X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24467

Well Details

Well ID: 37-051-24467
Loading map...
County: Fayette
Municipality: Springhill Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147956
Farm/Lease Name: CHICO UNIT 3H
First Permit Date: 2011-09-19
Last Permit Date: 2011-09-19
Spud Date: 2011-10-05
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.746977
Longitude: -79.858477

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 292120.0 91.0 0.0 0.0 0.0 0.0
2013-2 391782.0 184.0 0.0 0.0 0.0 0.0
2014-1 252802.0 181.0 0.0 0.0 0.0 0.0
2014-2 323108.0 184.0 0.0 0.0 0.0 0.0
2015-02 42392.0 28.0 0.0 0.0 0.0 0.0
2015-01 38638.0 31.0 0.0 0.0 0.0 0.0
2015-03 43432.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-1 DRILLING FLUID WASTE 37.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 DRILLING FLUID WASTE 36.7 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 DRILL CUTTINGS 0.72 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2012-2 FRACING FLUID WASTE 164.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FLOWBACK FRACTURING SAND 4.9 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2013-1 FRACING FLUID WASTE 17.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FRACING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 4.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 FLOWBACK FRACTURING SAND 23.57 Tons LANDFILL 073 114 654 US ECOLOGY IDAHO, INC. GRAND VIEW ID
2013-2 PRODUCED FLUID 515.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 PRODUCED FLUID 70.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 45.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH
2014-2 PRODUCED FLUID 988.67 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2015137 2011-10-25 No Violations Noted HORIZONTAL MARCELLUS,RIG # 7 DRILLING AT 214' ON AIR. RUNNING WATER PROTECTION CASING AND CEMENTING TONIGHT.
2015142 2011-10-26 No Violations Noted HORIZONTAL MARCELLUS, RIG # 7 DRILLING @ 400' ON AIR. ALL LOOKS GOOD.
2015144 2011-10-27 No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 475' TD,RUNNING COAL PROTECTION CASING AND CEMENTING TODAY.
2025897 2011-11-21 No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 7233', MUDDED UP AND CAPPED,MOVING TO CHICO 2 - H .
2025907 2011-11-04 No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 6503' TODAY.
2025913 2011-10-29 No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 2772' ,RUNNING INTERMEDIATE CASING AND CEMENTING TODAY.
2065761 2011-10-25 No Violations Noted HORIZONTAL MARCELLUS, HIGHLANDS DRILLING ON AIR @ 214' (TD). RUNNING WATER PROTECTION CASING AND CEMENTING TODAY.
2065762 2011-10-28 No Violations Noted HORIZONTAL MARCELLUS, HIGHLANDS DRIILING ON AIR @ 444' ( TD). RUNNING COAL PROTECTION CASING AND CEMENTING TODAY.
2065790 2011-11-03 No Violations Noted HORIZONTAL MARCELLUS, HIGHLANDS DRILLING ON AIR @ 2680' (TD). RUNNING INTERMEDIATE CASING AND CEMENTING TONIGHT.
2065795 2011-11-18 No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 7233' (TD). LOADING HOLE WITH OIL BASE MUD AND CAPPING.
2065798 2011-11-21 No Violations Noted HORIZONTAL MARCELLUS, HIGHLANDS MOVING TO CHICO # 2 - H (11/20/2011).
2054955 2012-02-16 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 339 WAITING ON CORING TO BE COMPLETED. SET 2 -PLUGS TO (KOP) 7200'.
2054962 2012-02-02 No Violations Noted HORIZONTAL MARCELLUS,PATTERSON # 339 MOVING ONTO LOCATION THIS WEEK.
2065803 2012-02-22 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 11,575' (TD). RUNNING 51/2" PROD. CASING AND CEMENTING TONIGHT.
2065807 2012-02-23 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 339 WALKING OVER TO CHICO # 2 - H.
2075011 2012-06-12 In Compliance with Policy Operator performed the proper spill requirements in compliance with the current spill policy.
2105003 2012-10-04 No Violations Noted The three wells at the site have been drilled. All three wells were labeled, but well 1H has the wrong permit number on its label. The 1H label should read 051-24490 and it reads 051-24465 now. This should be changed to reflect the correct well permit number. I understand the three wells are scheduled to be fracked late this fall.

Three pits were on the site and were all full of water. All three had the required over 2 foot of freeboard. There were three sed traps on the site. All traps looked to be functioning. All the E&S controls looked to be in place and were functioning.


2124996 2012-12-11 No Violations Noted ID sign up, wells labeled, E&S in place and functioning.
2184883 2013-07-18 No Violations Noted Site restoration extension requested by operator until 12/13/13. Site stable and 90% reclaimed at this time. Request approved.
2357540 2015-04-01 No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been restored as outlined in the PCSM plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

For data sources see[3]

References