If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m (Wiki moved page 051-24408 to 42-051-24408) |
|
(No difference)
|
Well ID: 051-24408 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.967413,"lon":-79.679088,"icon":""}]} |
County: Fayette | |
Municipality: Dunbar Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Farm/Lease Name: KURUTZ UNIT 12H | |
First Permit Date: 2010-11-23 | |
Last Permit Date: 2010-11-23 | |
Spud Date: 2011-02-16 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 39.967413 | |
Longitude: -79.679088 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1960163 | 2011-03-24 | No Violations Noted | ||
1961112 | 2011-03-28 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS LOOK IN GOOD CONDITION.CONDUTOR IS SET,WAITING ON RIG. | |
1967350 | 2011-04-19 | No Violations Noted | ||
1973585 | 2011-05-17 | No Violations Noted | ||
1977446 | 2011-05-31 | No Violations Noted | ||
1984065 | 2011-04-21 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLED INTO ONONDAGA, CEMENTED BACK TO 7800' (KOP). MUDDED UP AND CAPPED. | |
1984068 | 2011-04-14 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. RUNNING 8 5/8" CASING @ 2772' TODAY AND CEMENTING TONIGHT. | |
1984069 | 2011-04-11 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SETTING COAL STRING @ 726' AND CEMENTING TODAY. | |
1984072 | 2011-04-08 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GGOD CONDITION.SETTING SURFACE CASING @ 343' AND CEMENTING TONIGHT. | |
1984078 | 2011-03-31 | No Violations Noted | HORIZONTAL MARCELLUS, PITS AND E&S IN GOOD CONDITION.SETTING 24" CONDUCTOR PIPE @ 40' TODAY. | |
1984831 | 2011-06-29 | No Violations Noted | ||
2005126 | 2011-09-19 | No Violations Noted | HORIZONTAL MARCELLUS, E&S & PITS LOOK IN GOOD CONDITION. RIG MOVING ON SITE (PIONEER DRILLING). | |
2025539 | 2011-12-06 | No Violations Noted | HORIZONTAL MARCELLUS, PIONEER # 64 RIGGING DOWN OFF KURUTZ LOCATION. | |
2025545 | 2011-11-30 | No Violations Noted | HORIZONTAL MARCELLUS, DRILLING ON FLUID @ 12,670' (TD), PULLING DRILL PIPE ,RUNNING PROD. CASING (11/28/2011),AND CEMENTING ( 11/30/2011). | |
2025546 | 2011-11-18 | No Violations Noted | HORIZONTAL MARCELLUS,DRILLING ON FLUID @ 5692' TODAY. | |
2048056 | 2012-02-01 | No Violations Noted | No problems with this well. The pit has violations and they are recorded under Well# 10, eFacts# 2047985. | |
2048071 | 2012-02-09 | No Violations Noted | On February, 8, 2012, while subcontractor was removing / mixing the material in the cuttings pit, a Chevron employee got a reading of 22 ppm hydrogen sulfide (H2S) on his PPM. All work was halted and the site evacuated until the situation was resolved.
On February 9, 2012, I stopped at the site and confirmed that work was halted.
|
|
2048104 | 2012-02-10 | No Violations Noted | On February 10, 2012, WQSS Vince Yantko and I visited the Kurutz site to evaluate the situation. The site was still shut down and an environmental contractor was monitoring for hydrogen sulfide. This contractor reported that there were no new detects.
We talked briefly about the clean-up and walked around the open pit. It appeared like more water was coming into pit and Vince expressed concerns that pit water inflow may reach a level where pit contents may reverse flow back out of liner hole. Later that day, Vince received a tip from a citizen that fly ash was delivered to this well site to be used as a bulking / drying additive for pit preparation for landfill disposal. Chevron was notified by phone & requested to investigate & confirm all additives used. |
|
2048114 | 2012-02-14 | No Violations Noted | On February 14, 2012, I stopped at the Kurutz site to check progress. They were still not working on site but the monitoring contractor was still looking for hydrogen sulfide; they still hadn’t any hits.
About 120 barrels of liquid were removed from the pit in the last two days. Chevron was working on a plan to empty the pit and handle any hydrogen sulfide problems. |
|
2048123 | 2012-02-17 | No Violations Noted | On February 15, 2012, Chevron’s contractor again started removing material from the cuttings pit.
On February 17, 2012, I stopped to check the progress. Material was actively being removed at inspection and I got to see them mix the cement with the cuttings. The work was progressing and they had no more hydrogen sulfide hits at that point. They hoped to have all the work including the liner removed by Wednesday, February 22nd. Beth Smock from Chevron was on-site and we spoke briefly about the case. |
|
2048203 | 2012-02-22 | No Violations Noted | On February 22, 2012, Soil Scientist II, Bill Davis, WQS Rich Thomas and I stopped at the Kurutz site to evaluate & delineate the seasonable high water table at the cuttings pit location. Bill’s investigation revealed that this pit does not comply with requirements under Chapter 78 – specifically 78.56 a 4 iii.
We also found a small coal seam in the pit. Violations noted agains Well# 10H - 051-24408, eFacts#: 2048173, Enforcement#: 281094 |
|
2107509 | 2012-09-26 | No Violations Noted | Operator requested restoration extension, Site stable, E&S in place and functioning, Rest of equipment on site to be removed by end on November. Extension approved. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 164549.0 | 153.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | FRACING FLUID WASTE | 17125.4 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0253723 | APPALACHIAN WATER SERVICES LLC (RONCO WTP) | MASONTOWN | PA |
2012-2 | FRACING FLUID WASTE | 3409.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | PA | ||
2012-2 | PRODUCED FLUID | 1363.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | PA | ||
2011-2 | DRILLING FLUID WASTE | 98.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0253723 | APPALACHIAN WATER SERVICES LLC (RONCO WTP) | MASONTOWN | PA |
2011-2 | FRACING FLUID WASTE | 2490.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | PA | ||
2012-1 | DRILLING FLUID WASTE | 4884.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0253723 | APPALACHIAN WATER SERVICES LLC (RONCO WTP) | MASONTOWN | PA |