X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0736051904002

Well Details

Well ID: 0736051904002
Loading map...
Location: 00/04-19-073-05W6/2
Location Alias: 00/04-19-73-05 W6M
Location Alias 2: 00/04-19-073-05 W6/02
Country: Canada
Province: Alberta
Township: 073
Meridian: 6
Range: 05
Section: 19
County/Municipality: Sexsmith
Well Name: PRED CLAIR 4-19-73-5
Operator Name: Firenze Energy Ltd.
License Number: 0217313
License Date: 1998-08-31
License Status: Amended
Spud Date: 1998-09-12
Final Drill Date: 1998-09-22
Well Total Depth: 1891.00 m
Surface Hole Latitude: 55.332773
Surface Hole Longitude: -118.765302

For data sources see[1][2]

Well History

Date Event
1998-08-31 Obtained License
1998-09-13 Surface Casing Operation Performed
1998-09-14 Direction Drilling Operation Performed - Deviate
1998-09-20 Well Log Performed
1998-09-21 Production Casing Operation Performed
1998-09-21 Well Log Performed
1998-09-22 Finished Drilling
1998-09-22 Well Mode changed to Drilled and Cased
1998-09-23 Drill Stem Test Performed
1998-09-23 Well Log Performed
1998-09-24 Rig Released
1998-10-22 Perforation Treatment Performed - Jet Perforation
1998-10-22 Well Log Performed
1998-10-24 Perforation Treatment Performed - Fractured
2002-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-23 Plug Back Performed
2002-06-24 Perforation Treatment Performed - Jet Perforation
2002-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-26 Perforation Treatment Performed - Fractured
2002-08-18 Well Began Production
2002-08-18 Well Fluid changed to Crude Oil
2002-08-18 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-09-14 1231.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-10-22 Perforation 1859.00 1862.00 13
1998-10-24 Fracture 1859.00 1862.00 0
2002-06-23 Packing Device Capped w/Cement 1855.00 1863.00 0
2002-06-24 Perforation 792.00 793.00 14
2002-06-25 Acid Treatment 792.00 793.00 0
2002-06-26 Fracture 792.00 793.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 2702 0.0 0.0 0.0
2003 8463 0.0 0.0 0.0
2004 8482 0.0 0.0 0.0
2005 7901 0.0 0.0 0.0
2006 8480 0.0 0.0 0.0
2007 8531 0.0 0.0 0.0
2008 8515 0.0 0.0 0.0
2009 8092 0.0 0.0 0.0
2010 8339 0.0 0.0 0.0
2011 8441 0.0 0.0 0.0
2012 8685 0.0 0.0 0.0
2013 8485 0.0 0.0 0.0
2014 8271 0.0 0.0 0.0
2015 8721 0.0 0.0 0.0
2016 8552 0.0 0.0 0.0
2017 8654 0.0 0.0 0.0
2018 8199 0.0 0.0 0.0
2019 952 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-06-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References