X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24422

Well Details

Well ID: 37-051-24422
Loading map...
County: Fayette
Municipality: North Union Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148935
Farm/Lease Name: MUTNANSKY UNIT 11H
First Permit Date: 2011-01-28
Last Permit Date: 2011-01-28
Spud Date: 2011-04-01
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.945838
Longitude: -79.719947

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 60817.0 30.0 0.0 0.0 0.0 0.0
2012-2 290003.0 184.0 0.0 0.0 0.0 0.0
2013-1 180193.0 181.0 0.0 0.0 0.0 0.0
2013-2 163561.0 184.0 0.0 0.0 0.0 0.0
2014-1 113799.0 181.0 0.0 0.0 0.0 0.0
2014-2 106951.0 153.0 0.0 0.0 0.0 0.0
2015-02 12753.0 28.0 0.0 0.0 0.0 0.0
2015-01 15721.0 31.0 0.0 0.0 0.0 0.0
2015-03 16044.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-2 DRILLING FLUID WASTE 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-2 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 FRACING FLUID WASTE 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 FRACING FLUID WASTE 15.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 FRACING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 DRILL CUTTINGS 0.07 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2012-2 FRACING FLUID WASTE 629.7 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-2 FRACING FLUID WASTE 75.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 580.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-2 PRODUCED FLUID 590.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 499.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 16.25 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH
2014-2 PRODUCED FLUID 241.25 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1961157 2011-03-28 No Violations Noted
1970547 2011-05-03 No Violations Noted
1973589 2011-05-17 No Violations Noted
1979126 2011-06-08 No Violations Noted
1984096 2011-06-03 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. RUNNING 8 5/8" PIPE TODAY,CEMENTING TONIGHT. MOVING TO MUTNANSKY 12-H (6/4/2011).
1984131 2011-05-30 No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS IN GOOD CONDITION. SETTING COAL STRING @ 401' AND CEMENTING TONIGHT.
1984134 2011-05-27 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SETTING SURFACE CASING @ 249' TODAY AND CEMENTING TONIGHT.
1984138 2011-04-01 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SETTING CONDUCTOR @ 30'.
1991492 2011-07-28 No Violations Noted
1995658 2011-08-15 No Violations Noted
2005029 2011-08-19 No Violations Noted HORIZONTAL MARCELLUS, E&S & PITS IN GOOD CONDITION. CROWN # 5 MOVING ONTO MUTNANSKY 11 - H TODAY.
2005036 2011-08-24 No Violations Noted HORIZONTAL MARCELLUS, E&S & PITS IN GOOD CONDITION. CROWN # 5 TD @ 7107' .MUDDING UP AND CAPPED (8/24/2011).
2015130 2011-10-14 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON - 325 DRILLING ON (MUTNANSKY 11- H )ON FLUID @ 8096' .
2017346 2011-10-06 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON -324 RIGGING UP ON MUTNANSKY 11 - H.
2017349 2011-10-28 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON - 324 DRILLING ON FLUID @ 10,973' TODAY ,EXSPECTING TO (TD) TONIGHT @ 11, 973' , PLANNING TO RUN PROD. CASING LATE TONIGHT AND CEMENTING SAT. MORNING.
2144423 2013-03-01 No Violations Noted Site ID sign in place, E&S, PPC, permits in box. Site mostly restored, wells labeled, tanks in containment. Some silt fence in field remaining from previous sed trap removal. No leaks observed today.
2223547 2013-11-20 No Violations Noted On 11/20/2013, the Department performed an Notice of Termination inspection at the site of Chevron Appalachiaï¾’s Mutnansky Unit 9, 10, 11, 12H well site in North Union Twp., Fayette County. The ESX10-051-0011 is the site permit being inspected for the N.O.T.

There was an Act 9 site ID sign up at the entrance of the access road. The well permits, E&S plan, and PPC plan were located in the box. The access road was in good shape and was gated half way to the site.

The site has been restored. The vegetation covering the reclaimed area looked to be in good shape. Drainage issues in the lower field had been addressed and looked to be working.

The pad area is now fenced off and access to the pad is locked.

The four wells on site were labeled. There are also four tanks in containment and four heater/separator units on site. I did not observe any leaks on this date.

All drilling equipment and supplies not needed for production have been removed from the site.

The N.O.T. has been approved.

2373086 2015-05-15 No Violations Noted On 05/15/15 at approximately 1130 hours I conducted a routine complete inspection of the Mutnansky Unit. The site was gated

For data sources see[3]

References