X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-25545"

m
m
Line 225: Line 225:
 
|-
 
|-
 
| 2011
 
| 2011
| [[ATLAS RESOURCES LLC]]
+
| [[CHEVRON APPALACHIA LLC]]
 
| style="text-align: right;" | 669,763.00
 
| style="text-align: right;" | 669,763.00
 
| style="text-align: right;" | 194
 
| style="text-align: right;" | 194
Line 315: Line 315:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 320: Line 321:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-S02
+
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 1,365.00 Bbl
+
| style="text-align: right;" | 4,745.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 301353
+
| WMGR123SW001
 
|-
 
|-
| 2010-S02
+
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 1,500.00 Bbl
 
| style="text-align: right;" | 1,500.00 Bbl
Line 332: Line 335:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-S02
+
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 4,745.00 Bbl
+
| style="text-align: right;" | 1,365.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW001
+
| 301353
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 3,888.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-2-3995
 
|-
 
|-
| 2011-S01
+
| 2011
| Drilling Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 2,820.00 Bbl
+
| Produced Fluid (in Barrels)
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 1,129.00 Bbl
| PA0091472
+
| REUSE OTHER THAN ROAD SPREADING
 +
|  
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 440.00 Bbl
 
| style="text-align: right;" | 440.00 Bbl
Line 350: Line 363:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-S01
+
| 2011
| Drilling Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 2,840.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
|-
 
| 2011-S01
 
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 4,527.00 Bbl
+
| style="text-align: right;" | 16,729.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2011-S02
+
| 2011
| Fracing Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 12,202.50 Bbl
+
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 2,840.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2011-S02
+
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 28,830.00 Bbl
 
| style="text-align: right;" | 28,830.00 Bbl
Line 374: Line 384:
 
|  
 
|  
 
|-
 
|-
| 2011-S02
+
| 2011
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 3,888.00 Bbl
+
| Drilling Fluid Waste (in Barrels)
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 2,820.00 Bbl
| 34-121-2-3995
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 
|-
 
|-
| 2011-S02
+
| 2012
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 1,129.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 30.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2012-S01
+
| 2012
| Fracing Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 30.00 Bbl
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 3,632.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2012-S01
+
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 865.00 Bbl
 
| style="text-align: right;" | 865.00 Bbl
Line 398: Line 412:
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2012-S01
+
| 2013
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 1,810.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2012-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,822.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2013-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,275.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2013-S02
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 60.00 Bbl
 
| style="text-align: right;" | 60.00 Bbl
Line 422: Line 419:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2013-S02
+
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,440.00 Bbl
+
| style="text-align: right;" | 2,715.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-S01
+
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,042.50 Bbl
+
| style="text-align: right;" | 1,866.50 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-S02
+
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 35.00 Bbl
 
| style="text-align: right;" | 35.00 Bbl
Line 440: Line 440:
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2014-S02
+
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 824.00 Bbl
+
| style="text-align: right;" | 1,280.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-S01
+
| 2016
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 655.00 Bbl
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 810.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-S02
+
| 2016
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 625.00 Bbl
+
| Waste Water Treatment Sludge (in Tons) RWC 804
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 5.83 Tons
|  
+
| STORAGE PENDING DISPOSAL OR REUSE
 +
| MID0209062814
 
|-
 
|-
| 2016-S01
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 717.50 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-S02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 855.11 Bbl
 
| style="text-align: right;" | 855.11 Bbl
Line 470: Line 468:
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2016-S02
+
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 18.76 Bbl
 
| style="text-align: right;" | 18.76 Bbl
Line 476: Line 475:
 
| 101532
 
| 101532
 
|-
 
|-
| 2016-S02
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 92.50 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-S02
 
| Waste Water Treatment Sludge (in Tons) RWC 804
 
| style="text-align: right;" | 5.83 Tons
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| MID0209062814
 
|-
 
| 2017-M01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 57.50 Bbl
+
| style="text-align: right;" | 2,975.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
|-
 
| 2017-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 126.43 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
|-
 
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 65.00 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-M04
+
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 62.50 Bbl
+
| style="text-align: right;" | 107.50 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,730.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 60.00 Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-157-25511
 
| 34-157-25511
 
|-
 
|-
| 2017-M06
+
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 60.00 Bbl
+
| style="text-align: right;" | 243.93 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2017-M07
+
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 47.50 Bbl
+
| style="text-align: right;" | 250.00 Bbl
| INJECTION DISPOSAL WELL
 
| 34-157-25511
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 60.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 57.50 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.50 Bbl
 
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2017-M12
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 147.50 Bbl
+
| style="text-align: right;" | 550.50 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2018-M01
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 164.50 Bbl
+
| style="text-align: right;" | 281.00 Bbl
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M02
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 56.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 57.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 57.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 57.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 115.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 105.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M03
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 120.00 Bbl
+
| style="text-align: right;" | 175.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  

Revision as of 12:24, 19 August 2019

Well Details

Well ID: 37-059-25545
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Cumberland Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147872
Farm/Lease Name: BUDAY UNIT 8H
License Status: Active
Spud Date: 2010-10-13
Permit Date: 2010-07-27
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.911150
Longitude: -79.990139

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-05-06 2011-05-06 8086.0 4787754.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Viscosifier
Breaker
Biocide
Scale Inhibitor
Used to open perfs
Sand Proppant 100.0 8.98
Friction Reducer Ethylene Glycol 107-21-1 30.0 0.006
The chemical additive information
reported herein is identical
to the information
reported by Chevron to the
Pennsylvania Department of Environmental Protection.
None None
Iron Control Agent Ammonium Sulfate 7783-20-2 30.0 0.0006
Hydrotreated Light Distillite 64742-47-8 30.0 0.03
Dibromoacetonitrile 3252-43-5 5.0 0.001
1,1-Dibromo-3-nitrilopropionamide 10222-01-2 30.0 0.006
Ethylene Glycol 107-21-1 60.0 None
Hydrochloric Acid 7647-01-0 32.0 1.347
Carboxymethylhydroxyporoyl guar bln Mixture 100.0 0.026
Polyethylene Glycol 25322-68-3 60.0 0.012
Ethylene Glycol 107-21-1 30.0 0.006
Water Carrier/Base Fluid 100.0 91.02

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 669,763.00 194 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 719,707.00 366 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 484,387.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 361,403.00 334 0.00 0 70.00 153
2015 CHEVRON APPALACHIA LLC 257,658.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 271,964.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 220,927.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 195,412.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 44,150.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 ATLAS RESOURCES LLC Drilling Fluid Waste (in Barrels) 4,745.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2010 ATLAS RESOURCES LLC Drilling Fluid Waste (in Barrels) 1,500.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 ATLAS RESOURCES LLC Drilling Fluid Waste (in Barrels) 1,365.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 3,888.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 1,129.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 16,729.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) 2,840.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 28,830.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) 2,820.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 30.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 3,632.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 865.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 60.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 2,715.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 1,866.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 35.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2015 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 1,280.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 810.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Waste Water Treatment Sludge (in Tons) RWC 804 5.83 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2016 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 855.11 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 18.76 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 2,975.00 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 107.50 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 243.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 250.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 550.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 281.00 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 175.00 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1940697 Primary Facility 2010-09-23 Routine/Complete Inspection No Violations Noted
1950564 Primary Facility 2011-02-16 Routine/Complete Inspection No Violations Noted Just Finished drilling
1975212 Primary Facility 2011-05-12 Routine/Complete Inspection No Violations Noted
1987024 Primary Facility 2011-04-25 Routine/Complete Inspection No Violations Noted
2001317 Primary Facility 2011-05-24 Routine/Complete Inspection No Violations Noted
2001319 Primary Facility 2011-05-25 Routine/Complete Inspection No Violations Noted
2001328 Primary Facility 2011-06-01 Routine/Complete Inspection No Violations Noted
2017347 Primary Facility 2011-11-03 Routine/Complete Inspection No Violations Noted The Department was at the above referenced Marcellus site to conduct a routine inspection. The two wells at the site have been fracked and are in production. The Department met with the Operator to discuss sample results and the pit on site were the liner was torn. The site is currently being restored. The Department will review the sample results and the final report and make a determination on this violation/pit leak.

For data sources see[7]

References