X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624083005000

Well Details

Well ID: 0624083005000
Loading map...
Location: 00/05-30-062-08W4/0
Location Alias: 00/05-30-62-08 W4M
Location Alias 2: 00/05-30-062-08 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 08
Section: 30
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: CNRL 5B BNNYVLLE 5-30-62-8
Operator Name: Canadian Natural Resources Limited
License Number: 0439800
License Date: 2011-11-29
License Status: Suspension
Spud Date: 2012-10-14
Final Drill Date: 2012-10-16
Well Total Depth: 613.00 m
Surface Hole Latitude: 54.393110
Surface Hole Longitude: -111.202286

For data sources see[1][2]

Well History

Date Event
2011-11-29 Obtained License
2012-10-14 Direction Drilling Operation Performed - Deviate
2012-10-15 Surface Casing Operation Performed
2012-10-16 Finished Drilling
2012-10-16 Well Log Performed
2012-10-16 Well Mode changed to Drilled and Cased
2012-10-17 Production Casing Operation Performed
2012-10-17 Rig Released
2012-10-30 Perforation Treatment Performed - Jet Perforation
2012-10-31 Well Began Production
2012-10-31 Well Fluid changed to Crude Bitumen
2012-10-31 Well Mode changed to Pumping
2013-03-06 Perforation Treatment Performed - Chemical Squeeze
2013-06-28 Perforation Treatment Performed - Cement Plug
2013-06-30 Perforation Treatment Performed - Jet Perforation
2015-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-05-28 Perforation Treatment Performed - Jet Perforation
2015-05-28 Plug Back Performed
2015-05-28 Well Fluid changed to Crude Bitumen
2015-05-28 Well Log Performed
2015-05-28 Well Mode changed to Abandoned Zone

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-14 Precision Drilling Corporation 171 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-14 0.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-30 Perforation 526.00 530.00 26
2013-03-06 Chemical Squeeze 526.00 530.00 0
2013-06-28 Cement Plug 530.00 598.90 0
2013-06-30 Perforation 508.50 514.00 26
2015-05-28 Packing Device Capped w/Cement 514.20 524.00 0
2015-05-28 Packing Device Capped w/Cement 492.00 507.00 0
2015-05-28 Perforation 465.00 468.00 26

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 3705 0.0 0.0 0.0
2014 7022 0.0 0.0 0.0
2015 3359 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-17 No Incident Encountered 0.00 0.00
2012-11-01 No Incident Encountered 0.00 0.00
2013-06-30 No Incident Encountered 0.00 0.00
2015-05-29 No Incident Encountered 0.00 0.00

For data sources see[8]

References