X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24408"

m (Wiki moved page 051-24408 to 42-051-24408)
m
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 051-24408
+
| Well ID: 37-051-24408
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 39.967413, -79.679088 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.967414, -79.679089 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 
|-
 
|-
| County: [[Fayette County, Pennsylvania|Fayette]]
+
| County: [[Fayette_County,_Pennsylvania|Fayette]]
 
|-
 
|-
| Municipality: [[Dunbar Township, Fayette County, Pennsylvania|Dunbar Township]]
+
| Municipality: [[Dunbar Township,_Fayette_County,_Pennsylvania|Dunbar Township]]
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 +
|-
 +
| Well Pad ID: [[148718]]
 
|-
 
|-
 
| Farm/Lease Name: KURUTZ UNIT 12H
 
| Farm/Lease Name: KURUTZ UNIT 12H
 
|-
 
|-
| First Permit Date: 2010-11-23
+
| License Status:
 +
|-
 +
| Spud Date:
 +
|-
 +
| Permit Date: 2010-11-23
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 +
|-
 +
| Latitude: 39.967414
 +
|-
 +
| Longitude: -79.679089
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-11-23
 +
| New Permit Application
 +
|-
 +
| 2011-02-16
 +
| Performed Spud Operation
 +
|-
 +
| 2011-04-24
 +
| Drilling Completion
 +
|-
 +
| 2011-12-02
 +
| Drilling Completion
 +
|-
 +
| 2012-07-18
 +
| Perforation
 +
|-
 +
| 2012-07-18
 +
| Performed Stimulation 
 +
|-
 +
| 2016-04-11
 +
| DEVIATED
 +
|-
 +
| 2016-04-11
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2012-07-18
 +
| 2012-07-18
 +
| style="text-align: right;" | 7,617
 +
| style="text-align: right;" | 3,790,845
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="13"| 1
 +
| rowspan="1"| Proppant (lbs)
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 +
|
 +
|
 +
| style="text-align: right;" | 8.46
 +
| style="text-align: right;" | 9.31
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6673W
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00682000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| FR-66 Friction Reducer
 +
| rowspan="1"| Halliburton Energy Services
 +
| rowspan="1"| Friction Reducer
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.03
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Clean Volume (gals)
 +
| rowspan="1"|
 +
| rowspan="1"| Carrier/Base Fluid
 +
|
 +
|
 +
| style="text-align: right;" | 91.54
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| Biocide EC 6116A
 +
| rowspan="3"| Nalco
 +
| rowspan="3"| Biocide
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00125000
 +
| style="text-align: right;" |
 +
|-
 +
| Polyethylene glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00749000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| ASP 900
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Friction Reducer
 +
| Ammonium sulfate
 +
| 7783-20-2
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 7.5 Hcl Acid
 +
| rowspan="1"|
 +
| rowspan="1"| Used to open perfs
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.50
 +
| style="text-align: right;" | 0.28
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| WG-36 GELLING AGENT
 +
| rowspan="1"| Halliburton Energy Services
 +
| rowspan="1"| Water Viscosifier
 +
| Guar gum
 +
| 9000-30-0
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 0.00200000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| GBW-30 BREAKER
 +
| rowspan="2"| Halliburton Energy Services
 +
| rowspan="2"| Gel Breaker
 +
| Hemicellulase enzyme
 +
| 9012-54-8
 +
| style="text-align: right;" | 15.00
 +
| style="text-align: right;" | 0.00010000
 +
| style="text-align: right;" |
 +
|-
 +
| Carbohydrates
 +
|
 +
| style="text-align: right;" | 95.00
 +
| style="text-align: right;" | 0.00061000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6486A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00717000
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2012-07-18
 +
| style="text-align: right;" |
 +
 
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 164,549.00
 +
| style="text-align: right;" | 153
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 573,444.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 388,154.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 80.00
 +
| style="text-align: right;" | 153
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 274,431.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 217,716.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 143,430.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 124,218.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 90,158.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 98.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 2,490.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,363.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 11.38 Tons
 +
| LANDFILL
 +
| 100419
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 17,125.40 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 3,409.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 4,884.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 16.15 Tons
 +
| LANDFILL
 +
| 073 114 654
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,426.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 85.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 40.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-23995
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,123.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 805.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 288.35 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 428.34 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| Last Permit Date: 2010-11-23
+
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,540.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW001
 
|-
 
|-
| Spud Date: 2011-02-16
+
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 
|-
 
|-
| Unconventional: Yes
+
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 111.66 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 
|-
 
|-
| Horizontal: Yes
+
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 115.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| Producing: Yes
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 149.01 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| Violations: None
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 158.00 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 
|-
 
|-
| Latitude: 39.967413
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 76.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| Longitude: -79.679088
+
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 233.33 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1960163
 
| 1960163
 +
| Primary Facility
 
| 2011-03-24
 
| 2011-03-24
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1961112
 
| 1961112
 +
| Primary Facility
 
| 2011-03-28
 
| 2011-03-28
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S AND PITS LOOK IN GOOD CONDITION.CONDUTOR IS SET,WAITING ON  RIG.
 
| HORIZONTAL MARCELLUS, E&S AND PITS LOOK IN GOOD CONDITION.CONDUTOR IS SET,WAITING ON  RIG.
|
 
|-
 
 
|-
 
|-
 
| 1967350
 
| 1967350
 +
| Primary Facility
 
| 2011-04-19
 
| 2011-04-19
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1973585
 
| 1973585
 +
| Primary Facility
 
| 2011-05-17
 
| 2011-05-17
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 1977446
 
| 1977446
 +
| Primary Facility
 
| 2011-05-31
 
| 2011-05-31
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 1984065
 
| 1984065
 +
| Primary Facility
 
| 2011-04-21
 
| 2011-04-21
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLED INTO ONONDAGA, CEMENTED BACK TO 7800' (KOP). MUDDED UP AND CAPPED.
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLED INTO ONONDAGA, CEMENTED BACK TO 7800' (KOP). MUDDED UP AND CAPPED.
|
 
|-
 
 
|-
 
|-
 
| 1984068
 
| 1984068
 +
| Primary Facility
 
| 2011-04-14
 
| 2011-04-14
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. RUNNING 8 5/8" CASING @ 2772' TODAY AND CEMENTING TONIGHT.
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. RUNNING 8 5/8" CASING @ 2772' TODAY AND CEMENTING TONIGHT.
|
 
|-
 
 
|-
 
|-
 
| 1984069
 
| 1984069
 +
| Primary Facility
 
| 2011-04-11
 
| 2011-04-11
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SETTING COAL STRING @  726' AND CEMENTING TODAY.
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SETTING COAL STRING @  726' AND CEMENTING TODAY.
|
 
|-
 
 
|-
 
|-
 
| 1984072
 
| 1984072
 +
| Primary Facility
 
| 2011-04-08
 
| 2011-04-08
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GGOD CONDITION.SETTING SURFACE CASING @ 343' AND CEMENTING TONIGHT.
 
| HORIZONTAL MARCELLUS, E&S AND PITS IN GGOD CONDITION.SETTING SURFACE CASING @ 343' AND CEMENTING TONIGHT.
|
 
|-
 
 
|-
 
|-
 
| 1984078
 
| 1984078
 +
| Primary Facility
 
| 2011-03-31
 
| 2011-03-31
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, PITS AND E&S IN GOOD CONDITION.SETTING 24" CONDUCTOR PIPE @ 40' TODAY.
 
| HORIZONTAL MARCELLUS, PITS AND E&S IN GOOD CONDITION.SETTING 24" CONDUCTOR PIPE @ 40' TODAY.
|
 
|-
 
 
|-
 
|-
 
| 1984831
 
| 1984831
 +
| Primary Facility
 
| 2011-06-29
 
| 2011-06-29
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2005126
 
| 2005126
 +
| Primary Facility
 
| 2011-09-19
 
| 2011-09-19
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, E&S & PITS LOOK IN GOOD CONDITION. RIG MOVING ON SITE (PIONEER DRILLING).
 
| HORIZONTAL MARCELLUS, E&S & PITS LOOK IN GOOD CONDITION. RIG MOVING ON SITE (PIONEER DRILLING).
|
 
|-
 
 
|-
 
|-
 
| 2025539
 
| 2025539
 +
| Primary Facility
 
| 2011-12-06
 
| 2011-12-06
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, PIONEER # 64 RIGGING DOWN OFF KURUTZ LOCATION.
 
| HORIZONTAL MARCELLUS, PIONEER # 64 RIGGING DOWN OFF KURUTZ LOCATION.
|
 
|-
 
 
|-
 
|-
 
| 2025545
 
| 2025545
 +
| Primary Facility
 
| 2011-11-30
 
| 2011-11-30
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, DRILLING ON FLUID @ 12,670' (TD), PULLING DRILL PIPE ,RUNNING PROD. CASING (11/28/2011),AND CEMENTING ( 11/30/2011).
 
| HORIZONTAL MARCELLUS, DRILLING ON FLUID @ 12,670' (TD), PULLING DRILL PIPE ,RUNNING PROD. CASING (11/28/2011),AND CEMENTING ( 11/30/2011).
|
 
|-
 
 
|-
 
|-
 
| 2025546
 
| 2025546
 +
| Primary Facility
 
| 2011-11-18
 
| 2011-11-18
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS,DRILLING ON FLUID @ 5692' TODAY.
 
| HORIZONTAL MARCELLUS,DRILLING ON FLUID @ 5692' TODAY.
|
 
|-
 
 
|-
 
|-
 
| 2048056
 
| 2048056
 +
| Primary Facility
 
| 2012-02-01
 
| 2012-02-01
 +
| Incident- Response to Accident or Event
 
| No Violations Noted
 
| No Violations Noted
 
| No problems with this well.  The pit has violations and they are recorded under Well# 10, eFacts# 2047985.
 
| No problems with this well.  The pit has violations and they are recorded under Well# 10, eFacts# 2047985.
|
 
|-
 
 
|-
 
|-
 
| 2048071
 
| 2048071
 +
| Primary Facility
 
| 2012-02-09
 
| 2012-02-09
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On February, 8, 2012, while subcontractor was removing / mixing the material in the cuttings pit, a Chevron employee got a reading of 22 ppm hydrogen sulfide (H2S) on his PPM.  All work was halted and the site evacuated until the situation was resolved.
 
| On February, 8, 2012, while subcontractor was removing / mixing the material in the cuttings pit, a Chevron employee got a reading of 22 ppm hydrogen sulfide (H2S) on his PPM.  All work was halted and the site evacuated until the situation was resolved.
 
On February 9, 2012, I stopped at the site and confirmed that work was halted. 
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2048104
 
| 2048104
 +
| Primary Facility
 
| 2012-02-10
 
| 2012-02-10
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On February 10, 2012, WQSS Vince Yantko and I visited the Kurutz site to evaluate the situation.  The site was still shut down and an environmental contractor was monitoring for hydrogen sulfide.  This contractor reported that there were no new detects.
 
| On February 10, 2012, WQSS Vince Yantko and I visited the Kurutz site to evaluate the situation.  The site was still shut down and an environmental contractor was monitoring for hydrogen sulfide.  This contractor reported that there were no new detects.
 
We talked briefly about the clean-up and walked around the open pit.  It appeared like more water was coming into pit and Vince expressed concerns that pit water inflow may reach a level where pit contents may reverse flow back out of liner hole.
 
 
Later that day, Vince received a tip from a citizen that fly ash was delivered to this well site to be used as a bulking / drying additive for pit preparation for landfill disposal. Chevron was notified by phone & requested to investigate & confirm all additives used.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2048114
 
| 2048114
 +
| Primary Facility
 
| 2012-02-14
 
| 2012-02-14
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On February 14, 2012, I stopped at the Kurutz site to check progress.  They were still not working on site but the monitoring contractor was still looking for hydrogen sulfide; they still hadn’t any hits.
 
| On February 14, 2012, I stopped at the Kurutz site to check progress.  They were still not working on site but the monitoring contractor was still looking for hydrogen sulfide; they still hadn’t any hits.
About 120 barrels of liquid were removed from the pit in the last two days.
 
 
Chevron was working on a plan to empty the pit and handle any hydrogen sulfide problems.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2048123
 
| 2048123
 +
| Primary Facility
 
| 2012-02-17
 
| 2012-02-17
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On February 15, 2012, Chevron’s contractor again started removing material from the cuttings pit.
 
| On February 15, 2012, Chevron’s contractor again started removing material from the cuttings pit.
 
On February 17, 2012, I stopped to check the progress.  Material was actively being removed at inspection and I got to see them mix the cement with the cuttings.  The work was progressing and they had no more hydrogen sulfide hits at that point.
 
 
They hoped to have all the work including the liner removed by Wednesday, February 22nd.
 
 
Beth Smock from Chevron was on-site and we spoke briefly about the case.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2048203
 
| 2048203
 +
| Primary Facility
 
| 2012-02-22
 
| 2012-02-22
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
| On February 22, 2012, Soil Scientist II, Bill Davis, WQS Rich Thomas and I stopped at the Kurutz site to evaluate & delineate the seasonable high water table at the cuttings pit location.  Bill’s investigation revealed that this pit does not comply with requirements under Chapter 78 – specifically 78.56 a 4 iii.  
+
| On February 22, 2012, Soil Scientist II, Bill Davis, WQS Rich Thomas and I stopped at the Kurutz site to evaluate & delineate the seasonable high water table at the cuttings pit location.  Bill’s investigation revealed that this pit does not comply with requirements under Chapter 78 – specifically 78.56 a 4 iii.
 
 
We also found a small coal seam in the pit.
 
 
 
Violations noted agains Well# 10H - 051-24408, eFacts#: 2048173, Enforcement#: 281094
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2107509
 
| 2107509
 +
| Primary Facility
 
| 2012-09-26
 
| 2012-09-26
 +
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
 
| Operator requested restoration extension, Site stable, E&S in place and functioning, Rest of equipment on site to be removed by end on November.  Extension approved.
 
| Operator requested restoration extension, Site stable, E&S in place and functioning, Rest of equipment on site to be removed by end on November.  Extension approved.
|
 
 
|-
 
|-
|}
+
| 2384451
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2015-06-26
!scope="col" | PERIOD
+
| Routine/Complete Inspection
!scope="col" | GAS QUANTITY
+
| No Violations Noted
!scope="col" | GAS PRODUCTION DAYS
+
| On 06/26/15 at approximately 1500 hours I conducted a routine complete inspection of the Kurutz Unit. The Act 9 sign was in place and visible. All required documents were present in the mailbox. The site was well vegetated and no signs of accelerated erosion were noted. The well heads appeared to be in good condition. There were no violations noted at the time of inspection.
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2684584
| style="text-align:right;" | 164549.0
+
| Primary Facility
| style="text-align:right;" | 153.0
+
| 2018-01-22
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Well appears equipped for production. Three brine tanks on site.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
|-
+
| 2825074
| 2012-1
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2019-01-10
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | TYPE
+
!scope="col" | Violation ID
!scope="col" | QUANTITY
+
!scope="col" | Violation Date
!scope="col" | UNITS
+
!scope="col" | Date Resolved
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Violation Code
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Violation Type
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Violation Comments
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
|}-->
| FRACING FLUID WASTE
+
<!--==== Penalties Applied ====
| style="text-align:right;" | 17125.4
+
{| class="wikitable sortable" width="95%"
| Bbl
+
!scope="col" | Violation ID
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
!scope="col" | Penalty ID
| PA0253723
+
!scope="col" | Penalty Code
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
+
!scope="col" | Penalty Status
| MASONTOWN
+
!scope="col" | Penalty Date
| PA
+
!scope="col" | Enforcement Date
|-
+
!scope="col" | Penalty Amount
|-
+
!scope="col" | Amount Collected
| 2012-2
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 3409.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE FOR DRILLING OR PLUGGING
 
|
 
| PA
 
|-
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 1363.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE FOR DRILLING OR PLUGGING
 
|
 
| PA
 
|-
 
|-
 
| 2011-2
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 98.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0253723
 
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
|-
+
|}-->
| 2011-2
+
For data sources see<ref>{{cite web
| FRACING FLUID WASTE
+
| title =Oil and Gas Compliance Report
| style="text-align:right;" | 2490.0
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| Bbl
+
| date = 2019-05-20
| REUSE OTHER THAN ROAD SPREADING
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
|
+
| accessdate = 2019-05-21 }}</ref>
| REUSE FOR DRILLING OR PLUGGING
+
==References==
|
+
<references/>
| PA
 
|-
 
|-
 
| 2012-1
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 4884.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0253723
 
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
 
| MASONTOWN
 
| PA
 
|-
 
|}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 12:42, 16 May 2020

Well Details

Well ID: 37-051-24408
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Dunbar Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148718
Farm/Lease Name: KURUTZ UNIT 12H
License Status:
Spud Date:
Permit Date: 2010-11-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.967414
Longitude: -79.679089

For data sources see[1][2][3]

Well History

Date Event
2010-11-23 New Permit Application
2011-02-16 Performed Spud Operation
2011-04-24 Drilling Completion
2011-12-02 Drilling Completion
2012-07-18 Perforation
2012-07-18 Performed Stimulation
2016-04-11 DEVIATED
2016-04-11 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-07-18 2012-07-18 7,617 3,790,845

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Proppant (lbs) Proppant 8.46 9.31
EC6673W Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00682000
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
Clean Volume (gals) Carrier/Base Fluid 91.54 100.00
Biocide EC 6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5.00 0.00125000
Polyethylene glycol 25322-68-3 60.00 0.01
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00749000
ASP 900 Nalco Friction Reducer Ammonium sulfate 7783-20-2 30.00
7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.28
WG-36 GELLING AGENT Halliburton Energy Services Water Viscosifier Guar gum 9000-30-0 100.00 0.00200000
GBW-30 BREAKER Halliburton Energy Services Gel Breaker Hemicellulase enzyme 9012-54-8 15.00 0.00010000
Carbohydrates 95.00 0.00061000
EC6486A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00717000

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-07-18 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 164,549.00 153 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 573,444.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 388,154.00 334 0.00 0 80.00 153
2015 CHEVRON APPALACHIA LLC 274,431.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 217,716.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 143,430.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 124,218.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 90,158.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 98.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 2,490.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Produced Fluid 1,363.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drill Cuttings 11.38 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 17,125.40 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 3,409.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 4,884.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 16.15 Tons LANDFILL 073 114 654
2013 CHEVRON APPALACHIA LLC Produced Fluid 3,426.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Produced Fluid 85.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Produced Fluid 1,123.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 805.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 288.35 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 428.34 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,540.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 111.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 115.00 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 149.01 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 158.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 76.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 233.33 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1960163 Primary Facility 2011-03-24 Routine/Complete Inspection No Violations Noted
1961112 Primary Facility 2011-03-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS LOOK IN GOOD CONDITION.CONDUTOR IS SET,WAITING ON RIG.
1967350 Primary Facility 2011-04-19 Routine/Complete Inspection No Violations Noted
1973585 Primary Facility 2011-05-17 Routine/Complete Inspection No Violations Noted
1977446 Primary Facility 2011-05-31 Routine/Complete Inspection No Violations Noted
1984065 Primary Facility 2011-04-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLED INTO ONONDAGA, CEMENTED BACK TO 7800' (KOP). MUDDED UP AND CAPPED.
1984068 Primary Facility 2011-04-14 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. RUNNING 8 5/8" CASING @ 2772' TODAY AND CEMENTING TONIGHT.
1984069 Primary Facility 2011-04-11 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SETTING COAL STRING @ 726' AND CEMENTING TODAY.
1984072 Primary Facility 2011-04-08 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GGOD CONDITION.SETTING SURFACE CASING @ 343' AND CEMENTING TONIGHT.
1984078 Primary Facility 2011-03-31 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PITS AND E&S IN GOOD CONDITION.SETTING 24" CONDUCTOR PIPE @ 40' TODAY.
1984831 Primary Facility 2011-06-29 Complaint Inspection No Violations Noted
2005126 Primary Facility 2011-09-19 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S & PITS LOOK IN GOOD CONDITION. RIG MOVING ON SITE (PIONEER DRILLING).
2025539 Primary Facility 2011-12-06 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PIONEER # 64 RIGGING DOWN OFF KURUTZ LOCATION.
2025545 Primary Facility 2011-11-30 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON FLUID @ 12,670' (TD), PULLING DRILL PIPE ,RUNNING PROD. CASING (11/28/2011),AND CEMENTING ( 11/30/2011).
2025546 Primary Facility 2011-11-18 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,DRILLING ON FLUID @ 5692' TODAY.
2048056 Primary Facility 2012-02-01 Incident- Response to Accident or Event No Violations Noted No problems with this well. The pit has violations and they are recorded under Well# 10, eFacts# 2047985.
2048071 Primary Facility 2012-02-09 Follow-up Inspection No Violations Noted On February, 8, 2012, while subcontractor was removing / mixing the material in the cuttings pit, a Chevron employee got a reading of 22 ppm hydrogen sulfide (H2S) on his PPM. All work was halted and the site evacuated until the situation was resolved.
2048104 Primary Facility 2012-02-10 Follow-up Inspection No Violations Noted On February 10, 2012, WQSS Vince Yantko and I visited the Kurutz site to evaluate the situation. The site was still shut down and an environmental contractor was monitoring for hydrogen sulfide. This contractor reported that there were no new detects.
2048114 Primary Facility 2012-02-14 Follow-up Inspection No Violations Noted On February 14, 2012, I stopped at the Kurutz site to check progress. They were still not working on site but the monitoring contractor was still looking for hydrogen sulfide; they still hadn’t any hits.
2048123 Primary Facility 2012-02-17 Follow-up Inspection No Violations Noted On February 15, 2012, Chevron’s contractor again started removing material from the cuttings pit.
2048203 Primary Facility 2012-02-22 Follow-up Inspection No Violations Noted On February 22, 2012, Soil Scientist II, Bill Davis, WQS Rich Thomas and I stopped at the Kurutz site to evaluate & delineate the seasonable high water table at the cuttings pit location. Bill’s investigation revealed that this pit does not comply with requirements under Chapter 78 – specifically 78.56 a 4 iii.
2107509 Primary Facility 2012-09-26 Site Restoration No Violations Noted Operator requested restoration extension, Site stable, E&S in place and functioning, Rest of equipment on site to be removed by end on November. Extension approved.
2384451 Primary Facility 2015-06-26 Routine/Complete Inspection No Violations Noted On 06/26/15 at approximately 1500 hours I conducted a routine complete inspection of the Kurutz Unit. The Act 9 sign was in place and visible. All required documents were present in the mailbox. The site was well vegetated and no signs of accelerated erosion were noted. The well heads appeared to be in good condition. There were no violations noted at the time of inspection.
2684584 Primary Facility 2018-01-22 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site.
2825074 Primary Facility 2019-01-10 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[9]

References