X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24369"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-051-24369
 
| Well ID: 37-051-24369
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.969078, -79.838689 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.969078, -79.838689 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: JACKSON FARMS UNIT 37H
 
| Farm/Lease Name: JACKSON FARMS UNIT 37H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 08/05/2010
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 6/30/2010
+
| Permit Date: 2010-06-30
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 39.969078
 
| Latitude: 39.969078
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-06-30
 +
| New Permit Application
 +
|-
 +
| 2010-08-05
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2010-02-11
 +
| 2010-02-11
 +
| style="text-align: right;" | 8,415
 +
| style="text-align: right;" | 6,079,958
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="13"| 1
 +
| rowspan="1"| WG-36
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Water Viscosifier
 +
| Guar Gum
 +
| 9000-30-0
 +
| style="text-align: right;" | 100.0
 +
| style="text-align: right;" | 0.01493
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6116A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Biocide
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5.0
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| ASP 900
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Friction Reducer
 +
| Ammonium Sulfate
 +
| 7783-20-2
 +
| style="text-align: right;" | 30.0
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6486A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.0
 +
| style="text-align: right;" | 0.00746
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| GBW-30
 +
| rowspan="2"| Halliburton
 +
| rowspan="2"| Gel Breaker
 +
| Hemicellulase enzyme
 +
| 9012-54-8
 +
| style="text-align: right;" | 15.0
 +
| style="text-align: right;" | 0.00009000
 +
| style="text-align: right;" |
 +
|-
 +
| Carbohydrates
 +
|
 +
| style="text-align: right;" | 95.0
 +
| style="text-align: right;" | 0.00055
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Proppant (lbs)
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 +
|
 +
|
 +
| style="text-align: right;" | 9.43
 +
| style="text-align: right;" | 10.50139
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Clean Volume (gals)
 +
| rowspan="1"|
 +
| rowspan="1"| Carrier/Base Fluid
 +
|
 +
|
 +
| style="text-align: right;" | 90.57
 +
| style="text-align: right;" | 100.0
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| EC 6116A
 +
| rowspan="2"| Nalco
 +
| rowspan="2"| Biocide
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60.0
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" |
 +
|-
 +
| 1,1-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30.0
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6673W
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.0
 +
| style="text-align: right;" | 0.00693
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 7.5 Hcl Acid
 +
| rowspan="1"| Reagent/PP G
 +
| rowspan="1"| Used to open perfs
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.5
 +
| style="text-align: right;" | 0.27314
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| FR-66
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Friction Reducer
 +
| Hydrotreated Light Distillite
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.0
 +
| style="text-align: right;" | 0.03263
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 70: Line 261:
 
|-
 
|-
 
| 2011
 
| 2011
| [[ATLAS RESOURCES LLC]]
+
| [[CHEVRON APPALACHIA LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 143: Line 334:
 
| 2019
 
| 2019
 
| [[CHEVRON APPALACHIA LLC]]
 
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 29,936.00
+
| style="text-align: right;" | 204,992.00
| style="text-align: right;" | 90
+
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 160: Line 351:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 165: Line 357:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-S02
+
| 2010
| Drilling Fluid Waste (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 1,801.00 Bbl
+
| Fracing Fluid Waste
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 110.00 Bbl
| 301353
 
|-
 
| 2010-S02
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 4,756.00 Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-S02
+
| 2010
| Drilling Fluid Waste (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 251.00 Bbl
+
| Drilling Fluid Waste
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
|-
 
| 2010-S02
 
| Drilling Fluid Waste (in Barrels)
 
 
| style="text-align: right;" | 220.00 Bbl
 
| style="text-align: right;" | 220.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2010-S02
+
| 2010
| Drilling Fluid Waste (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 4,388.00 Bbl
+
| Drilling Fluid Waste
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 4,756.00 Bbl
| WMGR123SW001
 
|-
 
| 2010-S02
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 110.00 Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-S02
+
| 2010
| Fracing Fluid Waste (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 138.00 Bbl
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 4,388.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2011-S01
+
| 2010
| Fracing Fluid Waste (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 2,720.00 Bbl
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1,801.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW001
+
| 301353
 
|-
 
|-
| 2011-S01
+
| 2010
| Fracing Fluid Waste (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 17,657.00 Bbl
+
| Drilling Fluid Waste
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 251.00 Bbl
|
 
|-
 
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 85.00 Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
|  
+
| PA0095273
 
|-
 
|-
| 2011-S01
+
| 2010
| Produced Fluid (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 1,725.00 Bbl
+
| Fracing Fluid Waste
 +
| style="text-align: right;" | 138.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2011-S02
+
| 2011
| Fracing Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 12,523.60 Bbl
+
| Fracing Fluid Waste
 +
| style="text-align: right;" | 15,243.60 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2011-S02
+
| 2011
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 140.00 Bbl
 
| style="text-align: right;" | 140.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-2-3995
 
| 34-121-2-3995
 
|-
 
|-
| 2012-S01
+
| 2011
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 787.00 Bbl
+
| Produced Fluid
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 85.00 Bbl
| 34-121-23995
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
|-
 
| 2012-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 2,641.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
 
|-
 
|-
| 2012-S02
+
| 2011
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 2,930.00 Bbl
+
| Fracing Fluid Waste
 +
| style="text-align: right;" | 17,657.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2013-S01
+
| 2011
| Fracing Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 251.60 Bbl
+
| Produced Fluid
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 1,725.00 Bbl
|  
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 
|-
 
|-
| 2013-S01
+
| 2012
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 1,798.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 5,571.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2013-S02
+
| 2012
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 1,180.00 Bbl
+
| Produced Fluid
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 787.00 Bbl
|  
+
| INJECTION DISPOSAL WELL
 +
| 34-121-23995
 
|-
 
|-
| 2014-S01
+
| 2013
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 513.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 2,978.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-S02
+
| 2013
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 236.67 Bbl
+
| Fracing Fluid Waste
 +
| style="text-align: right;" | 251.60 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-S01
+
| 2014
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 320.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 749.67 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-S02
+
| 2015
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 368.33 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 688.33 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016-S01
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 220.00 Bbl
+
| Produced Fluid
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-S02
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 185.01 Bbl
 
| style="text-align: right;" | 185.01 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2016-S02
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 36.67 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 256.67 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-M01
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 78.67 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 1,540.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW019
+
| WMGR123SW001
 
|-
 
|-
| 2017-M03
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 36.67 Bbl
+
| Produced Fluid
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 77.90 Bbl
| WMGR123SW019
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
|-
 
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 36.67 Bbl
 
| REUSE (AT WELL PAD)
 
 
|  
 
|  
 
|-
 
|-
| 2017-M04
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 36.67 Bbl
+
| Produced Fluid
| REUSE (AT WELL PAD)
+
| style="text-align: right;" | 153.34 Bbl
|
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,540.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW001
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 38.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2017-M07
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 36.67 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 220.02 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-M08
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 36.67 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 147.66 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-M09
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 36.67 Bbl
+
| Produced Fluid
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 36.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 40.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 37.90 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M01
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 38.00 Bbl
 
| style="text-align: right;" | 38.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2018-M01
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 16.67 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 241.68 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2018-M03
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 36.67 Bbl
+
| Produced Fluid
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 36.67 Bbl
 
| style="text-align: right;" | 36.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2018-M05
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 39.33 Bbl
+
| Produced Fluid
| REUSE (AT WELL PAD)
+
| style="text-align: right;" | 353.34 Bbl
|
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 36.67 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 36.67 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 115.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 38.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 36.67 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 36.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 76.67 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
Line 490: Line 579:
 
| 1910853
 
| 1910853
 
| Primary Facility
 
| Primary Facility
| 09/02/2010
+
| 2010-09-02
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 497: Line 586:
 
| 1916494
 
| 1916494
 
| Primary Facility
 
| Primary Facility
| 09/24/2010
+
| 2010-09-24
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 504: Line 593:
 
| 1937845
 
| 1937845
 
| Primary Facility
 
| Primary Facility
| 11/15/2010
+
| 2010-11-15
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 511: Line 600:
 
| 1937847
 
| 1937847
 
| Primary Facility
 
| Primary Facility
| 11/08/2010
+
| 2010-11-08
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 518: Line 607:
 
| 1937848
 
| 1937848
 
| Primary Facility
 
| Primary Facility
| 11/04/2010
+
| 2010-11-04
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 525: Line 614:
 
| 1937849
 
| 1937849
 
| Primary Facility
 
| Primary Facility
| 09/06/2010
+
| 2010-09-06
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 532: Line 621:
 
| 1937852
 
| 1937852
 
| Primary Facility
 
| Primary Facility
| 11/01/2010
+
| 2010-11-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 539: Line 628:
 
| 1945290
 
| 1945290
 
| Primary Facility
 
| Primary Facility
| 01/26/2011
+
| 2011-01-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 546: Line 635:
 
| 2095450
 
| 2095450
 
| Primary Facility
 
| Primary Facility
| 08/27/2012
+
| 2012-08-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 553: Line 642:
 
| 2211927
 
| 2211927
 
| Primary Facility
 
| Primary Facility
| 10/11/2013
+
| 2013-10-11
 
| Administrative/File Review
 
| Administrative/File Review
 
| In Compliance with Policy
 
| In Compliance with Policy
Line 560: Line 649:
 
| 2211950
 
| 2211950
 
| Primary Facility
 
| Primary Facility
| 10/09/2013
+
| 2013-10-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 567: Line 656:
 
| 2301604
 
| 2301604
 
| Primary Facility
 
| Primary Facility
| 09/04/2014
+
| 2014-09-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 574: Line 663:
 
| 2339845
 
| 2339845
 
| Primary Facility
 
| Primary Facility
| 01/30/2015
+
| 2015-01-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 581: Line 670:
 
| 2405885
 
| 2405885
 
| Primary Facility
 
| Primary Facility
| 08/17/2015
+
| 2015-08-17
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 651: Line 740:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
| 1
 
| 02/11/2010
 
| 02/11/2010
 
| style="text-align: right;" | 8415.0
 
| style="text-align: right;" | 6079958.0
 
| style="text-align: right;" |
 
|-
 
|}
 
==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|- valign="top"
 
| rowspan="13"| 1
 
| rowspan="1"| WG-36
 
| rowspan="1"| Halliburton
 
| rowspan="1"| Water Viscosifier
 
| Guar Gum
 
| 9000-30-0
 
| style="text-align: right;" | 100.0
 
| style="text-align: right;" | 0.01493
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="1"| EC6116A
 
| rowspan="1"| Nalco
 
| rowspan="1"| Biocide
 
| Dibromoacetonitrile
 
| 3252-43-5
 
| style="text-align: right;" | 5.0
 
| style="text-align: right;" | None
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="1"| ASP 900
 
| rowspan="1"| Nalco
 
| rowspan="1"| Friction Reducer
 
| Ammonium Sulfate
 
| 7783-20-2
 
| style="text-align: right;" | 30.0
 
| style="text-align: right;" | None
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="1"| EC6486A
 
| rowspan="1"| Nalco
 
| rowspan="1"| Scale Inhibitor
 
| Ethylene Glycol
 
| 107-21-1
 
| style="text-align: right;" | 30.0
 
| style="text-align: right;" | 0.00746
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="2"| GBW-30
 
| rowspan="2"| Halliburton
 
| rowspan="2"| Gel Breaker
 
| Hemicellulase enzyme
 
| 9012-54-8
 
| style="text-align: right;" | 15.0
 
| style="text-align: right;" | 0.00009000
 
| style="text-align: right;" |
 
|-
 
| Carbohydrates
 
|
 
| style="text-align: right;" | 95.0
 
| style="text-align: right;" | 0.00055
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="1"| Proppant (lbs)
 
| rowspan="1"|
 
| rowspan="1"| Proppant
 
|
 
|
 
| style="text-align: right;" | 9.43
 
| style="text-align: right;" | 10.50139
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="1"| Clean Volume (gals)
 
| rowspan="1"|
 
| rowspan="1"| Carrier/Base Fluid
 
|
 
|
 
| style="text-align: right;" | 90.57
 
| style="text-align: right;" | 100.0
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="2"| EC 6116A
 
| rowspan="2"| Nalco
 
| rowspan="2"| Biocide
 
| Polyethylene Glycol
 
| 25322-68-3
 
| style="text-align: right;" | 60.0
 
| style="text-align: right;" | None
 
| style="text-align: right;" |
 
|-
 
| 1,1-Dibromo-3-nitrilopropionamide
 
| 10222-01-2
 
| style="text-align: right;" | 30.0
 
| style="text-align: right;" | None
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="1"| EC6673W
 
| rowspan="1"| Nalco
 
| rowspan="1"| Iron Control
 
| Ethylene Glycol
 
| 107-21-1
 
| style="text-align: right;" | 30.0
 
| style="text-align: right;" | 0.00693
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="1"| 7.5 Hcl Acid
 
| rowspan="1"| Reagent/PP G
 
| rowspan="1"| Used to open perfs
 
| Hydrochloric Acid
 
| 7647-01-0
 
| style="text-align: right;" | 7.5
 
| style="text-align: right;" | 0.27314
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="1"| FR-66
 
| rowspan="1"| Halliburton
 
| rowspan="1"| Friction Reducer
 
| Hydrotreated Light Distillite
 
| 64742-47-8
 
| style="text-align: right;" | 30.0
 
| style="text-align: right;" | 0.03263
 
| style="text-align: right;" |
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =FracFocus Fracking Chemicals Database
 
| date = 2019-04-02
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-06-19 }}</ref>
 
 
==References==
 
==References==
 
<references/>
 
<references/>

Latest revision as of 12:38, 16 May 2020

Well Details

Well ID: 37-051-24369
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Redstone Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148606
Farm/Lease Name: JACKSON FARMS UNIT 37H
License Status:
Spud Date:
Permit Date: 2010-06-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.969078
Longitude: -79.838689

For data sources see[1][2][3]

Well History

Date Event
2010-06-30 New Permit Application
2010-08-05 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2010-02-11 2010-02-11 8,415 6,079,958

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WG-36 Halliburton Water Viscosifier Guar Gum 9000-30-0 100.0 0.01493
EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5.0 None
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30.0 None
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30.0 0.00746
GBW-30 Halliburton Gel Breaker Hemicellulase enzyme 9012-54-8 15.0 0.00009000
Carbohydrates 95.0 0.00055
Proppant (lbs) Proppant 9.43 10.50139
Clean Volume (gals) Carrier/Base Fluid 90.57 100.0
EC 6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60.0 None
1,1-Dibromo-3-nitrilopropionamide 10222-01-2 30.0 None
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30.0 0.00693
7.5 Hcl Acid Reagent/PP G Used to open perfs Hydrochloric Acid 7647-01-0 7.5 0.27314
FR-66 Halliburton Friction Reducer Hydrotreated Light Distillite 64742-47-8 30.0 0.03263

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 852,493.00 366 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 684,859.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 521,186.00 334 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 375,169.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 284,940.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 232,263.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 112,874.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 204,992.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 ATLAS RESOURCES LLC Drilling Fluid Waste 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 ATLAS RESOURCES LLC Drilling Fluid Waste 4,756.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 ATLAS RESOURCES LLC Drilling Fluid Waste 4,388.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2010 ATLAS RESOURCES LLC Drilling Fluid Waste 1,801.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 ATLAS RESOURCES LLC Drilling Fluid Waste 251.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 138.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 15,243.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Produced Fluid 140.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011 CHEVRON APPALACHIA LLC Produced Fluid 85.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 17,657.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHEVRON APPALACHIA LLC Produced Fluid 1,725.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Produced Fluid 5,571.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Produced Fluid 787.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013 CHEVRON APPALACHIA LLC Produced Fluid 2,978.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 251.60 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 749.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 688.33 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 185.01 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 256.67 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,540.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 77.90 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 153.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 220.02 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 147.66 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 38.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 241.68 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 353.34 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1910853 Primary Facility 2010-09-02 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS , FINISH SETTING CONDUTOR, STARTED DRILLING SURFACE CASING,SITE LOOKS CLEAN,E&S LOOKS GOOD. PERMIT # ARE MISSING OUT AT ROAD.
1916494 Primary Facility 2010-09-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,CONDUTOR SET 24"@ 80'.
1937845 Primary Facility 2010-11-15 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON - 325 IS FINISHING RUNNING 5 1/2"CASING. CIRCULATING AND PREPAIRING TO CEMENT PRODUCTION STRING. PITS AND E&S IN GOOD CONDITION.
1937847 Primary Facility 2010-11-08 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON RIG -325 IS DRILLING IN MARCELLUS FORMATION. PITS AND E&S IN GOOD CONDITION.
1937848 Primary Facility 2010-11-04 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON RIG - 325 (TD) TODAY, AT 8529'. E&S AND PITS ARE IN GOOD CONDITION. LOCATION IS BEING RESTONED.
1937849 Primary Facility 2010-09-06 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, NOMAC -230 COMPLETED TOP HOLE WORK. FINISH DRILLING AT 4715' WITH 7.875" HOLE. FILLED HOLE WITH MUD. MOVED OFF LOCATION. WAITING ON TRIPLE RIG IN FUTURE. E&S CONTROLS LOOK GOOD. PITS ARE IN GOOD CONDITION.
1937852 Primary Facility 2010-11-01 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,PATTERSON RIG -325 FINISH RIGGING UP TODAY .PREPAIRING TO START DRILLING TODAY . E&S AND PITS ARE IN GOOD CONDITION.
1945290 Primary Facility 2011-01-26 Routine/Complete Inspection No Violations Noted
2095450 Primary Facility 2012-08-27 Routine/Complete Inspection No Violations Noted Site restored and in production, site id sign in place, tanks in containment, no visible leaks.
2211927 Primary Facility 2013-10-11 Administrative/File Review In Compliance with Policy A spill of 30 gallons of produced water was reported by operator. Spill affected gravel pad surface. Operator reported and addressed spill in compliance with Departments current spill policy.
2211950 Primary Facility 2013-10-09 Routine/Complete Inspection No Violations Noted Act 9 sign up, wells labeled, tanks in containment, no E&S issues.
2301604 Primary Facility 2014-09-04 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus and brine tanks appear to be in sound working condition.
2339845 Primary Facility 2015-01-30 Routine/Complete Inspection No Violations Noted 3 wells equipped for production. 6 tanks onsite. Site snow covered.
2405885 Primary Facility 2015-08-17 Routine/Complete Inspection No Violations Noted
2569927 Primary Facility 2017-03-09 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed.
2570541 Primary Facility 2017-03-09 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed.
2574488 Primary Facility 2017-03-08 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS, Routine Inspection all looks good . Operator installing plunger in well.
2735772 Primary Facility 2018-05-29 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed.
2756381 Primary Facility 2018-07-26 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. It appeared hay had recently been cut off the site. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.

For data sources see[8]

References