If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-051-24391 | | Well ID: 37-051-24391 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.902842, -79.908736 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 11 | + | | Spud Date: 2010-11-05 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2010-09-27 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | | 1 | ||
+ | | 2011-06-22 | ||
+ | | 2011-06-22 | ||
+ | | style="text-align: right;" | 8173.00 | ||
+ | | style="text-align: right;" | 2,775,887.0 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |} | ||
+ | ==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="11"| 1 | ||
+ | | rowspan="1"| Unislik ST 50 | ||
+ | | rowspan="1"| CESI Chemical | ||
+ | | rowspan="1"| Friction Reducer | ||
+ | | Distillates, petroleum, hydrotreated light | ||
+ | | 64742-47-8 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.02 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| Clean Volume (gals) | ||
+ | | rowspan="1"| | ||
+ | | rowspan="1"| Carrier/Base Fluid | ||
+ | | | ||
+ | | | ||
+ | | style="text-align: right;" | 100.00 | ||
+ | | style="text-align: right;" | 91.31 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| CMHPG | ||
+ | | rowspan="1"| Ashland | ||
+ | | rowspan="1"| Water Viscosifier | ||
+ | | Carboxymethylhydroxyporoyl guar blend | ||
+ | | | ||
+ | | style="text-align: right;" | 100.00 | ||
+ | | style="text-align: right;" | 0.00158000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| GBL | ||
+ | | rowspan="1"| Clearwater International | ||
+ | | rowspan="1"| Gel Breaker | ||
+ | | Ethylene glycol | ||
+ | | 107-21-1 | ||
+ | | style="text-align: right;" | 60.00 | ||
+ | | style="text-align: right;" | 0.00002000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| Proppant (lbs) | ||
+ | | rowspan="1"| | ||
+ | | rowspan="1"| Proppant | ||
+ | | | ||
+ | | | ||
+ | | style="text-align: right;" | 100.00 | ||
+ | | style="text-align: right;" | 8.69 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| Scale Inhibitor A | ||
+ | | rowspan="1"| Nalco | ||
+ | | rowspan="1"| Scale Inhibitor | ||
+ | | Ethylene glycol | ||
+ | | 107-21-1 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.00677000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| 7.5 Hcl Acid | ||
+ | | rowspan="1"| | ||
+ | | rowspan="1"| Used to open perfs | ||
+ | | Hydrochloric acid | ||
+ | | 7647-01-0 | ||
+ | | style="text-align: right;" | 7.50 | ||
+ | | style="text-align: right;" | 0.28 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| Iron Control A | ||
+ | | rowspan="1"| Nalco | ||
+ | | rowspan="1"| Iron Control | ||
+ | | Ethylene glycol | ||
+ | | 107-21-1 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.00680000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="3"| Biocide EC 6116A | ||
+ | | rowspan="3"| Nalco | ||
+ | | rowspan="3"| Biocide | ||
+ | | Polyethylene glycol | ||
+ | | 25322-68-3 | ||
+ | | style="text-align: right;" | 60.00 | ||
+ | | style="text-align: right;" | 0.01 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | | Dibromoacetonitrile | ||
+ | | 3252-43-5 | ||
+ | | style="text-align: right;" | 5.00 | ||
+ | | style="text-align: right;" | 0.00114000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | | 2,2-Dibromo-3-nitrilopropionamide | ||
+ | | 10222-01-2 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.00685000 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =FracFocus Fracking Chemicals Database | ||
+ | | date = 2019-04-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-06-19 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 496: | Line 635: | ||
| 1938099 | | 1938099 | ||
| Primary Facility | | Primary Facility | ||
− | | 11 | + | | 2010-11-05 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 503: | Line 642: | ||
| 1938101 | | 1938101 | ||
| Primary Facility | | Primary Facility | ||
− | | 11 | + | | 2010-11-19 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 510: | Line 649: | ||
| 1938134 | | 1938134 | ||
| Primary Facility | | Primary Facility | ||
− | | 11 | + | | 2010-11-22 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 517: | Line 656: | ||
| 1938139 | | 1938139 | ||
| Primary Facility | | Primary Facility | ||
− | | 11 | + | | 2010-11-29 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 524: | Line 663: | ||
| 1939668 | | 1939668 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2010-12-27 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 531: | Line 670: | ||
| 1943660 | | 1943660 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2011-01-07 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 538: | Line 677: | ||
| 1948361 | | 1948361 | ||
| Primary Facility | | Primary Facility | ||
− | | 02 | + | | 2011-02-07 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 545: | Line 684: | ||
| 1955529 | | 1955529 | ||
| Primary Facility | | Primary Facility | ||
− | | 03 | + | | 2011-03-08 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 552: | Line 691: | ||
| 1958197 | | 1958197 | ||
| Primary Facility | | Primary Facility | ||
− | | 02 | + | | 2011-02-23 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 559: | Line 698: | ||
| 1958198 | | 1958198 | ||
| Primary Facility | | Primary Facility | ||
− | | 02 | + | | 2011-02-22 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 566: | Line 705: | ||
| 1961132 | | 1961132 | ||
| Primary Facility | | Primary Facility | ||
− | | 03 | + | | 2011-03-28 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 573: | Line 712: | ||
| 1961206 | | 1961206 | ||
| Primary Facility | | Primary Facility | ||
− | | 02 | + | | 2011-02-02 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 580: | Line 719: | ||
| 1964312 | | 1964312 | ||
| Primary Facility | | Primary Facility | ||
− | | 04 | + | | 2011-04-06 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 587: | Line 726: | ||
| 1984804 | | 1984804 | ||
| Primary Facility | | Primary Facility | ||
− | | 06 | + | | 2011-06-27 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 594: | Line 733: | ||
| 1989861 | | 1989861 | ||
| Primary Facility | | Primary Facility | ||
− | | 07 | + | | 2011-07-20 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 601: | Line 740: | ||
| 2029226 | | 2029226 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2011-12-21 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 608: | Line 747: | ||
| 2101457 | | 2101457 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 2012-09-18 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 650: | Line 789: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> |
Well ID: 37-051-24391 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.902842,"lon":-79.908736,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: German Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148144 | |
Farm/Lease Name: CROUSHORE 11H | |
License Status: Active | |
Spud Date: 2010-11-05 | |
Permit Date: 2010-09-27 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 39.902842 | |
Longitude: -79.908736 |
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-06-22 | 2011-06-22 | 8173.00 | 2,775,887.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Unislik ST 50 | CESI Chemical | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |
Clean Volume (gals) | Carrier/Base Fluid | 100.00 | 91.31 | |||||
CMHPG | Ashland | Water Viscosifier | Carboxymethylhydroxyporoyl guar blend | 100.00 | 0.00158000 | |||
GBL | Clearwater International | Gel Breaker | Ethylene glycol | 107-21-1 | 60.00 | 0.00002000 | ||
Proppant (lbs) | Proppant | 100.00 | 8.69 | |||||
Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00677000 | ||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.28 | |||
Iron Control A | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00680000 | ||
Biocide EC 6116A | Nalco | Biocide | Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | ||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00114000 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00685000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | ATLAS RESOURCES LLC | 189,860.00 | 75 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 427,790.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 271,680.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 206,041.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 156,322.00 | 319 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 138,766.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 131,117.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 107,074.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 26,157.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2010-S02 | Drilling Fluid Waste (in Barrels) | 8,820.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-S02 | Drilling Fluid Waste (in Barrels) | 3,945.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2010-S02 | Fracing Fluid Waste (in Barrels) | 875.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011-S01 | Drilling Fluid Waste (in Barrels) | 2,550.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011-S01 | Drilling Fluid Waste (in Barrels) | 385.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011-S01 | Drilling Fluid Waste (in Barrels) | 350.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011-S01 | Fracing Fluid Waste (in Barrels) | 4,125.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S01 | Produced Fluid (in Barrels) | 315.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011-S02 | Fracing Fluid Waste (in Barrels) | 5,216.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011-S02 | Fracing Fluid Waste (in Barrels) | 65.00 Bbl | LANDFILL | SWF 1032-WV0109 |
2011-S02 | Fracing Fluid Waste (in Barrels) | 21,504.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S02 | Produced Fluid (in Barrels) | 1,547.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2011-S02 | Produced Fluid (in Barrels) | 235.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S01 | Produced Fluid (in Barrels) | 415.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2012-S01 | Produced Fluid (in Barrels) | 925.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S02 | Produced Fluid (in Barrels) | 652.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S01 | Produced Fluid (in Barrels) | 580.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Produced Fluid (in Barrels) | 265.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S01 | Produced Fluid (in Barrels) | 954.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S02 | Produced Fluid (in Barrels) | 20.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014-S02 | Produced Fluid (in Barrels) | 476.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S01 | Produced Fluid (in Barrels) | 528.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Produced Fluid (in Barrels) | 526.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 420.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 530.36 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 93.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 151.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 73.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 88.33 Bbl | REUSE (AT WELL PAD) | |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 56.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 45.00 Bbl | REUSE (AT WELL PAD) | |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 3,360.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M06 | Drilling Fluid Waste (in Barrels) RWC 803 | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 5.00 Bbl | REUSE (AT WELL PAD) | |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 36.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 143.33 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 28.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 36.67 Bbl | REUSE (AT WELL PAD) | |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 146.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 23.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 32.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 184.00 Bbl | REUSE (AT WELL PAD) | |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 36.67 Bbl | REUSE (AT WELL PAD) | |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 23.33 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 36.67 Bbl | REUSE (AT WELL PAD) | |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 36.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 36.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 70.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 36.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 36.67 Bbl | REUSE (AT WELL PAD) | |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 120.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1938099 | Primary Facility | 2010-11-05 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, (ROCKY MOUNTAIN DRILLING) DRILLED AND CEMENTING 40' OF 24"CONDUCTOR PIPE IN. |
1938101 | Primary Facility | 2010-11-19 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS , WHIPSTOCK # 17 SKIDDED TO CROUSHORE # 11 -H ,READY TO SET SURFACE LATE TONIGHT.E&S AND PITS ARE IN GOOD CONDITIIN. |
1938134 | Primary Facility | 2010-11-22 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, WHIPSTOCK # 17 ON CROUSHORE # 11 - H ,CEMENTING 11 3/4" COAL STRING . BUMB PLUG AND FLOATS HELD. CEMENET RETURNS TO SURFACE. PROCEEDING TO DRILL 8 5/8". E&S AND PITS LOOK GOOD. |
1938139 | Primary Facility | 2010-11-29 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, WHIPSTOCK # 17 ON CROUSHORE # 11- H ,CEMENTED 8 5/8" INTERMEDIATE CASING ,BUMB PLUG AND FLOATS HELD. CEMENT RETURNS TO SURFACE.PROCEEDING TO DRILL 5 1/2". E&S AND PITS LOOK GOOD. |
1939668 | Primary Facility | 2010-12-27 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, NOMAC -235 IS STARTING DRILLING. REACHED 3100 ' AT PRESENT TIME. E&S AND PITS LOOK IN GOOD CONDITION. |
1943660 | Primary Facility | 2011-01-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, NOMAC - 235 FINISH DRILLING @ 6000 ' . MUDDED AND CAPPED WELL. PATTERSON - 227 MOVING ON STARTING 1/10/2011 (NEW - RIG ). E&S AND PITS ARE IN GOOD CONDITION. |
1948361 | Primary Facility | 2011-02-07 | Routine/Complete Inspection | No Violations Noted | |
1955529 | Primary Facility | 2011-03-08 | Routine/Complete Inspection | No Violations Noted | |
1958197 | Primary Facility | 2011-02-23 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. ARRIVED TO WATCH CEMENTING CREW FINISHING CEMENTING PROD. STRING IN, WATCH RETURNS TO SURFACE AND CLEAN UP. NOW RIG WILL WAIT 8 HRS. BEFORE MOVING TO CROUSHORE 10 - H. |
1958198 | Primary Facility | 2011-02-22 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S AND PITS ARE IN GOOD CONDITION.KOP @ 7652', LANDING CURVE @ 8235'. |
1961132 | Primary Facility | 2011-03-28 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS LOOK IN GOOD CONDITION. ALL WELLS ON PAD COMPLETED.RIG MOVING OFF. |
1961206 | Primary Facility | 2011-02-02 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S AND PITS LOOK GOOD CONDITION. CONDUTOR CEMENTED IN @ 40' OF 24"CASING. |
1964312 | Primary Facility | 2011-04-06 | Routine/Complete Inspection | No Violations Noted | |
1984804 | Primary Facility | 2011-06-27 | Routine/Complete Inspection | No Violations Noted | |
1989861 | Primary Facility | 2011-07-20 | Routine/Complete Inspection | No Violations Noted | |
2029226 | Primary Facility | 2011-12-21 | Routine/Complete Inspection | No Violations Noted | Met onsite with Chevron representative Chad Eisenman. Drilling had been completed, well appeared tohave been equipped for production. Site grading work was in the process of being completed. Discussed final site restoration with Mr. Eisenmann while onsite. Site will be temporarily stabilized during the winter months and in the spring of 2012 final restoration will be completed. |
2101457 | Primary Facility | 2012-09-18 | Routine/Complete Inspection | No Violations Noted | Site ID sign in place, site fenced and gated, tanks in containment, wells labeled. |
2488217 | Primary Facility | 2016-05-20 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS, Routine Inspection all looks good. |
For data sources see[7]