X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between pages "37-051-24422" and "0534063608000"

m
 
m
 
Line 2: Line 2:
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
| Well ID: 37-051-24422
+
| Well ID: 0534063608000
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.945838, -79.719947 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.619652, -110.748634 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Fayette County, Pennsylvania|Fayette]]
+
| Location: 00/08-36-053-06W4/0
 
|-
 
|-
| Municipality: [[North Union Township, Fayette County, Pennsylvania|North Union Township]]
+
| Location Alias: 00/08-36-53-06 W4M
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC]]
+
| Location Alias 2: 00/08-36-053-06 W4/00
 
|-
 
|-
| Well Pad ID: [[148935|148935]]
+
| Country: Canada
 
|-
 
|-
| Farm/Lease Name: MUTNANSKY UNIT 11H
+
| Province: Alberta
 
|-
 
|-
| First Permit Date: 2011-01-28
+
| Township: 053
 
|-
 
|-
| Last Permit Date: 2011-01-28
+
| Meridian: 4
 
|-
 
|-
| Spud Date: 2011-04-01
+
| Range: 06
 
|-
 
|-
| Unconventional: Yes
+
| Section: 36
 
|-
 
|-
| Horizontal: Yes
+
| County/Municipality: [[County of Vermilion River,_Alberta|County of Vermilion River]]
 
|-
 
|-
| Well Status: ACTIVE
+
| Well Name: NORCEN LINDBERGH 8-36-53-6
 
|-
 
|-
| Violations: 0
+
| Operator Name: [[Canadian Natural Resources Limited]]
 
|-
 
|-
| Latitude: 39.945838
+
| License Number: 0190893
 
|-
 
|-
| Longitude: -79.719947
+
| License Date: 1996-08-28
 
|-
 
|-
|}
+
| License Status: RecCertified
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2010-2
+
| Spud Date: 1996-09-14
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| Final Drill Date: 1996-09-18
 
|-
 
|-
| 2010-2
+
| Well Total Depth: 694.00 m
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| Surface Hole Latitude: 53.619652
 
|-
 
|-
| 2010-2
+
| Surface Hole Longitude: -110.748634
| style="text-align:right;" | 0.0
+
|}
| style="text-align:right;" | 0.0
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 0.0
+
| title = General Well Data File - Licensing Data
| style="text-align:right;" | 0.0
+
|publisher = [[Alberta Energy Regulator]]
| style="text-align:right;" | 0.0
+
| date = 2020-04-22
| style="text-align:right;" | 0.0
+
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
 +
| 1996-08-28
 +
| Obtained License
 
|-
 
|-
| 2010-2
+
| 1996-09-15
| style="text-align:right;" | 0.0
+
| Surface Casing Operation Performed
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 1996-09-16
 +
| Direction Drilling Operation Performed - Deviate
 
|-
 
|-
| 2011-1
+
| 1996-09-18
| style="text-align:right;" | 0.0
+
| Finished Drilling
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 1996-09-18
 +
| Well Log Performed
 
|-
 
|-
| 2011-1
+
| 1996-09-18
| style="text-align:right;" | 0.0
+
| Well Mode changed to Drilled and Cased
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 1996-09-20
 +
| Production Casing Operation Performed
 
|-
 
|-
| 2011-1
+
| 1996-09-20
| style="text-align:right;" | 0.0
+
| Rig Released
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 1996-10-21
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| 2011-2
+
| 1996-10-22
| style="text-align:right;" | 0.0
+
| Well Log Performed
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 1997-01-18
 +
| Well Began Production
 
|-
 
|-
| 2011-2
+
| 1997-01-18
| style="text-align:right;" | 0.0
+
| Well Fluid changed to Gas
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 1997-01-18
 +
| Well Mode changed to Flowing
 
|-
 
|-
| 2012-1
+
| 2000-09-18
| style="text-align:right;" | 60817.0
+
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2000-09-18
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| 2012-2
+
| 2000-09-18
| style="text-align:right;" | 290003.0
+
| Plug Back Performed
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2000-09-18
 +
| Well Fluid changed to Gas
 
|-
 
|-
| 2013-1
+
| 2000-09-18
| style="text-align:right;" | 180193.0
+
| Well Log Performed
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2000-09-18
 +
| Well Mode changed to Abandoned Zone
 
|-
 
|-
| 2013-2
+
| 2004-06-20
| style="text-align:right;" | 163561.0
+
| Perforation Treatment Performed - Cement Squeeze
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2004-06-20
 +
| Plug Back Performed
 
|-
 
|-
| 2014-1
+
| 2004-07-05
| style="text-align:right;" | 113799.0
+
| Perforation Treatment Performed - Cement Plug
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2004-07-14
 +
| Well Abandoned
 
|-
 
|-
| 2014-2
+
|}
| style="text-align:right;" | 106951.0
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 153.0
+
| title = General Well Data File
| style="text-align:right;" | 0.0
+
|publisher = [[Alberta Energy Regulator]]
| style="text-align:right;" | 0.0
+
| date = 2020-04-22
| style="text-align:right;" | 0.0
+
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
| style="text-align:right;" | 0.0
+
| accessdate = 2020-04-29 }}</ref>
|-
+
<!--== Spud Table ==
|-
+
{| class="wikitable sortable" width="95%"
| 2015-02
+
!scope="col" | Spud Date
| style="text-align:right;" | 12753.0
+
!scope="col" | Contractor
| style="text-align:right;" | 28.0
+
!scope="col" style="text-align: right;" | Rig Number
| style="text-align:right;" | 0.0
+
!scope="col" style="text-align: right;" | New Projected Depth (m)
| style="text-align:right;" | 0.0
+
!scope="col" | Activity Type
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 15721.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|}-->
 +
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| 2015-03
+
| 1996-09-16
| style="text-align:right;" | 16044.0
+
| style="text-align: right;" | 141.00
| style="text-align:right;" | 31.0
+
| Deviate (5 - 79 degrees)
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title = General Well Data File - Tour-Direction Drilling Data
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Alberta Energy Regulator]]
| date = 2015-05-26
+
| date = 2020-04-22
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
== Waste Data ==
+
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Perforation Date
!scope="col" | TYPE
+
!scope="col" | Perforation Type
!scope="col" | QUANTITY
+
!scope="col" style="text-align: right;" | Interval Top (m)
!scope="col" | UNITS
+
!scope="col" style="text-align: right;" | Interval Base (m)
!scope="col" | DISPOSAL METHOD
+
!scope="col" style="text-align: right;" | Number of Shots
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-2
+
| 1996-10-21
| DRILLING FLUID WASTE
+
| Perforation
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 554.50
| Bbl
+
| style="text-align: right;" | 558.00
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 17
|  
 
| REUSE FOR DRILLING OR PLUGGING
 
|
 
|  
 
 
|-
 
|-
 +
| 2000-09-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 534.80
 +
| style="text-align: right;" | 545.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2000-09-18
| DRILLING FLUID WASTE
+
| Perforation
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 522.30
| Bbl
+
| style="text-align: right;" | 524.00
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 17
| WMGR123SW001
 
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2000-09-18
 +
| Perforation
 +
| style="text-align: right;" | 516.00
 +
| style="text-align: right;" | 517.50
 +
| style="text-align: right;" | 17
 
|-
 
|-
| 2011-2
+
| 2004-06-20
| FRACING FLUID WASTE
+
| Cement Squeeze
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 516.00
| Bbl
+
| style="text-align: right;" | 524.00
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0
|  
 
| REUSE FOR DRILLING OR PLUGGING
 
|
 
|  
 
 
|-
 
|-
 +
| 2004-07-05
 +
| Cement Plug
 +
| style="text-align: right;" | 320.00
 +
| style="text-align: right;" | 525.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
|}
| FRACING FLUID WASTE
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 15.0
+
| title = General Well Data File - Tour-Perforation/Treatment Data
| Bbl
+
|publisher = [[Alberta Energy Regulator]]
| REUSE OTHER THAN ROAD SPREADING
+
| date = 2020-04-22
|  
+
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
| REUSE FOR DRILLING OR PLUGGING
+
| accessdate = 2020-05-07 }}</ref>
|  
+
<!--== Fracking Activities ==
|  
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 2012-1
+
|}-->
| FRACING FLUID WASTE
+
 
| style="text-align:right;" | 3.0
+
<!--== Water Sources ==
| Bbl
+
{| class="wikitable sortable" width="95%"
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
!scope="col" | Water Diversion Start Date
| WMGR123SW001
+
!scope="col" | Water Diversion End Date
| RONCO WASTE PROCESSING FACILITY
+
!scope="col" | Water Source Type
| MASONTOWN
+
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
| PA
 
 
|-
 
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 
|-
 
|-
| 2012-2
+
| 1997
| DRILL CUTTINGS
+
| style="text-align: right;" | 2470
| style="text-align:right;" | 0.07
+
| style="text-align: right;" | 0.0
| Tons
+
| style="text-align: right;" | 0.0
| LANDFILL
+
| style="text-align: right;" | 0.0
| 100419
 
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
 
| MCCLELLANDTOWN
 
| PA
 
|-
 
|-
 
| 2012-2
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 629.7
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE FOR DRILLING OR PLUGGING
 
|
 
|
 
|-
 
|-
 
| 2012-2
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 75.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 2.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE FOR DRILLING OR PLUGGING
 
|
 
|
 
|-
 
|-
 
| 2013-1
 
| PRODUCED FLUID
 
| style="text-align:right;" | 580.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE FOR DRILLING OR PLUGGING
 
|
 
|
 
|-
 
|-
 
| 2013-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 590.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
|
 
|-
 
|-
 
| 2014-1
 
| PRODUCED FLUID
 
| style="text-align:right;" | 499.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
|
 
|-
 
 
|-
 
|-
| 2014-1
+
| 1998
| PRODUCED FLUID
+
| style="text-align: right;" | 3430
| style="text-align:right;" | 16.25
+
| style="text-align: right;" | 0.0
| Bbl
+
| style="text-align: right;" | 0.0
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0.0
| 34-121-23995
 
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
 
|-
 
|-
 +
| 1999
 +
| style="text-align: right;" | 160
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
| 2014-2
+
| 2000
| PRODUCED FLUID
+
| style="text-align: right;" | 568
| style="text-align:right;" | 241.25
+
| style="text-align: right;" | 0.0
| Bbl
+
| style="text-align: right;" | 0.0
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.0
|  
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
|  
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title = Well Production Data - All Alberta
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Alberta Energy Regulator]]
| date = 2015-05-26
+
| date = 2020-04-25
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
== Inspection Data ==
+
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Occurence Date
!scope="col" | DATE
+
!scope="col" | Occurence Type
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: right;" | Occurence Depth (m)
!scope="col" | COMMENT
+
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
| 1961157
+
|}-->
| 2011-03-28
 
| No Violations Noted
 
|
 
|
 
|
 
|
 
|-
 
|-
 
| 1970547
 
| 2011-05-03
 
| No Violations Noted
 
|
 
|
 
|
 
|
 
|-
 
|-
 
| 1973589
 
| 2011-05-17
 
| No Violations Noted
 
|
 
|
 
|
 
|
 
|-
 
|-
 
| 1979126
 
| 2011-06-08
 
| No Violations Noted
 
|
 
|
 
|
 
|
 
|-
 
|-
 
| 1984096
 
| 2011-06-03
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. RUNNING 8 5/8" PIPE TODAY,CEMENTING TONIGHT. MOVING TO MUTNANSKY 12-H (6/4/2011).
 
|
 
|
 
|
 
|-
 
|-
 
| 1984131
 
| 2011-05-30
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS,E&S AND PITS IN GOOD CONDITION. SETTING COAL STRING @ 401' AND CEMENTING TONIGHT.
 
|
 
|
 
|
 
|-
 
|-
 
| 1984134
 
| 2011-05-27
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SETTING SURFACE CASING @ 249' TODAY AND CEMENTING TONIGHT.
 
|
 
|
 
|
 
|-
 
|-
 
| 1984138
 
| 2011-04-01
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SETTING CONDUCTOR @  30'.
 
|
 
|
 
|
 
|-
 
|-
 
| 1991492
 
| 2011-07-28
 
| No Violations Noted
 
|
 
|
 
|
 
|
 
|-
 
|-
 
| 1995658
 
| 2011-08-15
 
| No Violations Noted
 
|
 
|
 
|
 
|
 
|-
 
|-
 
| 2005029
 
| 2011-08-19
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S & PITS IN GOOD CONDITION. CROWN #  5 MOVING ONTO  MUTNANSKY  11 - H    TODAY.
 
|
 
|
 
|
 
|-
 
|-
 
| 2005036
 
| 2011-08-24
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S & PITS IN GOOD CONDITION. CROWN # 5 TD @ 7107' .MUDDING UP  AND CAPPED (8/24/2011).
 
|
 
|
 
|
 
|-
 
|-
 
| 2015130
 
| 2011-10-14
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, PATTERSON - 325 DRILLING ON (MUTNANSKY  11- H )ON FLUID @ 8096' .
 
|
 
|
 
|
 
|-
 
|-
 
| 2017346
 
| 2011-10-06
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, PATTERSON -324 RIGGING UP ON MUTNANSKY  11 - H.
 
|
 
|
 
|
 
|-
 
|-
 
| 2017349
 
| 2011-10-28
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, PATTERSON -  324  DRILLING ON FLUID @ 10,973' TODAY ,EXSPECTING TO (TD) TONIGHT @ 11, 973' , PLANNING TO  RUN  PROD. CASING LATE TONIGHT AND CEMENTING SAT. MORNING.
 
|
 
|
 
|
 
|-
 
|-
 
| 2144423
 
| 2013-03-01
 
| No Violations Noted
 
| Site ID sign in place, E&S, PPC, permits in box.  Site mostly restored, wells labeled, tanks in containment.  Some silt fence in field remaining from previous sed trap removal.  No leaks observed today.
 
|
 
|
 
|
 
|-
 
|-
 
| 2223547
 
| 2013-11-20
 
| No Violations Noted
 
| On 11/20/2013, the Department performed an Notice of Termination inspection at the site of Chevron Appalachiaï¾’s Mutnansky Unit 9, 10, 11, 12H well site in North Union Twp., Fayette County.  The ESX10-051-0011 is the site permit being inspected for the N.O.T.
 
  
There was an Act 9 site ID sign up at the entrance of the access road. The well permits, E&S plan, and PPC plan were located in the box.  The access road was in good shape and was gated half way to the site.
+
==References==
 
+
<references/>
The site has been restored.  The vegetation covering the reclaimed area looked to be in good shape.  Drainage issues in the lower field had been addressed and looked to be working.
 
 
 
The pad area is now fenced off and access to the pad is locked. 
 
 
 
The four wells on site were labeled.  There are also four tanks in containment and four heater/separator units on site.  I did not observe any leaks on this date.
 
 
 
All drilling equipment and supplies not needed for production have been removed from the site.
 
 
 
The N.O.T. has been approved.
 
 
 
|
 
|
 
|
 
|-
 
|-
 
| 2373086
 
| 2015-05-15
 
| No Violations Noted
 
|  On 05/15/15 at approximately 1130 hours I conducted a routine complete inspection of the Mutnansky Unit. The site was gated
 
|
 
|
 
|
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title = Oil and Gas Historical Inspection Report
 
| publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2015-05-26
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 
| accessdate = 2015-05-27 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 22:32, 7 July 2020

Well Details

Well ID: 0534063608000
Loading map...
Location: 00/08-36-053-06W4/0
Location Alias: 00/08-36-53-06 W4M
Location Alias 2: 00/08-36-053-06 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 06
Section: 36
County/Municipality: County of Vermilion River
Well Name: NORCEN LINDBERGH 8-36-53-6
Operator Name: Canadian Natural Resources Limited
License Number: 0190893
License Date: 1996-08-28
License Status: RecCertified
Spud Date: 1996-09-14
Final Drill Date: 1996-09-18
Well Total Depth: 694.00 m
Surface Hole Latitude: 53.619652
Surface Hole Longitude: -110.748634

For data sources see[1][2]

Well History

Date Event
1996-08-28 Obtained License
1996-09-15 Surface Casing Operation Performed
1996-09-16 Direction Drilling Operation Performed - Deviate
1996-09-18 Finished Drilling
1996-09-18 Well Log Performed
1996-09-18 Well Mode changed to Drilled and Cased
1996-09-20 Production Casing Operation Performed
1996-09-20 Rig Released
1996-10-21 Perforation Treatment Performed - Jet Perforation
1996-10-22 Well Log Performed
1997-01-18 Well Began Production
1997-01-18 Well Fluid changed to Gas
1997-01-18 Well Mode changed to Flowing
2000-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-18 Perforation Treatment Performed - Jet Perforation
2000-09-18 Plug Back Performed
2000-09-18 Well Fluid changed to Gas
2000-09-18 Well Log Performed
2000-09-18 Well Mode changed to Abandoned Zone
2004-06-20 Perforation Treatment Performed - Cement Squeeze
2004-06-20 Plug Back Performed
2004-07-05 Perforation Treatment Performed - Cement Plug
2004-07-14 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-09-16 141.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-10-21 Perforation 554.50 558.00 17
2000-09-18 Packing Device Capped w/Cement 534.80 545.00 0
2000-09-18 Perforation 522.30 524.00 17
2000-09-18 Perforation 516.00 517.50 17
2004-06-20 Cement Squeeze 516.00 524.00 0
2004-07-05 Cement Plug 320.00 525.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2470 0.0 0.0 0.0
1998 3430 0.0 0.0 0.0
1999 160 0.0 0.0 0.0
2000 568 0.0 0.0 0.0

For data sources see[6]

References