X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24367"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-051-24367
 
| Well ID: 37-051-24367
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.740383, -79.439622 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.740383, -79.439622 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Fayette County, Pennsylvania|Fayette]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Henry Clay Township, Fayette County, Pennsylvania|Henry Clay Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC]]
+
| County: [[Fayette_County,_Pennsylvania|Fayette]]
 
|-
 
|-
| Well Pad ID: [[146309|146309]]
+
| Municipality: [[Henry Clay Township,_Fayette_County,_Pennsylvania|Henry Clay Township]]
 
|-
 
|-
| Farm/Lease Name: HUMBERSTON UNIT 1H
+
| Operator Name: [[LPR ENERGY LLC]]
 
|-
 
|-
| First Permit Date: 2010-07-13
+
| Well Pad ID: [[146309]]
 
|-
 
|-
| Last Permit Date: 2010-07-13
+
| Farm/Lease Name: HUMBERSTON UNIT
 
|-
 
|-
| Spud Date: 2011-01-28
+
| License Status: Inactive
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date:  
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 2010-07-13
 
|-
 
|-
| Well Status: ACTIVE
+
| Well Type: GAS
 
|-
 
|-
| Violations: 0
+
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 39.740383
 
| Latitude: 39.740383
 
|-
 
|-
 
| Longitude: -79.439622
 
| Longitude: -79.439622
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-07-13
 +
| New Permit Application
 +
|-
 +
| 2011-01-28
 +
| Performed Spud Operation
 +
|-
 +
| 2019-12-17
 +
| Inactive Well Request Granted
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Job Number
!scope="col" | GAS QUANTITY
+
!scope="col" | Job Start Date
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Job End Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | True Vertical Depth (ft)
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Total Water Volume (gal)
!scope="col" | OIL QUANTITY
+
!scope="col" | Total Non-Water Volume (gal)
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2010-3
+
| 1
| style="text-align:right;" | 0.0
+
| 2011-05-27
| style="text-align:right;" | 0.0
+
| 2011-05-27
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 8,499
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 831,180
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 2010-2
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="20"| 1
| style="text-align:right;" | 0.0
+
| rowspan="2"| Sand (Proppant)
| style="text-align:right;" | 0.0
+
| rowspan="2"| Superior Well Services
| style="text-align:right;" | 0.0
+
| rowspan="2"| Propping Agent
| style="text-align:right;" | 0.0
+
|
| style="text-align:right;" | 0.0
+
|
 +
| style="text-align: right;" |  
 +
| style="text-align: right;" |  
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| Quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 99.90
 +
| style="text-align: right;" | 16.45
 +
| style="text-align: right;" |
 
|-
 
|-
| 2010-2
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="5"| KR-153SL
| style="text-align:right;" | 0.0
+
| rowspan="5"| Superior Well Services
| style="text-align:right;" | 0.0
+
| rowspan="5"| Biocide
| style="text-align:right;" | 0.0
+
|
| style="text-align:right;" | 0.0
+
|
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
 +
| style="text-align: right;" |  
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 1.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2011-1
+
| Polyethylene glycol
| style="text-align:right;" | 0.0
+
| 25322-68-3
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 50.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 20.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 
|-
 
|-
| 2011-2
+
| Diethylene glycol
| style="text-align:right;" | 0.0
+
| 111-46-6
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="5"| Super Scale Control TSC
 +
| rowspan="5"| Superior Well Services
 +
| rowspan="5"| Scale Inhibitor
 +
| Anionic Copolymer
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2011-2
+
| 1,2,4-Butanetricarboxylic acid, 2-phosphono-
| style="text-align:right;" | 0.0
+
| 37971-36-1
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| Anionic Polymer
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2012-1
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 1,2-Propylene glycol
 +
| 57-55-6
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.05
 +
| style="text-align: right;" |
 
|-
 
|-
| 2012-2
+
|- valign="top"
| style="text-align:right;" | 0.0
+
| rowspan="1"| Water
| style="text-align:right;" | 0.0
+
| rowspan="1"|  
| style="text-align:right;" | 0.0
+
| rowspan="1"| Base Fluid
| style="text-align:right;" | 0.0
+
| Water
| style="text-align:right;" | 0.0
+
|
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 83.21
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="2"| FE OXCLEAR
 +
| rowspan="2"| Superior Well Services
 +
| rowspan="2"| Oxygen Scavenger
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2013-1
+
| Ammonium bisulfite
| style="text-align:right;" | 0.0
+
| 10192-30-0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.09
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="5"| WFR-3B
 +
| rowspan="5"| Superior Well Services
 +
| rowspan="5"| Friction Reducer
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.17
 +
| style="text-align: right;" |
 
|-
 
|-
| 2013-2
+
| 1,2-Propylene glycol
| style="text-align:right;" | 0.0
+
| 57-55-6
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 25.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Stoddard solvent
 +
| 8052-41-3
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Ethoxylated C12-16 alcohols
 +
| 68551-12-2
 +
| style="text-align: right;" | 4.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2014-1
+
| 2010
| style="text-align:right;" | 0.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-2
+
| 2012
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-02
+
| 2014
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-01
+
| 2016
| style="text-align:right;" | 0.0
+
| [[LPR ENERGY LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-03
+
| 2019
| style="text-align:right;" | 0.0
+
| [[LPR ENERGY LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-1
+
| 2011
| DRILL CUTTINGS
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 808.15
+
| Drilling Fluid Waste
| Tons
+
| style="text-align: right;" | 1,480.00 Bbl
 
| LANDFILL
 
| LANDFILL
| 100172
+
| NY STATE #32S11
| ARDEN LANDFILL
 
| WASHINGTON
 
| PA
 
 
|-
 
|-
|-
+
| 2011
| 2011-1
+
| [[CHIEF OIL & GAS LLC]]
| DRILLING FLUID WASTE
+
| Drill Cuttings
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 808.15 Tons
| Bbl
 
 
| LANDFILL
 
| LANDFILL
| NY STATE #32S11
+
| 100172
| ALLIED WASTE SYSTEMS
 
| NIAGARA FALLS
 
| NY
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1958062
 
| 1958062
 +
| Primary Facility
 
| 2011-02-04
 
| 2011-02-04
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS. PLANNING TO SET INTERMEDIATE STRING OF 95/8" CASING AND CEMENTING EARLY MORNING @ 1817'. CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 1535' AT PRESENT TIME.
 
| HORIZONTAL MARCELLUS. PLANNING TO SET INTERMEDIATE STRING OF 95/8" CASING AND CEMENTING EARLY MORNING @ 1817'. CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 1535' AT PRESENT TIME.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1958068
 
| 1958068
 +
| Primary Facility
 
| 2011-01-31
 
| 2011-01-31
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS, PLANNING TO SET SURFACE TONIGHT @ 550' AND CEMENTING .E&S AND PITS ARE IN GOOD CONDITION.
 
| HORIZONTAL MARCELLUS, PLANNING TO SET SURFACE TONIGHT @ 550' AND CEMENTING .E&S AND PITS ARE IN GOOD CONDITION.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1959310
 
| 1959310
 +
| Primary Facility
 
| 2011-03-22
 
| 2011-03-22
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1960986
 
| 1960986
 +
| Primary Facility
 
| 2011-03-21
 
| 2011-03-21
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 7536' TODAY.
 
| HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 7536' TODAY.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1961190
 
| 1961190
 +
| Primary Facility
 
| 2011-03-07
 
| 2011-03-07
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD.UDI # 59  MOVING ON AND SETTING UP 3/7/2011.
 
| HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD.UDI # 59  MOVING ON AND SETTING UP 3/7/2011.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1977465
 
| 1977465
 +
| Primary Facility
 
| 2011-06-01
 
| 2011-06-01
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1984217
 
| 1984217
 +
| Primary Facility
 
| 2011-03-31
 
| 2011-03-31
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 12,230' TODAY. PLANNING (TD) TONIGHT @ 12,682' , RUNNING 51/2" CASING TONIGHT,CEMENTING LATE 4/1/2011.
 
| HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 12,230' TODAY. PLANNING (TD) TONIGHT @ 12,682' , RUNNING 51/2" CASING TONIGHT,CEMENTING LATE 4/1/2011.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2134860
 
| 2134860
 +
| Primary Facility
 
| 2013-01-30
 
| 2013-01-30
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site ID sign in place, E&S and PPC plan in box, area gated and locked.  Well head labeled, E&S in place and functioning no accelrated erosion.
 
| Site ID sign in place, E&S and PPC plan in box, area gated and locked.  Well head labeled, E&S in place and functioning no accelrated erosion.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2165178
 
| 2165178
 +
| Primary Facility
 
| 2013-05-09
 
| 2013-05-09
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site Id in place.  Site gated and locked.  Restoration work has been completed.  Soil piles, sed traps, and diversion channels are removed, seeded and mulched.
 
| Site Id in place.  Site gated and locked.  Restoration work has been completed.  Soil piles, sed traps, and diversion channels are removed, seeded and mulched.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2188009
 
| 2188009
 +
| Primary Facility
 
| 2013-07-30
 
| 2013-07-30
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Well inactive, site locked, new act 9 sign in place, no E&S issues.
 
| Well inactive, site locked, new act 9 sign in place, no E&S issues.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2277566
 +
| Primary Facility
 +
| 2014-06-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On 6/10/2014, the Department conducted an inspection of the Chevron Appalachia’s Humbertson Unit 1H well  in Henry Clay Twp, Fayette County.
 
|-
 
|-
 
| 2373211
 
| 2373211
 +
| Primary Facility
 
| 2015-05-20
 
| 2015-05-20
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|  On 05/20/15 at approximately 0900 hours I met with representatives of Chevron Appalachia LLC to discuss the restoration of the Humberston Unit. The site had been disturbed by a farmer spreading fertilizer and getting his equipment stuck. The location of the removed impoundment was sparsely vegetated. The determination was that Chevron is going to repair the damage caused by the farmer and seed and mulch the location and submit for an NOT once they achieve a uniform 70% growth.
 
|
 
|
 
 
|  
 
|  
 +
|-
 +
| 2587210
 +
| Primary Facility
 +
| 2017-04-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The well head appeared to be in good condition. There were no violations observed at the time of inspection.
 +
|-
 +
| 2627015
 +
| Primary Facility
 +
| 2017-06-28
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine Inspection , One year  Inactive Status  Extension  meets (DEP) requirments  (6/26/2017) . The new operator presented info on future pipe line installation.The well is Shut - In and secure at this time.
 +
|-
 +
| 2693205
 +
| Primary Facility
 +
| 2018-02-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| According to the Department records, regulatory inactive status was granted an extension for one year on 6-26-2017.
 +
Well head surrounded by security fence.
 +
Department unable to fully examine documentation on site due to animal activity in mailbox. Department recommends operator maintain mailbox and documents to ensure Department is able to safely review paperwork.
 +
Department unable to determine if ESCGP for this site is terminated. Department recommends operator provide documentation showing NOT is approved.
 +
|-
 +
| 2852029
 +
| Primary Facility
 +
| 2019-03-12
 +
| Compliance Evaluation
 +
| No Violations Noted
 +
| This well is tagged and under regulatory inactive status.
 +
 +
The well head casing and poly fluid collection tank look ok.
 +
 +
The operator states on the inactive status application that LPR will begin production on nearby wells by the end of October, 2018 and that the results of these wells will help to evaluate the economics of building a pipeline to the Humberston Well Pad. The operator then states that if the economics do not support the cost of building the pipeline infrastructure then the operator will proceed with Plugging and Abandoning the well by October 2019.
 +
 +
A follow up compliance inspection will be conducted at this site on a future date.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 12:37, 16 May 2020

Well Details

Well ID: 37-051-24367
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Henry Clay Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 146309
Farm/Lease Name: HUMBERSTON UNIT
License Status: Inactive
Spud Date:
Permit Date: 2010-07-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.740383
Longitude: -79.439622

For data sources see[1][2][3]

Well History

Date Event
2010-07-13 New Permit Application
2011-01-28 Performed Spud Operation
2019-12-17 Inactive Well Request Granted

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-05-27 2011-05-27 8,499 831,180

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Superior Well Services Propping Agent
Quartz 14808-60-7 99.90 16.45
KR-153SL Superior Well Services Biocide
Ethylene glycol 107-21-1 1.00
Polyethylene glycol 25322-68-3 50.00
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.02
Diethylene glycol 111-46-6
Super Scale Control TSC Superior Well Services Scale Inhibitor Anionic Copolymer
1,2,4-Butanetricarboxylic acid, 2-phosphono- 37971-36-1
Anionic Polymer
1,2-Propylene glycol 57-55-6 0.05
Water Base Fluid Water 100.00 83.21
FE OXCLEAR Superior Well Services Oxygen Scavenger
Ammonium bisulfite 10192-30-0 0.09
WFR-3B Superior Well Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 0.17
1,2-Propylene glycol 57-55-6 25.00
Stoddard solvent 8052-41-3 10.00
Ethoxylated C12-16 alcohols 68551-12-2 4.00

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0
2019 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHIEF OIL & GAS LLC Drilling Fluid Waste 1,480.00 Bbl LANDFILL NY STATE #32S11
2011 CHIEF OIL & GAS LLC Drill Cuttings 808.15 Tons LANDFILL 100172

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1958062 Primary Facility 2011-02-04 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS. PLANNING TO SET INTERMEDIATE STRING OF 95/8" CASING AND CEMENTING EARLY MORNING @ 1817'. CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 1535' AT PRESENT TIME.
1958068 Primary Facility 2011-01-31 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PLANNING TO SET SURFACE TONIGHT @ 550' AND CEMENTING .E&S AND PITS ARE IN GOOD CONDITION.
1959310 Primary Facility 2011-03-22 Routine/Complete Inspection No Violations Noted
1960986 Primary Facility 2011-03-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 7536' TODAY.
1961190 Primary Facility 2011-03-07 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD.UDI # 59 MOVING ON AND SETTING UP 3/7/2011.
1977465 Primary Facility 2011-06-01 Routine/Complete Inspection No Violations Noted
1984217 Primary Facility 2011-03-31 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 12,230' TODAY. PLANNING (TD) TONIGHT @ 12,682' , RUNNING 51/2" CASING TONIGHT,CEMENTING LATE 4/1/2011.
2134860 Primary Facility 2013-01-30 Routine/Complete Inspection No Violations Noted Site ID sign in place, E&S and PPC plan in box, area gated and locked. Well head labeled, E&S in place and functioning no accelrated erosion.
2165178 Primary Facility 2013-05-09 Routine/Complete Inspection No Violations Noted Site Id in place. Site gated and locked. Restoration work has been completed. Soil piles, sed traps, and diversion channels are removed, seeded and mulched.
2188009 Primary Facility 2013-07-30 Routine/Complete Inspection No Violations Noted Well inactive, site locked, new act 9 sign in place, no E&S issues.
2277566 Primary Facility 2014-06-10 Routine/Complete Inspection No Violations Noted On 6/10/2014, the Department conducted an inspection of the Chevron Appalachia’s Humbertson Unit 1H well in Henry Clay Twp, Fayette County.
2373211 Primary Facility 2015-05-20 Routine/Complete Inspection No Violations Noted
2587210 Primary Facility 2017-04-26 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The well head appeared to be in good condition. There were no violations observed at the time of inspection.
2627015 Primary Facility 2017-06-28 Routine/Complete Inspection No Violations Noted Routine Inspection , One year Inactive Status Extension meets (DEP) requirments (6/26/2017) . The new operator presented info on future pipe line installation.The well is Shut - In and secure at this time.
2693205 Primary Facility 2018-02-12 Routine/Complete Inspection No Violations Noted According to the Department records, regulatory inactive status was granted an extension for one year on 6-26-2017.

Well head surrounded by security fence. Department unable to fully examine documentation on site due to animal activity in mailbox. Department recommends operator maintain mailbox and documents to ensure Department is able to safely review paperwork. Department unable to determine if ESCGP for this site is terminated. Department recommends operator provide documentation showing NOT is approved.

2852029 Primary Facility 2019-03-12 Compliance Evaluation No Violations Noted This well is tagged and under regulatory inactive status.

The well head casing and poly fluid collection tank look ok.

The operator states on the inactive status application that LPR will begin production on nearby wells by the end of October, 2018 and that the results of these wells will help to evaluate the economics of building a pipeline to the Humberston Well Pad. The operator then states that if the economics do not support the cost of building the pipeline infrastructure then the operator will proceed with Plugging and Abandoning the well by October 2019.

A follow up compliance inspection will be conducted at this site on a future date.

For data sources see[8]

References