE (AT WELL PAD) | |
2019-03 | Drilling Fluid Waste (in Barrels) RWC 803 | 69.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019-03 | Drilling Fluid Waste (in Barrels) RWC 803 | 24.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019-03 | Produced Fluid (in Barrels) RWC 802 | 15.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2398589 | Primary Facility | 07/07/2015 | Routine/Complete Inspection | No Violations Noted | |
2410909 | Primary Facility | 09/22/2015 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, Setting 30' conductor @ 40' today (9/22/2015). |
2421467 | Primary Facility | 09/11/2015 | Routine/Complete Inspection | No Violations Noted | On 09/11/15 at approximately 0830 hours I conducted a pre-op inspection of the Commonwealth 496 well site. All required documents were present. The Act 9 sign was present. All BMPs appeared to be in good working order. After my inspection I contacted Nick Staffieri to inform him that the pre-op had been conducted and that they were able to commence with their spuds. There were no violations noted at the time of inspection. |
2525297 | Primary Facility | 2016-09-22 | Routine/Complete Inspection | No Violations Noted | On 09/22/16 at approximately 1000 hours I conducted a routine complete inspection of the Commonwealth 496. The Act 9 sign was in place and all required documents were present at the site. The site was well stabilized and there were no signs of erosion observed at the time of inspection. There were no violations observed at the time of inspection. |
2549616 | Primary Facility | 2016-12-08 | Routine/Complete Inspection | No Violations Noted |
On 12/08/16 at approximately 1000 hours I conducted a routine complete inspection of the Commonwealth 496. The Act 9 sign was in place and all required documents were present at the site. The site was well stabilized and there were no signs of erosion observed at the time of inspection. There were no violations observed at the time of inspection. |
2567877 | Primary Facility | 2017-03-06 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. Along the left side of the access road an erosion rill was observed(see photographs). It is recommended that the rill be repaired once weather allows. The site overall was well vegetated and stable. There were no other signs of erosion of observed. The E&S controls appeared to be in good condition and functioning. There were no violations observed at the time of inspection. |
2582371 | Primary Facility | 2017-04-13 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. All BMPs appeared to be well-maintained. Seven spud wells were observed. There were no violations observed at the time of inspection. |
2623450 | Primary Facility | 2017-08-07 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The gate to the site was closed and locked. Vehicle tracks were present in the grass to the left of gate, bypassing it. The site was well vegetated and there were no signs of erosion observed. There were no violations observed at the time of inspection. |
2663860 | Primary Facility | 2017-11-16 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. Vehicle tracks bypassing the gate were observed. The site overall was well vegetated. The wells had previously been SPUD. There were no violations observed at the time of inspection. |
2751658 | Primary Facility | 2018-06-04 | Incident- Response to Accident or Event | In Compliance with Policy | On 06/01/18 at approximately 20:15 hours Chevron reported a spill of 5 to 10 gallons of soap. On 06/04/18 I, along with WQS Adam Ofstun, conducted an incident response inspection. The spill had been remediated by the time of inspection. The spill was addressed in compliance with the spill policy. |
2853241 | Primary Facility | 2019-03-13 | Drilling/Alteration | No Violations Noted | TTR @ 19,016' with no reported issues. Operator reports planned TD of 21,173' with cementing of 5 1/2" expected late Saturday. On site inspection showed no apparent violations. NOVIO |
For data sources see[6]