X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625113013000

Well Details

Well ID: 0625113013000
Loading map...
Location: 00/13-30-062-11W5/0
Location Alias: 00/13-30-62-11 W5M
Location Alias 2: 00/13-30-062-11 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 11
Section: 30
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCKS 13-30-62-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0151534
License Date: 1992-01-28
License Status: Suspension
Spud Date: 1992-02-12
Final Drill Date: 1992-03-01
Well Total Depth: 2763.00 m
Surface Hole Latitude: 54.396222
Surface Hole Longitude: -115.646173

For data sources see[1][2]

Well History

Date Event
1992-01-28 Obtained License
1992-02-12 Well Log Performed
1992-02-13 Surface Casing Operation Performed
1992-02-17 Drill Stem Test Performed
1992-02-18 Drill Stem Test Performed
1992-03-01 Finished Drilling
1992-03-01 Well Mode changed to Drilled and Cased
1992-03-02 Well Log Performed
1992-03-04 Production Casing Operation Performed
1992-03-04 Rig Released
1992-03-27 Perforation Treatment Performed - Jet Perforation
1992-03-27 Well Log Performed
1992-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-05 Well Log Performed
1992-04-06 Well Log Performed
1992-04-07 Perforation Treatment Performed - Cement Squeeze
1992-05-01 Well Began Production
1992-05-01 Well Fluid changed to Crude Oil
1992-05-01 Well Mode changed to Pumping
1997-09-28 Perforation Treatment Performed - Jet Perforation
1997-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-01 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-03-27 Perforation 2719.00 2719.80 14
1992-03-27 Perforation 2720.50 2722.00 14
1992-03-27 Perforation 2727.50 2728.50 14
1992-03-27 Perforation 2731.00 2733.20 14
1992-03-31 Acid Treatment 2719.00 2733.20 0
1992-04-01 Acid Treatment 2719.00 2733.20 0
1992-04-07 Cement Squeeze 2719.00 2728.50 0
1997-09-28 Perforation 2719.00 2722.00 18
1997-09-28 Perforation 2727.50 2728.50 18
1997-09-28 Perforation 2737.00 2740.00 18
1997-09-30 Acid Treatment 2737.00 2740.00 0
1997-10-01 Acid Treatment 2719.00 2733.20 0
1997-12-01 Cement Squeeze 2719.00 2728.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5361 0.0 0.0 0.0
1993 8307 0.0 0.0 0.0
1994 8293 0.0 0.0 0.0
1995 8541 0.0 0.0 0.0
1996 8591 0.0 0.0 0.0
1997 7143 0.0 0.0 0.0
1998 8019 0.0 0.0 0.0
1999 8278 0.0 0.0 0.0
2000 6815 0.0 0.0 0.0
2001 8662 0.0 0.0 0.0
2002 8751 0.0 0.0 0.0
2003 8658 0.0 0.0 0.0
2004 8047 0.0 0.0 0.0
2005 8397 0.0 0.0 0.0
2006 8244 0.0 0.0 0.0
2007 8566 0.0 0.0 0.0
2008 8547 0.0 0.0 0.0
2009 4479 0.0 0.0 0.0
2010 8461 0.0 0.0 0.0
2011 8699 0.0 0.0 0.0
2012 8422 0.0 0.0 0.0
2013 7975 0.0 0.0 0.0
2014 8420 0.0 0.0 0.0
2015 8051 0.0 0.0 0.0
2016 8714 0.0 0.0 0.0
2017 6623 0.0 0.0 0.0

For data sources see[5]

References