X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24391

Well Details

Well ID: 37-051-24391
Loading map...
County: Fayette
Municipality: German Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148144
Farm/Lease Name: CROUSHORE 11H
First Permit Date: 2010-09-27
Last Permit Date: 2010-09-27
Spud Date: 2010-11-05
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.902841
Longitude: -79.908736

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 189860.0 75.0 0.0 0.0 0.0 0.0
2012-1 227337.0 182.0 0.0 0.0 0.0 0.0
2012-2 200453.0 184.0 0.0 0.0 0.0 0.0
2013-1 155639.0 181.0 0.0 0.0 0.0 0.0
2013-2 116041.0 184.0 0.0 0.0 0.0 0.0
2014-1 107581.0 181.0 0.0 0.0 0.0 0.0
2014-2 98460.0 153.0 0.0 0.0 0.0 0.0
2015-02 12734.0 28.0 0.0 0.0 0.0 0.0
2015-01 15183.0 31.0 0.0 0.0 0.0 0.0
2015-03 15342.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-2 DRILLING FLUID WASTE 8.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-2 DRILLING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2010-2 FRACING FLUID WASTE 875.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-1 DRILLING FLUID WASTE 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2011-1 DRILLING FLUID WASTE 350.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-1 DRILLING FLUID WASTE 385.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-1 FRACING FLUID WASTE 4.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-1 PRODUCED FLUID 315.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE HUNTER DISPOSAL DEXTER CITY OH
2011-2 FRACING FLUID WASTE 21.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-2 FRACING FLUID WASTE 5.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 FRACING FLUID WASTE 65.0 Bbl LANDFILL SWF 1032-WV0109 WASTE MANAGEMENT, INC - MEADOWFILL LANDFILL BRIDGEMENT WV
2011-2 PRODUCED FLUID 1.0 Bbl INJECTION DISPOSAL WELL 34-121-2-3995 HUNTERS SWIW #5 RENO OH
2011-2 PRODUCED FLUID 235.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 925.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 415.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL DEXTER CITY OH
2012-2 PRODUCED FLUID 652.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 580.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-2 PRODUCED FLUID 265.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 954.33 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 476.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 20.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1938099 2010-11-05 No Violations Noted HORIZONTAL MARCELLUS, (ROCKY MOUNTAIN DRILLING) DRILLED AND CEMENTING 40' OF 24"CONDUCTOR PIPE IN.
1938101 2010-11-19 No Violations Noted HORIZONTAL MARCELLUS , WHIPSTOCK # 17 SKIDDED TO CROUSHORE # 11 -H ,READY TO SET SURFACE LATE TONIGHT.E&S AND PITS ARE IN GOOD CONDITIIN.
1938134 2010-11-22 No Violations Noted HORIZONTAL MARCELLUS, WHIPSTOCK # 17 ON CROUSHORE # 11 - H ,CEMENTING 11 3/4" COAL STRING . BUMB PLUG AND FLOATS HELD. CEMENET RETURNS TO SURFACE. PROCEEDING TO DRILL 8 5/8". E&S AND PITS LOOK GOOD.
1938139 2010-11-29 No Violations Noted HORIZONTAL MARCELLUS, WHIPSTOCK # 17 ON CROUSHORE # 11- H ,CEMENTED 8 5/8" INTERMEDIATE CASING ,BUMB PLUG AND FLOATS HELD. CEMENT RETURNS TO SURFACE.PROCEEDING TO DRILL 5 1/2". E&S AND PITS LOOK GOOD.
1939668 2010-12-27 No Violations Noted HORIZONTAL MARCELLUS, NOMAC -235 IS STARTING DRILLING. REACHED 3100 ' AT PRESENT TIME. E&S AND PITS LOOK IN GOOD CONDITION.
1943660 2011-01-07 No Violations Noted HORIZONTAL MARCELLUS, NOMAC - 235 FINISH DRILLING @ 6000 ' . MUDDED AND CAPPED WELL. PATTERSON - 227 MOVING ON STARTING 1/10/2011 (NEW - RIG ). E&S AND PITS ARE IN GOOD CONDITION.
1948361 2011-02-07 No Violations Noted
1955529 2011-03-08 No Violations Noted
1958197 2011-02-23 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. ARRIVED TO WATCH CEMENTING CREW FINISHING CEMENTING PROD. STRING IN, WATCH RETURNS TO SURFACE AND CLEAN UP. NOW RIG WILL WAIT 8 HRS. BEFORE MOVING TO CROUSHORE 10 - H.
1958198 2011-02-22 No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS ARE IN GOOD CONDITION.KOP @ 7652', LANDING CURVE @ 8235'.
1961132 2011-03-28 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS LOOK IN GOOD CONDITION. ALL WELLS ON PAD COMPLETED.RIG MOVING OFF.
1961206 2011-02-02 No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS LOOK GOOD CONDITION. CONDUTOR CEMENTED IN @ 40' OF 24"CASING.
1964312 2011-04-06 No Violations Noted
1984804 2011-06-27 No Violations Noted
1989861 2011-07-20 No Violations Noted
2029226 2011-12-21 No Violations Noted Met onsite with Chevron representative Chad Eisenman. Drilling had been completed, well appeared tohave been equipped for production. Site grading work was in the process of being completed. Discussed final site restoration with Mr. Eisenmann while onsite. Site will be temporarily stabilized during the winter months and in the spring of 2012 final restoration will be completed.
2101457 2012-09-18 No Violations Noted Site ID sign in place, site fenced and gated, tanks in containment, wells labeled.

For data sources see[3]

References