X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24317

Well Details

Well ID: 37-051-24317
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Redstone Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149315
Farm/Lease Name: SKOVRAN UNIT 33H
License Status: Active
Spud Date: 06/25/2010
Permit Date: 2/2/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.935214
Longitude: -79.853547

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 ATLAS RESOURCES LLC 485,155.00 365 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 387,484.00 366 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 260,580.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 182,204.00 334 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 162,620.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 128,386.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 122,614.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 100,509.00 335 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 25,770.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-S02 Drilling Fluid Waste (in Barrels) 3,710.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S02 Drilling Fluid Waste (in Barrels) 2,780.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S02 Fracing Fluid Waste (in Barrels) 5,410.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S02 Fracing Fluid Waste (in Barrels) 740.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S02 Fracing Fluid Waste (in Barrels) 10,475.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011-S01 Fracing Fluid Waste (in Barrels) 3,260.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2011-S01 Fracing Fluid Waste (in Barrels) 690.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-S01 Fracing Fluid Waste (in Barrels) 1,515.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011-S01 Fracing Fluid Waste (in Barrels) 475.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011-S01 Fracing Fluid Waste (in Barrels) 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011-S01 Fracing Fluid Waste (in Barrels) 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011-S01 Fracing Fluid Waste (in Barrels) 10,830.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S01 Produced Fluid (in Barrels) 844.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011-S01 Produced Fluid (in Barrels) 3,088.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2011-S01 Produced Fluid (in Barrels) 268.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2011-S01 Produced Fluid (in Barrels) 115.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011-S01 Produced Fluid (in Barrels) 230.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011-S01 Produced Fluid (in Barrels) 415.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2011-S02 Fracing Fluid Waste (in Barrels) 1,085.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011-S02 Fracing Fluid Waste (in Barrels) 2,049.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S02 Produced Fluid (in Barrels) 720.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011-S02 Produced Fluid (in Barrels) 190.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Produced Fluid (in Barrels) 160.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Produced Fluid (in Barrels) 290.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 455.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 160.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 334.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 265.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 196.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 262.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 215.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 332.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2017-M02 Produced Fluid (in Barrels) RWC 802 117.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M03 Produced Fluid (in Barrels) RWC 802 50.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M05 Produced Fluid (in Barrels) RWC 802 2,415.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M06 Produced Fluid (in Barrels) RWC 802 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M07 Produced Fluid (in Barrels) RWC 802 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M09 Produced Fluid (in Barrels) RWC 802 57.50 Bbl REUSE (AT WELL PAD)
2017-M12 Produced Fluid (in Barrels) RWC 802 55.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M01 Produced Fluid (in Barrels) RWC 802 57.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M02 Produced Fluid (in Barrels) RWC 802 57.50 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 55.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M05 Produced Fluid (in Barrels) RWC 802 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M07 Produced Fluid (in Barrels) RWC 802 57.00 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 50.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019-M01 Produced Fluid (in Barrels) RWC 802 55.00 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 60.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1889633 Primary Facility 05/07/2010 Routine/Complete Inspection No Violations Noted
1898685 Primary Facility 07/12/2010 Drilling/Alteration No Violations Noted
1939657 Primary Facility 12/23/2010 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS ,FRACING 2 - WELLS AT SAME TIME.FIVE OF TEN STAGES COMPLETE .SHUT DOWN TO REPLACE PILOT VALVE ON TOP OF FRAC TREE. E&S LOOKS GOOD. THE DRIVEWAY IS TRACKING UP WITH MUD FROM WATER TRUCK TRAFFIC. STONE IS ON ITS WAY TO LOCATION THE MAIN ROAD IS BEING MAINTAIN BY A TRUCK SWEEPER.
1941760 Primary Facility 01/05/2011 Routine/Complete Inspection No Violations Noted
1983035 Primary Facility 06/21/2011 Routine/Complete Inspection No Violations Noted

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/08/2010 12/08/2010 6086.0 3065079.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FR-66 Halliburton Friction Reducer Hydrotreated Light Distillite 64742-47-8 30.0 0.0315
GBW-30 Halliburton Gel Breaker Carbohydrates 95.0 0.00004000
Hemicellulase enzyme 9012-54-8 15.0 0.00001000
Proppant (lbs) Proppant 9.29 10.32824
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30.0 0.00683
EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5.0 0.00126
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30.0 None
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30.0 0.00744
Clean Volume (gals) Carrier/Base Fluid 90.71 100.0
EC 6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60.0 0.01513
1,1-Dibromo-3-nitrilopropionamide 10222-01-2 30.0 0.00756
7.5 Hcl Acid Reagent/PP G Used to open perfs Hydrochloric Acid 7647-01-0 7.5 0.23868
WG-36 Halliburton Water Viscosifier Guar Gum 9000-30-0 100.0 0.00116

For data sources see[7]

References