X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24672"

m
m
Line 104: Line 104:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 109: Line 110:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-M12
+
| 2018
| Drill Cuttings (in Tons) RWC 810
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 156.21 Tons
 
| LANDFILL
 
| 100172
 
|-
 
| 2018-M12
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 85.57 Tons
 
| LANDFILL
 
| 100663
 
|-
 
| 2018-M12
 
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 2,558.48 Bbl
 
| style="text-align: right;" | 2,558.48 Bbl
Line 127: Line 117:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2019-M01
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
| style="text-align: right;" | 39.50 Tons
+
| style="text-align: right;" | 156.21 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100172
 
| 100172
 
|-
 
|-
| 2019-M01
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
| style="text-align: right;" | 76.41 Tons
+
| style="text-align: right;" | 85.57 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100663
 
| 100663
 
|-
 
|-
| 2019-M01
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 4,239.65 Bbl
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 12.19 Bbl
| WMGR123SW005
 
|-
 
| 2019-M01
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 121.19 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2019-M01
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 29.44 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2019-M02
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 49.05 Tons
 
| LANDFILL
 
| 100172
 
|-
 
| 2019-M02
 
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
| style="text-align: right;" | 82.36 Tons
+
| style="text-align: right;" | 158.77 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100663
 
| 100663
 
|-
 
|-
| 2019-M02
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 784.44 Bbl
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 32.23 Bbl
| WMGR123SW005
+
| REUSE (AT WELL PAD)
 +
|  
 
|-
 
|-
| 2019-M02
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 182.07 Bbl
+
| Drilling Fluid Waste (in Tons) RWC 803
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 3.03 Tons
| WMGR123SW019
+
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 
|-
 
|-
| 2019-M02
+
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 12.22 Bbl
 
| style="text-align: right;" | 12.22 Bbl
Line 187: Line 166:
 
| 101532
 
| 101532
 
|-
 
|-
| 2019-M02
+
| 2019
| Drilling Fluid Waste (in Tons) RWC 803
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 3.03 Tons
 
| RESIDUAL WASTE TRANSFER FACILITY
 
| 101532
 
|-
 
| 2019-M02
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
Line 199: Line 173:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2019-M02
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 12.19 Bbl
+
| Produced Fluid (in Barrels) RWC 802
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 12.22 Bbl
| WMGR123SW019
+
| REUSE (AT WELL PAD)
 +
|  
 
|-
 
|-
| 2019-M02
+
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 25.56 Bbl
+
| style="text-align: right;" | 29.44 Bbl
| REUSE (AT WELL PAD)
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2019-M02
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 12.22 Bbl
+
| Drill Cuttings (in Tons) RWC 810
| REUSE (AT WELL PAD)
+
| style="text-align: right;" | 88.55 Tons
|  
+
| LANDFILL
 +
| 100172
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 303.26 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 
|-
 
|-
| 2019-M03
+
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 673.33 Bbl
+
| style="text-align: right;" | 5,697.42 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
|-
 
| 2019-M03
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 6.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
 
|-
 
|-
 
|}
 
|}

Revision as of 05:21, 21 August 2019

Well Details

Well ID: 37-051-24672
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: German Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 155005
Farm/Lease Name: KOVACH B M02H
License Status: Active
Spud Date: 2018-10-23
Permit Date: 2018-08-08
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.918972
Longitude: -79.854786

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) RWC 803 2,558.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 CHEVRON APPALACHIA LLC Drill Cuttings (in Tons) RWC 810 156.21 Tons LANDFILL 100172
2018 CHEVRON APPALACHIA LLC Drill Cuttings (in Tons) RWC 810 85.57 Tons LANDFILL 100663
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 12.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CHEVRON APPALACHIA LLC Drill Cuttings (in Tons) RWC 810 158.77 Tons LANDFILL 100663
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 32.23 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Tons) RWC 803 3.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2019 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) RWC 803 12.22 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 12.22 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 29.44 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Drill Cuttings (in Tons) RWC 810 88.55 Tons LANDFILL 100172
2019 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) RWC 803 303.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) RWC 803 5,697.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2760113 Primary Facility 2018-08-01 Incident- Response to Accident or Event No Violations Noted On 07/31/18 Chevron notified the Department that heavy rains had caused BMP failures at the site.

On 08/01/18 Chevron provided the Department rain gauge data showing the site received 1.32 inches of rain between 1515 and 1530 hours.

On 08/01/18 at approximately 0900 hours I conducted an incident response inspection. Sediment basin #1 had received sediment, but still had remaining volume and appeared to be structurally sound. The diversion channel leading to the sediment basin had been over run and erosion was present on the north side of the channel. The erosion channel flowed to the basin and no impacts outside the LOD were observed.

Sediment detention basin #1 also received a large amount of sediment, but still had remaining volume and appeared to be structurally sound.

On the east side of the site sediment laden water was observed leaving the LOD between the topsoil stockpile and access road slope. Erosion was also observed within the LOD at this location. At the time of inspection Chevron was repair

2767278 Primary Facility 2018-08-23 Compliance Evaluation No Violations Noted On 08/23/18 at approximately 0845 hours I met with representatives of Chevron to discuss redline changes. Violations observed on 08/01/18 (inspection ID#2759849) had been corrected. Redline approval was granted for Chevron to add additional silt sock and hay bales and to use stacked silt sock to prevent further sediment discharges. The E&S plans were also redlined to reflect the installed position of a key drain near the site entrance.

There were no violations observed at the time of inspection.

2774113 Primary Facility 2018-09-11 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. Heavy rainfall had occurred in the area prior to inspection. Site BMPs were functioning at the time of inspection and there were no discharges off of site. The well pad was being brought to grade at the time of inspection. There were no violations observed at the time of inspection.
2796296 Primary Facility 2018-10-17 Preoperation Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. E & S BMPs were installed as designed and were functioning. Erosion matting, seed, and mulch were being applied at the time of inspection. A minor slip into the sediment basin was being repaired.

Redline approval was granted extending a cross culvert and adding a rip rap apron and shifting the drainage channel. Excess soil was stock piled off the south east corner of the pad, which prompted the extension of the cross culvert.

Chevron may commence drilling activities at their discretion.

2799818 Primary Facility 2018-11-07 Drilling/Alteration No Violations Noted Operator reports well spud 10/23/18. 40' of 30" csg set in a 36" hole with cmt poured down backside of dry hole. On site inspection shows no apparent violation.
2836996 Primary Facility 2019-02-07 Drilling/Alteration No Violations Noted The rig was shut down at a depth of 3199 for a crew training session at the time of this inspection. I conducted an entire site inspection with the DSM in charge and all equipment looked ok. The well permit was displayed and all log information was present and up to date.

For data sources see[6]

References