X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24369

Well Details

Well ID: 37-051-24369
Loading map...
County: Fayette
Municipality: Redstone Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148606
Farm/Lease Name: JACKSON FARMS UNIT 37H
First Permit Date: 2010-06-30
Last Permit Date: 2010-06-30
Spud Date: 2010-08-05
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.969077
Longitude: -79.838688

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 323068.0 182.0 0.0 0.0 0.0 0.0
2012-2 529425.0 184.0 0.0 0.0 0.0 0.0
2013-1 342868.0 181.0 0.0 0.0 0.0 0.0
2013-2 341991.0 184.0 0.0 0.0 0.0 0.0
2014-1 282474.0 181.0 0.0 0.0 0.0 0.0
2014-2 238712.0 153.0 0.0 0.0 0.0 0.0
2015-02 33123.0 28.0 0.0 0.0 0.0 0.0
2015-01 37702.0 31.0 0.0 0.0 0.0 0.0
2015-03 36007.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-2 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-2 DRILLING FLUID WASTE 220.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-2 DRILLING FLUID WASTE 251.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-2 DRILLING FLUID WASTE 4.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2010-2 DRILLING FLUID WASTE 4.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-2 FRACING FLUID WASTE 138.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2010-2 FRACING FLUID WASTE 110.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-1 FRACING FLUID WASTE 17.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-1 FRACING FLUID WASTE 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-1 PRODUCED FLUID 85.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE HUNTER DISPOSAL DEXTER CITY OH
2011-1 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 FRACING FLUID WASTE 12.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 PRODUCED FLUID 140.0 Bbl INJECTION DISPOSAL WELL 34-121-2-3995 HUNTERS SWIW #5 RENO OH
2012-1 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 787.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL DEXTER CITY OH
2012-2 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FRACING FLUID WASTE 251.6 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-2 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 513.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 236.67 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1910853 2010-09-02 No Violations Noted HORIZONTAL MARCELLUS , FINISH SETTING CONDUTOR, STARTED DRILLING SURFACE CASING,SITE LOOKS CLEAN,E&S LOOKS GOOD. PERMIT # ARE MISSING OUT AT ROAD.
1916494 2010-09-24 No Violations Noted HORIZONTAL MARCELLUS,CONDUTOR SET 24"@ 80'.
1937845 2010-11-15 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON - 325 IS FINISHING RUNNING 5 1/2"CASING. CIRCULATING AND PREPAIRING TO CEMENT PRODUCTION STRING. PITS AND E&S IN GOOD CONDITION.
1937847 2010-11-08 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON RIG -325 IS DRILLING IN MARCELLUS FORMATION. PITS AND E&S IN GOOD CONDITION.
1937848 2010-11-04 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON RIG - 325 (TD) TODAY, AT 8529'. E&S AND PITS ARE IN GOOD CONDITION. LOCATION IS BEING RESTONED.
1937849 2010-09-06 No Violations Noted HORIZONTAL MARCELLUS, NOMAC -230 COMPLETED TOP HOLE WORK. FINISH DRILLING AT 4715' WITH 7.875" HOLE. FILLED HOLE WITH MUD. MOVED OFF LOCATION. WAITING ON TRIPLE RIG IN FUTURE. E&S CONTROLS LOOK GOOD. PITS ARE IN GOOD CONDITION.
1937852 2010-11-01 No Violations Noted HORIZONTAL MARCELLUS,PATTERSON RIG -325 FINISH RIGGING UP TODAY .PREPAIRING TO START DRILLING TODAY . E&S AND PITS ARE IN GOOD CONDITION.
1945290 2011-01-26 No Violations Noted
2095450 2012-08-27 No Violations Noted Site restored and in production, site id sign in place, tanks in containment, no visible leaks.
2211927 2013-10-11 In Compliance with Policy A spill of 30 gallons of produced water was reported by operator. Spill affected gravel pad surface. Operator reported and addressed spill in compliance with Departments current spill policy.
2211950 2013-10-09 No Violations Noted Act 9 sign up, wells labeled, tanks in containment, no E&S issues.
2339845 2015-01-30 No Violations Noted 3 wells equipped for production. 6 tanks onsite. Site snow covered.

For data sources see[3]

References