X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24621

Well Details

Well ID: 37-051-24621
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Luzerne Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 152396
Farm/Lease Name: STEWART
License Status: Active
Spud Date: 2015-09-01
Permit Date: 2015-04-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.962961
Longitude: -79.946956

For data sources see[1][2][3]

Well History

Date Event
Deviated
2015-04-23 New Permit Application
2015-09-02 Performed Spud Operation
2016-05-26 New Permit Application
2017-08-17 MOD
2018-01-26 MOD
2019-01-31 Drilling Completion
2019-03-26 Perforation
2019-03-26 Performed Stage 1 of Stimulation
2019-03-28 Perforation
2019-03-29 Perforation
2019-03-30 Perforation
2019-03-31 Perforation
2019-04-01 Perforation
2019-04-02 Perforation
2019-04-03 Perforation
2019-04-04 Perforation
2019-04-04 Performed Stage 16 of Stimulation
2019-04-05 Perforation
2019-04-06 Perforation
2019-04-07 Perforation
2019-04-08 Perforation
2019-04-08 Performed Stage 30 of Stimulation
2019-04-09 Perforation
2019-04-10 Perforation
2019-04-11 Perforation
2019-04-12 Perforation
2019-04-13 Perforation
2019-04-13 Performed Stage 46 of Stimulation
2019-04-14 Perforation
2019-04-15 Perforation
2019-04-16 Perforation
2019-04-17 Perforation
2019-04-19 Perforation
2019-04-20 Perforation
2019-04-21 Perforation
2019-04-21 Performed Stage 62 of Stimulation
2019-04-22 Perforation
2019-04-23 Perforation
2019-04-24 Perforation
2019-04-25 Perforation
2019-04-26 Perforation
2019-04-26 Performed Stage 71 of Stimulation
2020-01-13 Deivated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-26 2019-04-26 8,118 28,936,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other Chemical(s) Listed Above See Trade Name(s) List Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000736298 2010.85
Oleic Acid Diethanolamide 93-83-4 3 0.0022089 6032.53
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000404948 1105.92
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.0022089 6032.53
Sodium Chloride 7647-14-5 15 0.0110445 30162.7
Ammonium Chloride 12125-02-9 2 0.0014726 4021.69
Formaldehyde 50-00-0 1 0.00000810 22.118
Methanol 67-56-1 5 0.00004049 110.592
Water 7732-18-5 55 0.0404964 110596
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0184075 50271.1
Ethylene glycol 107-21-1 40 0.00535467 14623.7
Polyethylene glycol 25322-68-3 50 0.00533018 14556.8
Thiourea 62-56-6 1 0.00000810 22.118
Ammonium glycolate 35249-89-9 20 0.00418077 11417.8
Hydroxyacetic acid 79-14-1 5 0.00104519 2854.44
Water 7732-18-5 30 0.00319811 8734.09
Sand UPP Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 10.415 28,443,500.0
I7L UPP Iron Control Agent Hydroxyacetic acid 79-14-1 5 0.00104519 2854.44
Ammonium glycolate 35249-89-9 20 0.00418077 11417.8
Ethylene Glycol 107-21-1 20 0.00418077 11417.8
FR-11 UPP Friction reducer Alcohol Ethoxylate Surfactants 68551-12-2 3 0.0022089 6032.53
Ammonium Chloride 12125-02-9 2 0.0014726 4021.69
Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000736298 2010.85
Oleic Acid Diethanolamide 93-83-4 3 0.0022089 6032.53
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0184075 50271.1
Water 7732-18-5 55 0.0404964 110596
Sodium Chloride 7647-14-5 15 0.0110445 30162.7
CHEMPLEX-Polymer_00019 Trade Secret 25 0.0184075 50271.1
HCL Acid (7.5%) UPP Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0775984 211923
Unihib G UPP Acid inhibitor Methanol 67-56-1 5 0.00004049 110.592
Thiourea 62-56-6 1 0.00000810 22.118
Butyl diglycol 112-34-5 75 0.000607422 1658.88
Formaldehyde 50-00-0 1 0.00000810 22.118
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000404948 1105.92
K-BAC 1020 UPP Biocide Water 7732-18-5 30 0.00319811 8734.09
Polyethylene glycol 25322-68-3 50 0.00533018 14556.8
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 21 0.00223867 6113.86
Scale Hib PE-18 UPP Scale Inhibitor Proprietary Scale Inhibitor Proprietary 30 0.004016 10967.8
Ethylene glycol 107-21-1 40 0.00535467 14623.7
Water Chevron Carrier/Base Fluid Water 7732-18-5 100 88.4205 241,478,000.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2019-03-26 1 Ottawa 774,743 10,221 7,008
2019-04-04 16 Ottawa 774,743 9,554 6,037
2019-04-08 30 Ottawa 774,743 9,524 7,219
2019-04-13 46 Ottawa 774,743 9,804 7,360
2019-04-21 62 Ottawa 774,743 8,520 6,037
2019-04-26 71 Ottawa 774,743 8,290 8,725

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 1,617,424.00 147 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CHEVRON APPALACHIA LLC Waste Water Treatment Sludge 2,421.89 Tons LANDFILL 100172
2018 CHEVRON APPALACHIA LLC Drill Cuttings 492.17 Tons LANDFILL 100172
2018 CHEVRON APPALACHIA LLC Drilling Fluid Waste 932.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 88.96 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Drill Cuttings 104.99 Tons LANDFILL 100663
2018 CHEVRON APPALACHIA LLC Drilling Fluid Waste 31.43 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Drilling Fluid Waste 744.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 117.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 16.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 CHEVRON APPALACHIA LLC Synthetic Liner Materials 0.53 Tons LANDFILL 100172
2018 CHEVRON APPALACHIA LLC Synthetic Liner Materials 6.71 Tons LANDFILL 100663
2018 CHEVRON APPALACHIA LLC Drilling Fluid Waste 7.04 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2019 CHEVRON APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 4.77 Tons LANDFILL 100663
2019 CHEVRON APPALACHIA LLC Drilling Fluid Waste 12.50 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Waste Water Treatment Sludge 2.73 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 8.33 Bbl INJECTION DISPOSAL WELL 34-121-23995
2019 CHEVRON APPALACHIA LLC Produced Fluid 1,872.37 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Drilling Fluid Waste 43.36 Tons LANDFILL 100172
2019 CHEVRON APPALACHIA LLC Produced Fluid 105.64 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CHEVRON APPALACHIA LLC Drill Cuttings 292.31 Tons LANDFILL 100663
2019 CHEVRON APPALACHIA LLC Drill Cuttings 94.25 Tons LANDFILL 100172
2019 CHEVRON APPALACHIA LLC Produced Fluid 2,083.49 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 249.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 20.13 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2019 CHEVRON APPALACHIA LLC Synthetic Liner Materials 15.93 Tons LANDFILL 100663
2019 CHEVRON APPALACHIA LLC Drilling Fluid Waste 411.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 2,193.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 199.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 7.14 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2019 CHEVRON APPALACHIA LLC Soil Contaminated by Oil 4.77 Tons LANDFILL 100663
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 7.86 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Synthetic Liner Materials 0.26 Tons LANDFILL 100172
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 676.74 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2407185 Primary Facility 2015-09-02 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Setting 30"conductor @ 40' today (9/1/2015).
2408923 Primary Facility 2015-09-15 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Drilling on air @ 348' ( TD). Setting Water Protection Casing and cementing tonight (9/13/2015).
2408940 Primary Facility 2015-09-16 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Drilling on air @ 554' ( TD). Setting Coal Protection Casing and cementing tonight (9/15/2015).
2421226 Primary Facility 2015-09-01 Routine/Complete Inspection No Violations Noted
2581130 Primary Facility 2017-04-11 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site overall was well vegetated but there were locations along the access road that could use additional seeding. Small erosion rills were observed in several locations throughout the site. An erosion channel was observed in the swale between the AST pad. The wells had previously been spud, but additional drilling has not yet occurred.
2611987 Primary Facility 2017-06-26 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site overall was well vegetated, but some erosion was observed in the swale between the AST pad and the access road. Six SPUD wells were present at the site.
2638221 Primary Facility 2017-09-20 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated. A small erosion rill was observed between the AST pad and stockpile. The wells on the site had been previously SPUD.
2658466 Primary Facility 2017-11-06 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and stable. The wells on site had been SPUD, but not drilled to TD. The wells are currently on inactive status. There were no violations observed at the time of inspection.
2686502 Primary Facility 2018-01-19 Routine/Complete Inspection No Violations Noted Inactive Status was approved (6/17/2016).Pending Permit issue being address now.
2752608 Primary Facility 2018-07-17 Drilling/Alteration No Violations Noted Highlands Rig #14 currently TTR @ 6735'. All seven wells on location are in stages of air rig build into the curve with 8 3/4" hole, operator will then load hole with mud and move off air. Fluid rig will follow to complete lateral. Location having issues with gas production above mine and are using cement pill plugs before drilling into mine to reduce or eliminate gas migration from uphole. On site inspection found no apparent violations. NOVIO
2761368 Primary Facility 2018-08-07 Drilling/Alteration No Violations Noted Operator has set 9 5/8" csg and drilled 8 3/4" hole into the kick, prepped well for triple to move on location to finish lateral. On site inspection showed no apparent violations. NOVIO
2761374 Primary Facility 2018-08-07 Drilling/Alteration No Violations Noted Operator has set 9 5/8" csg and drilled 8 3/4" hole into the kick, prepped well for triple to move on location to finish lateral. On site inspection showed no apparent violations. NOVIO
2761382 Primary Facility 2018-08-07 Drilling/Alteration No Violations Noted Operator has set 9 5/8" csg and drilled 8 3/4" hole into the kick, prepped well for triple to move on location to finish lateral. On site inspection showed no apparent violations. NOVIO
2837639 Primary Facility 2019-02-08 Drilling/Alteration No Violations Noted The rig was in the process of rigging down and getting ready to lay the derrick down at the time of this inspection. All equipment on site looked ok.
2845964 Primary Facility 2019-02-15 Compliance Evaluation No Violations Noted On 11/06/18 an Oil based mud spill had occurred at the site and an NOV was issued.

On 02/15/19 at approximately 1015 hours I conducted a CEI at the site. The Act 9 sign was in place and all required documents were present at the site. The impacted soils had been remediated and all contaminated equipment had been cleaned and removed from the site. The violations have been corrected and there were no violations observed at the time of inspection.

For data sources see[9]

References