If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22610 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.813186,"lon":-79.724783,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Winfield Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 154293 | |
Farm/Lease Name: PER W22 | |
License Status: | |
Spud Date: 2017-07-02 | |
Permit Date: 2017-06-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.813186 | |
Longitude: -79.724783 |
Date | Event |
---|---|
2017-06-14 | New Permit Application |
2017-07-02 | Performed Spud Operation |
2017-09-09 | Drilling Completion |
2017-12-19 | Performed Stage 1 of Stimulation |
2017-12-20 | Perforation |
2017-12-20 | Performed Stage 2 of Stimulation |
2017-12-20 | Performed Stage 3 of Stimulation |
2017-12-20 | Performed Stage 4 of Stimulation |
2017-12-20 | Performed Stage 5 of Stimulation |
2017-12-21 | Perforation |
2017-12-21 | Performed Stage 10 of Stimulation |
2017-12-21 | Performed Stage 6 of Stimulation |
2017-12-21 | Performed Stage 7 of Stimulation |
2017-12-21 | Performed Stage 8 of Stimulation |
2017-12-21 | Performed Stage 9 of Stimulation |
2017-12-22 | Perforation |
2017-12-22 | Performed Stage 11 of Stimulation |
2017-12-22 | Performed Stage 12 of Stimulation |
2017-12-22 | Performed Stage 13 of Stimulation |
2017-12-22 | Performed Stage 14 of Stimulation |
2017-12-23 | Performed Stage 15 of Stimulation |
2017-12-27 | Perforation |
2017-12-28 | Perforation |
2017-12-28 | Performed Stage 16 of Stimulation |
2017-12-28 | Performed Stage 17 of Stimulation |
2017-12-28 | Performed Stage 18 of Stimulation |
2017-12-28 | Performed Stage 19 of Stimulation |
2017-12-29 | Perforation |
2017-12-29 | Performed Stage 20 of Stimulation |
2017-12-29 | Performed Stage 21 of Stimulation |
2017-12-29 | Performed Stage 22 of Stimulation |
2017-12-29 | Performed Stage 23 of Stimulation |
2017-12-30 | Performed Stage 24 of Stimulation |
2018-01-02 | Perforation |
2018-01-02 | Performed Stage 25 of Stimulation |
2018-01-02 | Performed Stage 26 of Stimulation |
2018-01-03 | Perforation |
2018-01-03 | Performed Stage 27 of Stimulation |
2018-01-03 | Performed Stage 28 of Stimulation |
2018-01-03 | Performed Stage 29 of Stimulation |
2018-01-03 | Performed Stage 30 of Stimulation |
2018-01-03 | Performed Stage 31 of Stimulation |
2018-01-04 | Perforation |
2018-01-04 | Performed Stage 32 of Stimulation |
2018-01-04 | Performed Stage 33 of Stimulation |
2019-01-22 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-12-19 | 2018-01-04 | 6,347 | 15,551,700 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 92.5 | 2.10301 | 3,169,840.0 |
BIOC12031A | Nalco | Biocide | Listed Below | |||||
TRS 17888 | Tight Rock Solutions | Friction Reducer | Listed Below | |||||
Sand (Proppant) | Sargent/Momentive/Prefferred | Proppant | Listed Below | |||||
Hydrochloric Acid (7.5%) | PVS | Acidizing | Water | 7732-18-5 | 92.5 | 2.10301 | 3,169,840.0 | |
TRS 3001 | Tight Rock Solutions | Scale Control | Listed Below | |||||
Unihib G | Geosafe | Corrosion Inhibitor | Listed Below | |||||
TRS 11800 | Tight Rock Solutions | Friction Reducer | Listed Below | |||||
Thiourea | 0000062-56-6 | 1 | 0.00000989 | 14.901 | ||||
Alcohols C10-16, ethoxylated | 0068002-97-1 | 50 | 0.000494293 | 745.042 | ||||
Formaldehyde | 0000050-00-0 | 1 | 0.00000989 | 14.901 | ||||
Ethylene Glycol | 107-21-1 | 5 | 0.000992182 | 1495.5 | ||||
Sodium Phosphate, Tribasic | 7601-54-9 | 5 | 0.000992182 | 1495.5 | ||||
Inorganic Salt | PROPRIETARY | 10 | 0.00340322 | 5129.62 | ||||
Thiourea | 0000062-56-6 | 1 | 0.00000989 | 14.901 | ||||
Ethylene Glycol | 107-21-1 | 5 | 0.000992182 | 1495.5 | ||||
Sodium Phosphate, Tribasic | 7601-54-9 | 5 | 0.000992182 | 1495.5 | ||||
Amine Triphosphate | PROPRIETARY | 30 | 0.00595309 | 8973.02 | ||||
Inorganic Salt | PROPRIETARY | 10 | 0.00610763 | 9205.95 | ||||
Methanol | 0000067-56-1 | 5 | 0.00004943 | 74.504 | ||||
Butyl digycol | 0000112-34-5 | 75 | 0.00074144 | 1117.56 | ||||
Formaldehyde | 0000050-00-0 | 1 | 0.00000989 | 14.901 | ||||
Substituted alkylamine | PROPRIETARY | 1 | 0.000340321 | 512.962 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0102096 | 15388.9 | ||||
Oxyalkylated alcohol | PROPRIETARY | 5 | 0.00305382 | 4602.98 | ||||
Ammonium persulfate | 7727-54-0 | 100 | 0.000388115 | 585 | ||||
Substituted alkylamine | PROPRIETARY | 1 | 0.000340321 | 512.962 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.170514 | 257014 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00597158 | 9000.88 | ||||
Alcohols C10-16, ethoxylated | 0068002-97-1 | 50 | 0.000494293 | 745.042 | ||||
Oxyalkylated alcohol | PROPRIETARY | 5 | 0.00305382 | 4602.98 | ||||
Inorganic Salt | PROPRIETARY | 10 | 0.00610763 | 9205.95 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0183229 | 27617.9 | ||||
Methanol | 0000067-56-1 | 5 | 0.00004943 | 74.504 | ||||
Oxyalkylated alcohol | PROPRIETARY | 5 | 0.00170161 | 2564.81 | ||||
Oxyalkylated alcohol | PROPRIETARY | 5 | 0.00170161 | 2564.81 | ||||
Alkyl Alcohol | PROPRIETARY | 10 | 0.00610763 | 9205.95 | ||||
Silica Substrate | 14808-60-7 | 100 | 11.4891 | 17,317,400.0 | ||||
Alkyl Alcohol | PROPRIETARY | 10 | 0.00610763 | 9205.95 | ||||
Inorganic Salt | PROPRIETARY | 10 | 0.00340322 | 5129.62 | ||||
Water | Company 1 | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.1011 | 129,779,000.0 | |
AP Breaker | Lubrizol | Breaker | Listed Below |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-12-19 | 1 | Sand | 6,519,598 | 8,096 | 5,192 |
2017-12-20 | 2 | Sand | 6,519,598 | 9,007 | 5,888 |
2017-12-20 | 3 | Sand | 6,519,598 | 8,247 | 5,069 |
2017-12-20 | 4 | Sand | 6,519,598 | 8,098 | 5,469 |
2017-12-20 | 5 | Sand | 6,519,598 | 9,167 | 4,965 |
2017-12-21 | 6 | Sand | 6,519,598 | 8,050 | 6,708 |
2017-12-21 | 7 | Sand | 6,519,598 | 7,762 | 5,265 |
2017-12-21 | 8 | Sand | 6,519,598 | 7,560 | 6,079 |
2017-12-21 | 9 | Sand | 6,519,598 | 8,083 | 5,659 |
2017-12-21 | 10 | Sand | 6,519,598 | 8,065 | 5,759 |
2017-12-22 | 11 | Sand | 6,519,598 | 8,123 | 5,642 |
2017-12-22 | 12 | Sand | 6,519,598 | 7,603 | 6,155 |
2017-12-22 | 13 | Sand | 6,519,598 | 8,100 | 6,057 |
2017-12-22 | 14 | Sand | 6,519,598 | 7,736 | 6,350 |
2017-12-23 | 15 | Sand | 6,519,598 | 8,101 | 5,776 |
2017-12-28 | 16 | Sand | 6,519,598 | 7,804 | 7,143 |
2017-12-28 | 17 | Sand | 6,519,598 | 7,714 | 6,600 |
2017-12-28 | 18 | Sand | 6,519,598 | 7,796 | 6,709 |
2017-12-28 | 19 | Sand | 6,519,598 | 7,737 | 7,586 |
2017-12-29 | 20 | Sand | 6,519,598 | 7,575 | 6,777 |
2017-12-29 | 21 | Sand | 6,519,598 | 7,471 | 5,711 |
2017-12-29 | 22 | Sand | 6,519,598 | 7,331 | 6,245 |
2017-12-29 | 23 | Sand | 6,519,598 | 7,802 | 6,969 |
2017-12-30 | 24 | Sand | 6,519,598 | 7,289 | 5,735 |
2018-01-02 | 25 | Sand | 6,519,598 | 7,558 | 5,388 |
2018-01-02 | 26 | Sand | 6,519,598 | 9,255 | 5,193 |
2018-01-03 | 27 | Sand | 6,519,598 | 8,032 | 6,502 |
2018-01-03 | 28 | Sand | 6,519,598 | 7,454 | 4,744 |
2018-01-03 | 29 | Sand | 6,519,598 | 7,984 | 7,158 |
2018-01-03 | 30 | Sand | 6,519,598 | 7,746 | 6,251 |
2018-01-03 | 31 | Sand | 6,519,598 | 7,337 | 5,268 |
2018-01-04 | 32 | Sand | 6,519,598 | 7,324 | 5,884 |
2018-01-04 | 33 | Sand | 6,519,598 | 7,107 | 6,292 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNENERGY RESOURCES LLC | 771,357.00 | 194 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNENERGY RESOURCES LLC | 946,517.00 | 364 | 0.00 | 0 | 0.00 | 31 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | PENNENERGY RESOURCES LLC | Drill Cuttings | 813.10 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2017 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 510.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 120.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2017 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 120.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2017 | PENNENERGY RESOURCES LLC | Other Oil & Gas Wastes | 20.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 750.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 49.79 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Drill Cuttings | 2.12 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Filter Socks | 0.47 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 8,759.52 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 107.39 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 6.84 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 34.33 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Servicing Fluid | 12.68 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 3.33 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Soil Contaminated by Oil & Gas Related Spills | 0.61 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Soil Contaminated by Oil | 0.61 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 44.73 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 481.70 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 14.45 Bbl | INJECTION DISPOSAL WELL | 34-099-2-3171 |
2019 | PENNENERGY RESOURCES LLC | Waste Water Treatment Sludge | 8.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 364.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 120.24 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2019 | PENNENERGY RESOURCES LLC | Synthetic Liner Materials | 2.30 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 14,061.88 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 156.07 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2613229 | Primary Facility | 2017-07-07 | Routine/Partial Inspection | No Violations Noted | |
2625312 | Primary Facility | 2017-08-08 | Drilling/Alteration | No Violations Noted | |
2625331 | Primary Facility | 2017-08-09 | Drilling/Alteration | No Violations Noted | |
2627284 | Primary Facility | 2017-08-15 | Routine/Partial Inspection | No Violations Noted | |
2636603 | Primary Facility | 2017-09-11 | Drilling/Alteration | No Violations Noted | At the time of inspection, Patterson 259 is onsite waiting on cement after finishing production casing cement job. A lead 1 of 330 sxs (70 bbls) HalCem, 14.5 ppg, 1.197 yield, a lead 2 of 1010 sxs (216 bbls) ShaleCem, 14.5 ppg, 1.2 yield, and tail of 1060 sxs (345 bbls) SoluCem, 15.2 ppg, 1.825 yield. Displacement was 305 bbls. Plug was bumped and floats held. 33 bbls cement was returned to surface. Pad has been fenced in as well as the impoundment, which is just up the hill from well pad. |
2645019 | Primary Facility | 2017-10-10 | Administrative/File Review | No Violations Noted | |
2675669 | Primary Facility | 2017-12-28 | Routine/Partial Inspection | No Violations Noted | Multiple heating units onsite to keep equipment from freezing up. |
2729580 | Primary Facility | 2018-05-14 | Administrative/File Review | No Violations Noted | |
2755027 | Primary Facility | 2018-07-23 | Routine/Partial Inspection | No Violations Noted | On 7/23/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Six wells drilled; 1H-019-22606, 2H-019-22607, 3H-019-22608, 4H-019-22609, 5H-019-22610 and 6H-019-22611. Erosion and Sedimentation BMPs maintained. Vegetative growth well established in previously disturbed areas. |
2803264 | Primary Facility | 2018-11-14 | Routine/Partial Inspection | No Violations Noted | On 11/14/2018, WQS Brian MacQuarrie onsite. Six wells in production, 1H-019-22606, 2H-019-22607, 3H-019-22608, 4H-019-22609, 5H-019-22610 and 6H-019-22611. Tank battery consists of three 400 bbl tanks installed within secondary containment. Tank pad has large AST installed containing impaired water. Freshwater impoundment installed and fenced in. Well development pipeline installed along access road. Erosion and Sedimentation BMPs maintained. Well site vegetated in previously disturbed areas. |
2838731 | Primary Facility | 2019-02-08 | Routine/Partial Inspection | No Violations Noted | On 2/8/2019, WQS Brian MacQuarrie onsite. Site sign maintained at entrance to site. Six wells in production; the 1H (019-22606), 2H (019-22607), 3H (019-22608), 4H (019-22609), 5H (019-22610) and 6H (019-22611). Wells are properly tagged at well head. Production equipment consists of three multi well gas processing units. Tank battery consists of three 400 bbl tanks installed within stainless steel containment structure. Temporary AST installed and maintained on tank pad. Freshwater impoundment fenced in and locked. Erosion and Sedimentation BMPs installed and maintained. Previously disturbed areas well vegetated. |
For data sources see[9]