X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-033-27072"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-033-27072
 
| Well ID: 37-033-27072
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.143747, -78.433155 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.143747, -78.433156 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Clearfield County, Pennsylvania|Clearfield]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Lawrence Township, Clearfield County, Pennsylvania|Lawrence Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[EOG RESOURCES INC]]
+
| County: [[Clearfield_County,_Pennsylvania|Clearfield]]
 
|-
 
|-
| Well Pad ID: [[149095|149095]]
+
| Municipality: [[Lawrence Township,_Clearfield_County,_Pennsylvania|Lawrence Township]]
 +
|-
 +
| Operator Name: [[SENECA RESOURCES CO LLC]]
 +
|-
 +
| Well Pad ID: [[149095]]
 
|-
 
|-
 
| Farm/Lease Name: PPHC 3H
 
| Farm/Lease Name: PPHC 3H
 
|-
 
|-
| First Permit Date: 2011-09-14
+
| License Status: Plugged and Abandoned
 
|-
 
|-
| Last Permit Date: 2012-12-20
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2011-12-07
+
| Permit Date: 2011-09-14
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Well Status: ACTIVE
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: 0
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.143747
 
| Latitude: 41.143747
 
|-
 
|-
| Longitude: -78.433155
+
| Longitude: -78.433156
|-
 
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Date
!scope="col" | GAS QUANTITY
+
!scope="col" | Event
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2011-2
+
| 2011-09-14
| style="text-align:right;" | 0.0
+
| New Permit Application
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011-12-07
 +
| Performed Spud Operation
 
|-
 
|-
| 2012-1
+
| 2012-12-20
| style="text-align:right;" | 0.0
+
| New Permit Application
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2014-03-26
 +
| Inactive Well Request Granted
 
|-
 
|-
| 2012-2
+
| 2018-12-21
| style="text-align:right;" | 0.0
+
| Begin Plugging
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2018-12-27
 +
| Finished Plugging
 
|-
 
|-
| 2013-1
+
| 2019-03-11
| style="text-align:right;" | 0.0
+
| Fully Plugged
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 2013-2
+
|}-->
| style="text-align:right;" | 0.0
+
<!--==== Fluid Composition Data ====
| style="text-align:right;" | 0.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Job Number
| style="text-align:right;" | 0.0
+
!scope="col" | Trade Name
| style="text-align:right;" | 0.0
+
!scope="col" | Supplier
| style="text-align:right;" | 0.0
+
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
| 2014-1
+
|}-->
| style="text-align:right;" | 0.0
+
 
| style="text-align:right;" | 0.0
+
== Production Data ==
| style="text-align:right;" | 0.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Period
| style="text-align:right;" | 0.0
+
!scope="col" | Operator Name
| style="text-align:right;" | 0.0
+
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
 +
| 2011
 +
| [[EOG RESOURCES INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-2
+
| 2012
| style="text-align:right;" | 0.0
+
| [[EOG RESOURCES INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[EOG RESOURCES INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-02
+
| 2014
| style="text-align:right;" | 0.0
+
| [[EOG RESOURCES INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[EOG RESOURCES INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-01
+
| 2016
| style="text-align:right;" | 0.0
+
| [[EOG RESOURCES INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
|-
+
| 2017
| 2015-03
+
| [[SENECA RESOURCES CO LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2012
!scope="col" | FACILITY STATE
+
| [[EOG RESOURCES INC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 574.60 Tons
 +
| LANDFILL
 +
| 101397
 +
|-
 +
| 2018
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 110.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC003
 
|-
 
|-
| 2012-1
+
| 2018
| DRILL CUTTINGS
+
| [[SENECA RESOURCES CO LLC]]
| style="text-align:right;" | 574.6
+
| Produced Fluid
| Tons
+
| style="text-align: right;" | 463.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2018
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 463.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 0.93 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101397
 
| 101397
| ADVANCED DISPOSAL SERVICES GREENTREE LANDFILL
+
|-
| KERSEY
+
| 2019
| PA
+
| [[SENECA RESOURCES CO LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 65.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 552.50 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Servicing Fluid
 +
| style="text-align: right;" | 3.27 Tons
 +
| LANDFILL
 +
| 100361
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 376.66 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Servicing Fluid
 +
| style="text-align: right;" | 592.50 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 38.33 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24099
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 62.47 Tons
 +
| LANDFILL
 +
| 100361
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|  
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 2052393
 
| 2052393
 +
| Primary Facility
 
| 2012-03-21
 
| 2012-03-21
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2254437
 +
| Primary Facility
 +
| 2014-03-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
|
 
|
 
|-
 
 
|-
 
|-
 
| 2310227
 
| 2310227
 +
| Primary Facility
 
| 2014-10-06
 
| 2014-10-06
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2390101
 +
| Primary Facility
 +
| 2015-07-16
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2478879
 +
| Primary Facility
 +
| 2016-04-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
|  
+
|-
 +
| 2575250
 +
| Primary Facility
 +
| 2017-03-27
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine inspection of the Pitch Pine Hunt Club (PPHC) B pad on March 23, 2017. The ESCGP that covers the PPHC B pad was part of Phase- 10 of the Punxsutawney Hunt Club (PHC) development. Phase-10 included the PHC-BB, PHC-CC, and PHC-DD Marcellus pads, and a PHC-AA that was never built.  The PHC BB, CC, and DD pads have been fully restored to approximate original contour with an established perennial vegetative cover, and well site restoration reports have been approved for the wells on each of those pads.  In order to allow the PPHC B pad to remain at full buildout size EOG Resources submitted a major modification to ESX11-033-0008  for installation of upgraded stormwater best management practices to the existing site.  Stormwater BMPs have been installed per ESCGP modifications, the site is stable on cut and fill slopes, with a well established perennial vegetative cover, and compost silt sock has been removed.  A number of perennial springs emanate from the uphill cut slope at the site entrance and along t
 +
|-
 +
| 2815155
 +
| Primary Facility
 +
| 2018-12-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| A routine (pre-plugging) inspection of the PPHC 2H was conducted December 12, 2018. The PPHC 2H is a vertical, uncompleted, unconventional well.
 +
 
 +
I spoke with the plugging contractor on the access road and reviewed the tentative plugging procedure. On location, the 2H was inactive and capped. There cellar was partially filled with ice. There were three  annular vents extending upward from the cellar. The vents were tee'd together and tied into a hose. The end of the hose was visually obstructed with snow/ice. There were no discharges, visible/audible venting, bubbling, or any other obvious issues observed at this time. A NOI to plug this well (2H) has been received. There were two other wells on the pad, the 3H in 4H, both in similar condition as the 2H. No obvious issues were observed at the 3H or 4H as well.
 +
|-
 +
| 2819867
 +
| Primary Facility
 +
| 2018-12-20
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| Plants and Goodwin are on location for final plug and abandonment of several vertical uncompleted wells. They have just finished plugging the PPHC 2H and are now rigged up on the PPHC 3H where they are running in the hole to attainable bottom. I met with the plugging contractor and discussed operations on the pad and plug depths. The 2H was uncovered, topped off with gravel with standing water on top. No bubbling or discharge was observed. No obvious issues were observed or reported at this time.
 +
|-
 +
| 2824216
 +
| Primary Facility
 +
| 2019-01-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On January 8, 2018 I conducted an inspection of the PPHC 2H to investigate the operator's report of bubbling which has now developed approximately 3 weeks after plugging operations. At the time of inspection, the 2H was open at the wellhead flange, full of gravel with standing water on top. Steady bubbling was observed. Combustible gas was detected with an Altair 5x gas meter in the ambient air above the bubbling. I isolated an area that was bubbling with a plastic bag to confirm the presence of combustible gas; readings inside the bag quickly showed 100% LEL, 20% methane and increasing steadily. The plugging contractor is on location preparing to rig up to address the issue. 
 +
 
 +
The 3H and 4H were open and visible; no obvious issues were observed at the 3H and 4H at this time.
 +
|-
 +
| 2827277
 +
| Primary Facility
 +
| 2019-01-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On January 11, 2019 I conducted a routine (plugging) inspection of the PPHC 2H. A rig is on location, rigged up on the well at this time, preparing to run back in the hole to clean out in order to diagnose/address bubbling that developed after plugging operations. BOP has been installed and the crew is cleaning out a tank for returns. The 3H and 4H well cellars were open and full of ice. No new issues were observed at this time.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 15:59, 14 May 2020

Well Details

Well ID: 37-033-27072
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Lawrence Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 149095
Farm/Lease Name: PPHC 3H
License Status: Plugged and Abandoned
Spud Date:
Permit Date: 2011-09-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.143747
Longitude: -78.433156

For data sources see[1][2][3]

Well History

Date Event
2011-09-14 New Permit Application
2011-12-07 Performed Spud Operation
2012-12-20 New Permit Application
2014-03-26 Inactive Well Request Granted
2018-12-21 Begin Plugging
2018-12-27 Finished Plugging
2019-03-11 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 EOG RESOURCES INC 0.00 0 0.00 0 0.00 0
2012 EOG RESOURCES INC 0.00 0 0.00 0 0.00 0
2013 EOG RESOURCES INC 0.00 0 0.00 0 0.00 0
2014 EOG RESOURCES INC 0.00 0 0.00 0 0.00 0
2015 EOG RESOURCES INC 0.00 0 0.00 0 0.00 0
2016 EOG RESOURCES INC 0.00 0 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 EOG RESOURCES INC Drill Cuttings 574.60 Tons LANDFILL 101397
2018 SENECA RESOURCES CO LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2018 SENECA RESOURCES CO LLC Produced Fluid 463.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 463.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 0.93 Tons LANDFILL 101397
2019 SENECA RESOURCES CO LLC Drilling Fluid Waste 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 552.50 Bbl REUSE (AT WELL PAD)
2019 SENECA RESOURCES CO LLC Servicing Fluid 3.27 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 376.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Servicing Fluid 592.50 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 38.33 Bbl INJECTION DISPOSAL WELL 34-155-24099
2019 SENECA RESOURCES CO LLC Drill Cuttings 62.47 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 36.67 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2052393 Primary Facility 2012-03-21 Routine/Complete Inspection No Violations Noted
2254437 Primary Facility 2014-03-18 Routine/Complete Inspection No Violations Noted
2310227 Primary Facility 2014-10-06 Routine/Complete Inspection No Violations Noted
2390101 Primary Facility 2015-07-16 Routine/Complete Inspection No Violations Noted
2478879 Primary Facility 2016-04-26 Routine/Complete Inspection No Violations Noted
2575250 Primary Facility 2017-03-27 Routine/Complete Inspection No Violations Noted Routine inspection of the Pitch Pine Hunt Club (PPHC) B pad on March 23, 2017. The ESCGP that covers the PPHC B pad was part of Phase- 10 of the Punxsutawney Hunt Club (PHC) development. Phase-10 included the PHC-BB, PHC-CC, and PHC-DD Marcellus pads, and a PHC-AA that was never built. The PHC BB, CC, and DD pads have been fully restored to approximate original contour with an established perennial vegetative cover, and well site restoration reports have been approved for the wells on each of those pads. In order to allow the PPHC B pad to remain at full buildout size EOG Resources submitted a major modification to ESX11-033-0008 for installation of upgraded stormwater best management practices to the existing site. Stormwater BMPs have been installed per ESCGP modifications, the site is stable on cut and fill slopes, with a well established perennial vegetative cover, and compost silt sock has been removed. A number of perennial springs emanate from the uphill cut slope at the site entrance and along t
2815155 Primary Facility 2018-12-12 Routine/Complete Inspection No Violations Noted A routine (pre-plugging) inspection of the PPHC 2H was conducted December 12, 2018. The PPHC 2H is a vertical, uncompleted, unconventional well.

I spoke with the plugging contractor on the access road and reviewed the tentative plugging procedure. On location, the 2H was inactive and capped. There cellar was partially filled with ice. There were three annular vents extending upward from the cellar. The vents were tee'd together and tied into a hose. The end of the hose was visually obstructed with snow/ice. There were no discharges, visible/audible venting, bubbling, or any other obvious issues observed at this time. A NOI to plug this well (2H) has been received. There were two other wells on the pad, the 3H in 4H, both in similar condition as the 2H. No obvious issues were observed at the 3H or 4H as well.

2819867 Primary Facility 2018-12-20 Plugging(Includes Plugged/Mined Through) No Violations Noted Plants and Goodwin are on location for final plug and abandonment of several vertical uncompleted wells. They have just finished plugging the PPHC 2H and are now rigged up on the PPHC 3H where they are running in the hole to attainable bottom. I met with the plugging contractor and discussed operations on the pad and plug depths. The 2H was uncovered, topped off with gravel with standing water on top. No bubbling or discharge was observed. No obvious issues were observed or reported at this time.
2824216 Primary Facility 2019-01-08 Routine/Complete Inspection No Violations Noted On January 8, 2018 I conducted an inspection of the PPHC 2H to investigate the operator's report of bubbling which has now developed approximately 3 weeks after plugging operations. At the time of inspection, the 2H was open at the wellhead flange, full of gravel with standing water on top. Steady bubbling was observed. Combustible gas was detected with an Altair 5x gas meter in the ambient air above the bubbling. I isolated an area that was bubbling with a plastic bag to confirm the presence of combustible gas; readings inside the bag quickly showed 100% LEL, 20% methane and increasing steadily. The plugging contractor is on location preparing to rig up to address the issue.

The 3H and 4H were open and visible; no obvious issues were observed at the 3H and 4H at this time.

2827277 Primary Facility 2019-01-11 Routine/Complete Inspection No Violations Noted On January 11, 2019 I conducted a routine (plugging) inspection of the PPHC 2H. A rig is on location, rigged up on the well at this time, preparing to run back in the hole to clean out in order to diagnose/address bubbling that developed after plugging operations. BOP has been installed and the crew is cleaning out a tank for returns. The 3H and 4H well cellars were open and full of ice. No new issues were observed at this time.

For data sources see[7]

References