Well ID: 42-033-26673 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.121268,"lon":-78.342497,"icon":""}]} |
County: Clearfield | |
Municipality: Goshen Township | |
Operator Name: ENERGY CORP OF AMER | |
Farm/Lease Name: WHITETAIL 1 | |
First Permit Date: 2008-06-13 | |
Last Permit Date: 2008-06-13 | |
Spud Date: 2009-01-07 | |
Unconventional: Yes | |
Horizontal: No | |
Producing: Yes | |
Violations: 9 | |
Latitude: 41.121268 | |
Longitude: -78.342497 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1804906 | 2009-06-01 | Outstanding Violations - No Viols Req'd | Site being actively restored. BMPs have been maintained. Pit filled in No E&S issues | |
1811359 | 2009-07-06 | Violation(s) Noted | Site contains multiple areas where channels are beginning to cut through slopes, both on pad and from access road. Seed and mulch are in place, but vegetation is sparse. BMPs are starting to be overrun with sediments | 566677 |
1826585 | 2009-09-08 | No Violations Noted | Inspection revealed the following:
Vegetation growing on disturbed areas of road at about 65% regrowth. Turnouts are becoming stabelized through vegetation. There are no E&S issues on first 200 ft of access road. While approaching well, a young bear came out of tree line and began following access road downhill. Due to implications this posed, my inspection ended at that point. Full inspection will be anticipated for morning of Friday, September 11, 2009 |
|
1829628 | 2009-09-11 | Outstanding Violations - No Viols Req'd | Inspection revealed the following:
-well tag is in place -ditches and previously eroded areas have been heavily lined with rocks. These areas appear to be stable -vegetation on slope above well has grown to about 30% -the slope with continuous erosional issues no longer has seed or mulch and multiple channels are beginning to form along slope -sediments laying against silt fence are deeper than what they were since last being noted -water and sediments have broke through sed fence and hay bales on south east corner of pad and off of southwest corner of "west virginia beach house" trailor where water has been directed to flow across road and into woodline. On-site meeting With Jim Lipsie will be held september 23, 2009 to discuss these issues |
|
1830130 | 2009-09-23 | Outstanding Violations - No Viols Req'd | On-site meeting with Jim Lipsie of EAE, Contractor, Randy Lunger and one co-worker of Dan Beck Construction, and Well tender, Dan Stiver. Focused meeting on slope that continues to erode and can't sustain vegetation. Contractor proposed terracing the slope, spreading large amounts of lime and seeding with a high winter variety seed mix. BMPs will be cleaned up and replaced where necessary. Mr. Lipsie has to run suggestions through his boss and will get back to me as soon as possible with final plan. it has been suggested that the company have a soil test conducted, they use an engineer to design new contruction and create an effective inspection/maintenance schedule for BMPs. | |
1833320 | 2009-10-06 | Outstanding Violations - No Viols Req'd | -Received call from Jim Lipsie on morning of September 28, 2009. Changes to site have been approved and work on site should begin by end of week.
-no changes have been made to date on this site. state of BMPs and slope remain as outlined in inspection reports from September 11 and 24, 2009. |
|
1837965 | 2009-10-15 | Outstanding Violations - No Viols Req'd | -Earthmoving equipment has been staged on-site
-no work has occurred yet -light wet snow has begun to fall creating water flow on site. Breaches in BMPs continue to occur in areas where maintnance/repair is in order. -BMPs need immediate attention |
|
1837989 | 2009-10-23 | Outstanding Violations - No Viols Req'd | -Received call from Jim Lipsie on 22OCT2009: new silt fence in place, ponds installed, and approximately 16 tons of lime applied. Seeding and mulching will be done within the next week
-My Inspection revealed that the row of sliding materials and overburdened silt fence that was directly at the bottom of the hill has been pulled out. Soils were redistributed across slope and new fence installed along the contour. -about 1/3 of the way down the slope, an insloped terrace has been created. -the top edge of the slope has been bermed slightly to direct water into a catch basin rather than allowing it to flow across slope. -line of lime reached to about halfway down slope -disturbed area remains bare without stabilization -a rock lined sediment pond with water bar structure has been installed just prior to old trailor along road below well. -most of the old silt fence, with rotting haybales have been left in place |
|
1838766 | 2009-10-27 | Viol(s) Noted & Immediately Corrected | -recent heavy rain caused additional slope failure
-contractor was on site repairing BMPs, fertilizing, seeding and mulching -new diversion ditch installed to channel water away from slope and into more stable location -sediment trap prevented large amounts of sediments from going into stream, contractor will clean trap out -if vegetation takes, well site should be stabilized, but some additional measures may need to be taken -maintenance schedule should be kept |
574336 |
1843556 | 2009-11-05 | No Violations Noted | -Since last inspection all repairs to compromised BMPs have been made. Silt fence is installed and working properly, the water bar and erosion ditch that was formed in the curve in the lower end of the access road has been rock lined and sediment trap cleaned out.
-all disturbed areas that have not been addressed with rock lining are seeded and mulched with no signs of materials slipping downslope. -the addition of the terrace, upslope diversion ditch, water bar and sediment trap appear to be continually working to keep the slope from failing and reintroducing sediments into the nearby stream. |
|
1849040 | 2009-12-09 | No Violations Noted | Inspection conducted with WQS Jessica Miller.
Site ID sign and E&S Plan on site. Well Tag is on well. Production well in line with a digital meter. 2 3/8 tubing w/artificial lift system installed. Multiple flexible water pump discharge hoses located near water tank. |
|
1849896 | 2009-12-09 | No Violations Noted | - Site covered in approximately 5 inches of snow.
-slope has no apparant signs of failing. Dug into snow some to find vegetation has started growing prior to heavy snowfall. -silt fence shows no signs of failing or being overburdened. -Terracing and ditching of site appear to be remaining stable. |
|
1793017 | 2009-04-03 | Violation(s) Noted | 1) Failure to minimize accelerated erosion- Fill side of pad was not stabilized, recent heavy rains caused erosion to such an extent that primary sediment fence was failing
2) A secondary sedimenr fence was in place, but installed improperly allowing runoff to flow through it freely. Runoff followed the road around a small curve and downhill where it discharged into Little Trout Run. 3) Freeboard in pit fell below 2ft. Note: Sited was visited on 4/2/2009 as well, similar violations were found. Also present during this visit were Curtis Small, Rick Hoover and Bruce Jankura. |
561514 |
1793017 | 2009-04-03 | Violation(s) Noted | 1) Failure to minimize accelerated erosion- Fill side of pad was not stabilized, recent heavy rains caused erosion to such an extent that primary sediment fence was failing
2) A secondary sedimenr fence was in place, but installed improperly allowing runoff to flow through it freely. Runoff followed the road around a small curve and downhill where it discharged into Little Trout Run. 3) Freeboard in pit fell below 2ft. Note: Sited was visited on 4/2/2009 as well, similar violations were found. Also present during this visit were Curtis Small, Rick Hoover and Bruce Jankura. |
561514 |
1793017 | 2009-04-03 | Violation(s) Noted | 1) Failure to minimize accelerated erosion- Fill side of pad was not stabilized, recent heavy rains caused erosion to such an extent that primary sediment fence was failing
2) A secondary sedimenr fence was in place, but installed improperly allowing runoff to flow through it freely. Runoff followed the road around a small curve and downhill where it discharged into Little Trout Run. 3) Freeboard in pit fell below 2ft. Note: Sited was visited on 4/2/2009 as well, similar violations were found. Also present during this visit were Curtis Small, Rick Hoover and Bruce Jankura. |
561515 |
1793017 | 2009-04-03 | Violation(s) Noted | 1) Failure to minimize accelerated erosion- Fill side of pad was not stabilized, recent heavy rains caused erosion to such an extent that primary sediment fence was failing
2) A secondary sedimenr fence was in place, but installed improperly allowing runoff to flow through it freely. Runoff followed the road around a small curve and downhill where it discharged into Little Trout Run. 3) Freeboard in pit fell below 2ft. Note: Sited was visited on 4/2/2009 as well, similar violations were found. Also present during this visit were Curtis Small, Rick Hoover and Bruce Jankura. |
561515 |
1793017 | 2009-04-03 | Violation(s) Noted | 1) Failure to minimize accelerated erosion- Fill side of pad was not stabilized, recent heavy rains caused erosion to such an extent that primary sediment fence was failing
2) A secondary sedimenr fence was in place, but installed improperly allowing runoff to flow through it freely. Runoff followed the road around a small curve and downhill where it discharged into Little Trout Run. 3) Freeboard in pit fell below 2ft. Note: Sited was visited on 4/2/2009 as well, similar violations were found. Also present during this visit were Curtis Small, Rick Hoover and Bruce Jankura. |
561517 |
1793017 | 2009-04-03 | Violation(s) Noted | 1) Failure to minimize accelerated erosion- Fill side of pad was not stabilized, recent heavy rains caused erosion to such an extent that primary sediment fence was failing
2) A secondary sedimenr fence was in place, but installed improperly allowing runoff to flow through it freely. Runoff followed the road around a small curve and downhill where it discharged into Little Trout Run. 3) Freeboard in pit fell below 2ft. Note: Sited was visited on 4/2/2009 as well, similar violations were found. Also present during this visit were Curtis Small, Rick Hoover and Bruce Jankura. |
561517 |
1793017 | 2009-04-03 | Violation(s) Noted | 1) Failure to minimize accelerated erosion- Fill side of pad was not stabilized, recent heavy rains caused erosion to such an extent that primary sediment fence was failing
2) A secondary sedimenr fence was in place, but installed improperly allowing runoff to flow through it freely. Runoff followed the road around a small curve and downhill where it discharged into Little Trout Run. 3) Freeboard in pit fell below 2ft. Note: Sited was visited on 4/2/2009 as well, similar violations were found. Also present during this visit were Curtis Small, Rick Hoover and Bruce Jankura. |
575949 |
1793925 | 2009-04-06 | Violation(s) Noted | The following BMPs had been installed since inspection on 4/3/2009:
1) A third row of sediment fence was installed along the road at the bottom of the hill and anywhere that showed previous avenues of water flow from the well pad. Hay blaes lined both sides of the fence and were staked in place. 2)Areas where sediments accumulated were heavily mulched 3) One channel crossing lower road was lined with large stone Note: stream is visibly clearer where sediments were discharging into it Deficiencies: 1) accelerated erosion on fill side not stabilized 2) Freeboard still not below 2ft NOV sent to company |
575947 |
1793925 | 2009-04-06 | Violation(s) Noted | The following BMPs had been installed since inspection on 4/3/2009:
1) A third row of sediment fence was installed along the road at the bottom of the hill and anywhere that showed previous avenues of water flow from the well pad. Hay blaes lined both sides of the fence and were staked in place. 2)Areas where sediments accumulated were heavily mulched 3) One channel crossing lower road was lined with large stone Note: stream is visibly clearer where sediments were discharging into it Deficiencies: 1) accelerated erosion on fill side not stabilized 2) Freeboard still not below 2ft NOV sent to company |
575948 |
1793925 | 2009-04-06 | Violation(s) Noted | The following BMPs had been installed since inspection on 4/3/2009:
1) A third row of sediment fence was installed along the road at the bottom of the hill and anywhere that showed previous avenues of water flow from the well pad. Hay blaes lined both sides of the fence and were staked in place. 2)Areas where sediments accumulated were heavily mulched 3) One channel crossing lower road was lined with large stone Note: stream is visibly clearer where sediments were discharging into it Deficiencies: 1) accelerated erosion on fill side not stabilized 2) Freeboard still not below 2ft NOV sent to company |
575950 |
1793968 | 2009-04-14 | Outstanding Violations - No Viols Req'd | 1) company seeded and heavily mulched fill side of well pad. Erosion stabilized.
2) Pit has been pumped to maintain more than 2ft of freeboard |
|
1763125 | 2009-01-07 | No Violations Noted | rigging up, prognosis estimates TD @ 9,000', site in HQ watershed, no e/s problems | |
1764653 | 2009-01-16 | No Violations Noted | drilling/E&S ok/pit ok/ID&plan ok | |
1765323 | 2009-01-16 | No Violations Noted | drilling at 4,700', pit ok | |
1768353 | 2009-02-04 | No Violations Noted | drilling in progress/E&S ok/pit ok/ID ok | |
1869811 | 2010-03-15 | No Violations Noted | - Site ID sign, and E&S plan remain on site, well is complete and tag in place
- All E&S controls remain in place and working adequately. All of the snow has melted and vegetation is beginning to grow. - there are still some minor spots of erosion on site, but no sediments are leaving the site. |
|
1876802 | 2010-04-06 | No Violations Noted | - Vegetation continues to grown back and is at about about 30% uniform coverage. There are a few bare spots along the terrace and below the slope that may need reapplication of seed and mulch.
-BMPs remain installed and working adequately. There are very few signs of previous erosion remaining on site. |
|
1969615 | 2011-05-02 | No Violations Noted | ||
1972354 | 2011-05-12 | No Violations Noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 445.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 3008.0 | 170.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 8118.0 | 347.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 10494.0 | 266.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2008-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2009-0 | BRINE | 480.0 | Bbl | BRINE OR INDUSTRIAL WASTE TREATMENT PLT | TUNNELTON LIQUIDS COMPANY | |||
2010-3 | PRODUCED FLUID | 160.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | PA | ||
2010-3 | PRODUCED FLUID | 320.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2010-2 | PRODUCED FLUID | 80.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |